  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 4 of 4  Not logged in ELOG logo
ID Date Author Projectup Subject Run Number Events StartTime EndTime Data
  54   Tue Oct 23 15:55:58 2012 Markus FriedlMicronOrigami_grosscalcal0268380023.10.2012 14:56:4723.10.2012 15:42:17 Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

  55   Tue Oct 23 16:06:09 2012 Markus FriedlMicronOrigami_grossrunrun02610212423.10.2012 16:04:4723.10.2012 23:04:56Unknown

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable.

  56   Tue Oct 23 23:12:03 2012 Thomas BergauerMicronOrigami_grossrunrun02722084723.10.2012 23:10:1424.10.2012 08:19:51Unknown

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
 
SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable.
  57   Wed Oct 24 08:25:04 2012 Thomas BergauerMicronOrigami_grosscalcal0278380024.10.2012 08:22:2524.10.2012 09:10:19Unknown

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
  58   Wed Oct 24 09:51:41 2012 Thomas BergauerMicronOrigami_grosscalcal0288380024.10.2012 09:50:5324.10.2012 10:39:43Unknown

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-2.5V, Ibias=14.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
  59   Wed Oct 24 17:24:40 2012 Thomas BergauerMicronOrigami_grossrun ohne Strom ;-(run028   Unknown

 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-2.5V, Ibias=14.5uA

Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29

= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3

= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

NO DATATAKING BECAUSE OF POWER FAILURE AT NIM CRATE (counter finster, warum?). Georg schaut sich das an, sobald in der zone access ist.

Auch AnnekathrinPC ist nicht erreichbar. 

 

  63   Sat Oct 27 19:36:24 2012 Markus FriedlMicronOrigami_grosscalcal0318380027.10.2012 19:59:5027.10.2012 20:44:38Good

Belle stack 2 after irradiation

HV = +50V -50V

I = 112 µA

CO2 cooling

  64   Sat Oct 27 21:49:08 2012 Markus FriedlMicronOrigami_grossrunrun031150k27.10.2012 21:42:4628.10.2012 02:35:55 (+1h due to winter time)Good

Belle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA
CO2 cooling

 

  65   Sun Oct 28 02:51:49 2012 Markus FriedlMicronOrigami_grossrunrun032150k28.10.2012 02:47:2428.10.2012 08:31:19 Good

Belle stack 2 after gamma irradiation

HV = +50V -50V

I = 101 uA

Bias currents absolutely stable during the whole run.

CO2 cooling

hitting APV3 (n side) = wide side of wedge sensor

  66   Sun Oct 28 08:37:53 2012 Christian IrmlerMicronOrigami_grossrunrun0336693728.10.2012 08:33:4228.10.2012 14:10:43 Unknown

Belle stack 2 after gamma irradiation

HV = +50V -50V

I = 101 uA

CO2 cooling

hitting APV2 (n side) = center of wedge sensor

 

Temperatur sensors:

  • T11: Origami #4 in
  • T12: Origami #4 out
  • T13: Origami #3 in (still wrong values!)
  • T14: Origami #3 out
  • T15: Wedge new 1 out
  • T16: Wedge old out
  • T17: Wedge new 1 cooling block
  • T18: Wedge old cooling block
Attachment 1: temp_run33.JPG
temp_run33.JPG
Attachment 2: temp_run33_2.JPG
temp_run33_2.JPG
  77   Tue Oct 30 17:24:01 2012 Markus FriedlMicronOrigami_grosscalcal0408380030.10.2012 17:20:28 30.10.2012 17:54:09Unknown

Cooling for 2DSSD established after some struggle.

2DSSD fully read out with cooling
HV= +40 V -40 V    I = 2 uA
Beam position: none

 

Positions of thermal sensors:

11   Kapillare Anfang

12   Kapillare Ende

13   ---

14   unmittelbar nach Kapillare

15   Origami in

16   Origami out

17   Origami -z

18   Origami CE

 

Strip order:

n-Seite: rechts (Salev) nach links (Jura)

p-Seite: oben nach unten

 

APV chips with lower noise:

                          -z                                   ce
p-side             #5                                #10 (= pos 4)
n-side             #13 (= pos1)             #19 (= pos 3)

  78   Tue Oct 30 18:35:51 2012 Christian IrmlerMicronOrigami_grossrunrun040100k30.10.2012 18:23:2130.10.2012 21:55:53 Unknown

Cooling for 2DSSD established after some struggle.

2DSSD fully read out with cooling
HV= +40 V -40 V    I = 2.1 uA

Beam position:
  Origami -z 
  p-side: APV #5 
  n-side: APV #13 (= pos.1 of -z)

 

Positions of thermal sensors:

11   Kapillare Anfang

12   Kapillare Ende

13   ---

14   unmittelbar nach Kapillare

15   Origami in

16   Origami out

17   Origami -z

18   Origami CE

 

Strip order:

n-Seite: rechts (Salev) nach links (Jura)

p-Seite: oben nach unten

 

APV chips with lower noise:

                          -z                                   ce
p-side             #5                                #10 (= pos 4)
n-side             #13 (= pos1)             #19 (= pos 3)

Attachment 1: temperatures_run040.jpg
temperatures_run040.jpg
  79   Tue Oct 30 22:15:41 2012 Markus FriedlMicronOrigami_grossrunrun041100k30.10.2012 22:09:13 Unknown

Cooling for 2DSSD established after some struggle.

