Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 1 of 4  Not logged in ELOG logo
ID Date Authorup Project Subject Run Number Events StartTime EndTime Data Text Attachments
  2   Fri Oct 12 19:42:36 2012 Christian IrmlerMicronBabyConfiguration of normal stack    UnknownMicron baby stack with all strips connected
to APV chips
n-side faces the beam, p-side not
 micronbaby_stack_geometry.jpg 
  3   Fri Oct 12 22:00:52 2012 Christian IrmlerMicronBabycalcal0018380012.10.2012 21:16:3312.10.2012 21:59:02Good12.10.2012  21:16:33  event=0 
Disk space: Needed=0.00 GB, Available=206.59
GB, Total=931.51 GB
  
  4   Fri Oct 12 23:10:14 2012 Christian IrmlerMicronBabyrunrun00133300012.10.2012 23:05:1913.10.2012 06:29:00GoodMicron baby stack
HV = -100V   I=5.8uA
beam on
  
  25   Tue Oct 16 05:24:21 2012 Christian IrmlerMicronOrigami_grossrun ATTENTION: wrong bias voltagerun011150k16.10.2012 05:19:28 16.10.2012 09:59:24CrapATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Origami Stack 2: Origami #4, #3,
  
  26   Tue Oct 16 11:07:17 2012 Christian IrmlerMicronOrigami_grosscalcal0068380016.10.2012 10:30:3416.10.2012 11:00:51UnknownOrigami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=5.12µA
  
  27   Tue Oct 16 11:23:43 2012 Christian IrmlerMicronOrigami_grossrunrun01220k16.10.2012 11:16:0116.10.2012 12:27:03 UnknownOrigami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=10.4µA
 belle_2a_temperatures.jpg 
  28   Tue Oct 16 13:59:46 2012 Christian IrmlerMicronOrigami_grossrunrun013150k16.10.2012 13:43:0516.10.2012 20:21:04UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V
 belle_2_temperatures.jpg 
  29   Tue Oct 16 22:19:21 2012 Christian IrmlerMicronOrigami_grosscalcal0078380016.10.2012 20:25:17 16.10.2012 21:12:01 UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V, Ibias=12.3µA
  
  31   Tue Oct 16 23:35:28 2012 Christian IrmlerMicronOrigami_grossrunrun014150k16.10.2012 23:32:2417.10.2012 04:59:02 UnknownSame as run011, but now with +- 50V bias
voltage.
Origami Stack 2: Origami #4, #3,
 run014_temperatures.jpg 
  33   Wed Oct 17 05:16:22 2012 Christian IrmlerMicronOrigami_grossrunrun0155400517.10.2012 05:10:0617.10.2012 07:27:20UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V
 run015_temperatures.JPG 
  60   Sat Oct 27 00:43:55 2012 Christian IrmlerMicronBabycalcal0298380027.10.2012 00:10:1527.10.2012 00:36:55GoodAfter irradiation
 
Micron baby stack after gamma irrdiation
  
  61   Sat Oct 27 01:13:47 2012 Christian IrmlerMicronBabyrunrun029307k27.10.2012 01:02:4927.10.2012 07:36:34GoodAfter irradiation
xy-table: x=319.4, y=74.6
beam hits APV0
  
  66   Sun Oct 28 08:37:53 2012 Christian IrmlerMicronOrigami_grossrunrun0336693728.10.2012 08:33:4228.10.2012 14:10:43 UnknownBelle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
 temp_run33.JPGtemp_run33_2.JPG 
  68   Sun Oct 28 16:22:35 2012 Christian IrmlerMicronBabyrunrun03410186428.10.2012 16:12:24 28.10.2012 18:34:24GoodMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  78   Tue Oct 30 18:35:51 2012 Christian IrmlerMicronOrigami_grossrunrun040100k30.10.2012 18:23:2130.10.2012 21:55:53 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run040.jpg 
  80   Wed Oct 31 15:54:59 2012 Christian IrmlercommonEthernetkabel zu H6A    UnknownEthernetkabel HNA447 -> H6A:
Das obere Ende im Counting Hut liegt
im Zwischenboden unterhalb der orangenen
 2012-10-31_15.47.42.jpg2012-10-31_12.28.32.jpg 
  7   Sat Oct 13 06:55:47 2012 Manfred ValentanMicronBabyrunrun00223401913.10.2012 06:50:0013.10.2012 13:50:40UnknownMicron baby stack
HV = -100V   I=5.4uA
beam on
  
  8   Sat Oct 13 14:44:47 2012 Manfred ValentanMicronOrigami_grossStack configuration, Belle Stack 3    UnknownModule in Beamrichtung:
2-DSSD Origami  -z
2-DSSD Origami ce
  
  9   Sat Oct 13 19:04:02 2012 Manfred ValentanMicronOrigami_grossrun with Belle stack 3run00330k13.10.2012 19:02:31 Unknown Belle stack 3: 2DSSD-Origami, Wedge_New_1,
Wedge_old
HV = +- 50V
  
  13   Sun Oct 14 02:00:12 2012 Manfred ValentanMicronBabyConfiguration of intermediate stack    UnknownMicron baby stack with every other strip
connected to APV chips
n-side faces the beam, p-side not
  