Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 4 of 4  Not logged in ELOG logo
ID Date Author Project Subjectup Run Number Events StartTime EndTime Data Text Attachments
  56   Tue Oct 23 23:12:03 2012 Thomas BergauerMicronOrigami_grossrunrun02722084723.10.2012 23:10:1424.10.2012 08:19:51Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position:
  
  61   Sat Oct 27 01:13:47 2012 Christian IrmlerMicronBabyrunrun029307k27.10.2012 01:02:4927.10.2012 07:36:34GoodAfter irradiation
xy-table: x=319.4, y=74.6
beam hits APV0
  
  62   Sat Oct 27 07:51:49 2012 Manfred ValentanMicronBabyrunrun03037667827.10.2012 07:49:0927.10.2012 17:32:07GoodAfter irradiation
xy-table: x=319.4, y=87.6
beam hits APV1
  
  64   Sat Oct 27 21:49:08 2012 Markus FriedlMicronOrigami_grossrunrun031150k27.10.2012 21:42:4628.10.2012 02:35:55 (+1h due to winter time)GoodBelle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA
  
  65   Sun Oct 28 02:51:49 2012 Markus FriedlMicronOrigami_grossrunrun032150k28.10.2012 02:47:2428.10.2012 08:31:19 GoodBelle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
  
  66   Sun Oct 28 08:37:53 2012 Christian IrmlerMicronOrigami_grossrunrun0336693728.10.2012 08:33:4228.10.2012 14:10:43 UnknownBelle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
 temp_run33.JPGtemp_run33_2.JPG 
  68   Sun Oct 28 16:22:35 2012 Christian IrmlerMicronBabyrunrun03410186428.10.2012 16:12:24 28.10.2012 18:34:24GoodMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  69   Sun Oct 28 20:07:28 2012 Markus FriedlMicronBabyrunrun03530411028.10.2012 20:01:4829.10.2012 03:50:44GoodMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  70   Mon Oct 29 04:02:16 2012 Manfred ValentanMicronBabyrunrun03629629429.10.2012 03:53:3329.10.2012 11:05:35UnknownMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  72   Mon Oct 29 12:24:41 2012 Markus FriedlInfineonrunrun03730138229.10.2012 12:22:2229.10.2012 21:05:57GoodInfineon stack Version 2 after irradiation
HV = +300 V
I = 162 A
  
  74   Mon Oct 29 23:13:52 2012 Markus FriedlHPK_babyrunrun03847650029.10.2012 23:13:0530.10.2012 10:22:54UnknownHPK baby stack after irradiation with partial
cooling (HPK neutron & HPK neutron/gamma)
HV = +75 V  -75V
  
  76   Tue Oct 30 11:05:32 2012 Markus FriedlHPK_babyrunrun039150k30.10.2012 11:03:1930.10.2012 14:57:57UnknownHPK baby stack after irradiation - no cooling
I =  420A and growing (warming
up)
  
  78   Tue Oct 30 18:35:51 2012 Christian IrmlerMicronOrigami_grossrunrun040100k30.10.2012 18:23:2130.10.2012 21:55:53 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run040.jpg 
  79   Tue Oct 30 22:15:41 2012 Markus FriedlMicronOrigami_grossrunrun041100k30.10.2012 22:09:13 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run041.jpg 
  22   Mon Oct 15 19:40:03 2012 Marko DragicevicMicronOrigami_grossrun ATTENTION: wrong bias voltagerun0093165015.10.2012 19:28:30 15.10.2012 22:08:31 CrapATTENTION! Bias voltage was +-100 V instead
of +-50 V 
Origami Stack 2: Origami #4, #3,
  
  24   Mon Oct 15 23:26:52 2012 Marko DragicevicMicronOrigami_grossrun ATTENTION: wrong bias voltagerun010158k15.10.2012 23:10:40 16.10.2012 05:05:35CrapATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Same as run009.
  
  25   Tue Oct 16 05:24:21 2012 Christian IrmlerMicronOrigami_grossrun ATTENTION: wrong bias voltagerun011150k16.10.2012 05:19:28 16.10.2012 09:59:24CrapATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Origami Stack 2: Origami #4, #3,
  
  59   Wed Oct 24 17:24:40 2012 Thomas BergauerMicronOrigami_grossrun ohne Strom ;-(run028   Unknown 
Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
  
  9   Sat Oct 13 19:04:02 2012 Manfred ValentanMicronOrigami_grossrun with Belle stack 3run00330k13.10.2012 19:02:31 Unknown Belle stack 3: 2DSSD-Origami, Wedge_New_1,
Wedge_old
HV = +- 50V
  
  11   Sat Oct 13 23:01:54 2012 Markus FriedlMicronOrigami_grossrun with Belle stack 3run00430k13.10.2012 21:41:3413.10.2012 22:57:48UnknownBelle stack 3, other position (CE)
 
Position of xy table:
  
ELOG V3.1.5-fc6679b