2DSSD fully read out with cooling
HV= +40 V -40 V    I =  1.84 uA

Beam position: 
Origami ce:
   p-side:  APV #10  (= pos 4)
   n-side:  APV #19  (= pos 3)

Positions of thermal sensors:

11   Kapillare Anfang

12   Kapillare Ende

13   ---

14   unmittelbar nach Kapillare

15   Origami in

16   Origami out

17   Origami -z

18   Origami CE

 

Strip order:

n-Seite: rechts (Salev) nach links (Jura)

p-Seite: oben nach unten

 

APV chips with lower noise:

                          -z                                   ce
p-side             #5                                #10 (= pos 4)
n-side             #13 (= pos1)             #19 (= pos 3)

 

 

 

Attachment 1: temperatures_run041.jpg
temperatures_run041.jpg
  1   Fri Oct 12 15:04:55 2012 Marko DragiceviccommonNetwork configuration    Unknown

Router:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
connected on outlet 0887-1:4602/02

Devices
DAQPC: 192.168.0.36
Slowcontrol (REINRAUMLAPTOP): 192.168.0.37
AnneKathrinPC (AOH): 192.168.0.40
GPIB->Ethernet: 192.168.0.240
Coolingbox: 192.168.0.148
XY Table: 192.168.0.13
VAIO (CONF1): 192.168.0.42
BeamControl: 137.138.113.210 CWO-HNA447-H6A.CERN.CH
VMheros am DAQPC: 192.168.0.47
 

Port Forwards:
DAQPC (192.168.0.36): 5901
Slowcontrol (192.168.0.37): 5902
AnneKathrinPC (192.168.0.40): 5903
VAIO (CONF1) (192.168.0.42): 5904
VMheros am DAQPC (192.168.0.47): 5022

Comments:
Remote Control von CESAR:
$ x11vnc -bg -forever

  5   Fri Oct 12 23:51:35 2012 Markus FriedlcommonZimmernummer & Telefonnummern    Unknown

2nd week:

Markus: 38 - 420   (phone: 70 420)

Thomas: 38 - 431   (phone: 70 431)

Chrisu: 38 - 428   (phone:  70 428)

Manni: 38 - 434   (phone: 70 434)

 

1st week:

Markus: 41 - 130   (phone: 60 130)

Annekathrin: 41 - 206   (phone: 60 206)

Thomas: 39 - 108   (phone: 79 108)

Chrisu: 41 - 224   (phone: 60 224)

Manni: 39 - 317   (phone: 79 317)

Marko: 39 - 206   (phone: 79 206)

 

HEPHYs CERN Handy: 162471 

 

Bat. 887 HNA-451:  C3568Y

Bat. 887 HNA-447: 12345 (westseitige Tür)

  6   Fri Oct 12 23:52:57 2012 Markus FriedlcommonSozialisierung    Unknown

Prost, Bergi!

(Das ist nur ein Test, ob du wirklich all die Elog-Emails liest.)

  21   Mon Oct 15 19:21:56 2012 Marko DragiceviccommonBeam settings and profile    Unknown

Beam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad) PARALL IN H6A; RD42

Kommentar (Marko):
Das alte Beam Setting File war optimiert fuer H6B, sprich der Beam Focus war dort. Dieses Setting ist neuer und hat den Focus in H6B.

Attachment 1: NetBeans_IDE_3.5_15-Oct-12_19-28-32.png
NetBeans_IDE_3.5_15-Oct-12_19-28-32.png
  30   Tue Oct 16 23:03:09 2012 Markus FriedlcommonSozialisierung    Unknown

So steuert man einen Testbeam!

fondue.jpg

Attachment 1: IMAG2041.jpg
IMAG2041.jpg
  36   Thu Oct 18 09:14:07 2012 Manfred ValentancommonFahrt nach Mol    Unknown

 Liebe Kollegen,

wir brechen. auf. Wünscht uns Glück!

  80   Wed Oct 31 15:54:59 2012 Christian IrmlercommonEthernetkabel zu H6A    Unknown

Ethernetkabel HNA447 -> H6A:

Das obere Ende im Counting Hut liegt im Zwischenboden unterhalb der orangenen Steckdose beim Eingang mit dem elektronischen Zahlenschloß.

Das untere Ende in der Zone hängt aufgerollt an einem Pfeiler der Kabeltasse, unweit der Stelle an der das Kabel von oben hinunter gelassen wurden. Das ist ewta dort wo die Stiege zu PPE146 endet.

siehe Fotos :)

Attachment 1: 2012-10-31_15.47.42.jpg
2012-10-31_15.47.42.jpg
Attachment 2: 2012-10-31_12.28.32.jpg
2012-10-31_12.28.32.jpg
ELOG V3.1.5-fc6679b