Entry  Sun Oct 9 11:00:33 2011, Karl-Heinz Hoffmann, HPK, baby_add, run021, 150000, 09.10.2011 10:56:47, 09.10.2011 12:47:23, Good 
no cooling
beam on; xy table position x=330  y=74
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
Entry  Sun Oct 9 13:12:32 2011, Karl-Heinz Hoffmann, HPK, baby_add, run022, 670k, 09.10.2011 13:09:32, 10.10.2011 00:48:16, Good 
no cooling
beam on; xy table position x=330  y=64
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
Entry  Tue Oct 4 10:44:09 2011, Christian Irmler, Micron, Internal Calibration, cal002, 83800, 04.10.2011 10:04:49, 04.10.2011 10:19:41,  
micronbaby p-spray/irrad
HV = -100V
beam on,
Entry  Tue Oct 4 10:44:48 2011, Christian Irmler, Micron, Internal Calibration, cal003, 83800, 04.10.2011 10:33:50, 04.10.2011 10:48:51,  
micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced
Entry  Tue Oct 4 21:40:52 2011, Christian Irmler, BELLE, Origami stack, cal004, 83800, 04.10.2011 21:18:09, 04.10.2011 21:50:23, Good 
Origami6
HV=+-40V, no cooling
beam on
Entry  Tue Oct 4 22:11:12 2011, Christian Irmler, BELLE, Origami stack, run005, 330000, 04.10.2011 22:09:37, 05.10.2011 09:11:54, Crap 
Origami6
HV=+-40V, no cooling
beam on
Entry  Wed Oct 5 12:09:00 2011, Christian Irmler, BELLE, Origami stack cooled wrong I2C settings, cal005, 83800, 05.10.2011 12:04:50, 05.10.2011 12:37:11, Crap 
This calibration file can not be used, due to wrong I2C settings!
Origami6
HV=+-40V
Entry  Wed Oct 5 13:00:41 2011, Christian Irmler, BELLE, Origami stack cooled , run006, 24692, 05.10.2011 12:55:53, 05.10.2011 14:05:49, Crap 
Run stopped after 24692 events, because all n-side APV failed due to a shortcut of a capacitor (C223) on n-side rebo
Origami6
HV=+-40V
Entry  Wed Oct 5 16:43:00 2011, Christian Irmler, BELLE, Origami stack cooled, cal006, 83800, 05.10.2011 16:40:18, 05.10.2011 17:12:27, Good 
Origami6
HV=+-40V
beam on
Entry  Wed Oct 5 17:54:09 2011, Christian Irmler, BELLE, Origami stack cooled, cal007, 83800, 05.10.2011 17:51:57 , , Good 
I2C setting modified to improve the shape of the p-side signal --> shaping time reduced, pulse height still low
Origami6
HV=+-40V
Entry  Wed Oct 5 19:57:15 2011, Christian Irmler, BELLE, Origami stack cooled , run007, 17845, 05.10.2011 18:27:51, 05.10.2011 19:31:43, Crap 
Run stopped after 17845 events, because of bad trigger timing

Origami6
Entry  Thu Oct 6 09:22:34 2011, Christian Irmler, BELLE, Origami stack cooled, run010, 330k, 05.10.2011 20:46:30, 06.10.2011 09:12:24 , Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on; xy table position x=306 y=76.5
Entry  Thu Oct 6 15:57:51 2011, Christian Irmler, BELLE, Origami stack cooled, cal008, 83800, 06.10.2011 15:53:20, 06.10.2011 16:25:29 , Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=306 y=76.5
Entry  Thu Oct 6 17:36:47 2011, Christian Irmler, BELLE, Origami stack cooled, run011, 180000, 06.10.2011 17:06:38, 07.10.2011 00:04:06, Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=260.8 y=60.25
Entry  Fri Oct 7 00:20:15 2011, Christian Irmler, BELLE, Origami stack cooled, run012, 250k, 07.10.2011 00:15:54 , 07.10.2011 09:13:55, Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=352 y=89
Entry  Fri Oct 7 10:13:12 2011, Christian Irmler, BELLE, Origami stack cooled, run013, 185k, 07.10.2011 10:02:20, 07.10.2011 17:17:32, Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=321 y=99
Entry  Fri Oct 7 18:28:53 2011, Christian Irmler, common, run schedule, , , , , Unknown run_schedule.pdfrun_schedule.xlsx
 
Entry  Fri Oct 7 18:40:07 2011, Christian Irmler, BELLE, Origami stack cooled, cal009, 83800, 07.10.2011 18:35:04 , 07.10.2011 19:31:51, Good 
Origami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s
Entry  Fri Oct 7 19:35:14 2011, Christian Irmler, BELLE, Origami stack cooled, run014, 90k, 07.10.2011 19:49:26, 07.10.2011 23:26:52, Good 
Origami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s
Entry  Sat Oct 8 00:14:37 2011, Christian Irmler, BELLE, Origami stack, run015, 180111, 08.10.2011 00:06:41, 08.10.2011 08:24:38, Good 
Origami6
HV=+-40V, 
no cooling