  59   Sun Oct 9 11:31:43 2011 Manfred ValentanHPKHPK BADD stack configuration    Unknown

Module order:

BADD1-N
BADD2-N

BSTD1-N (for z information)

BADD1-P
BADD1-Y

BADD2-P
BADD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

Attachment 1: IMG_5097.JPG
IMG_5097.JPG
  64   Mon Oct 10 12:16:06 2011 Marko DragiceviccommonBeam Profile and Magnet BeamRef Settings     Unknown

Beam Profile from H6A, 10.10.2011 11:40

BeamRef settings for all magnets, File H6B.702

Attachment 1: BeamProfile.png
BeamProfile.png
Attachment 2: MagentBeamRefs.png
MagentBeamRefs.png
  65   Mon Oct 10 12:32:42 2011 Manfred ValentanCNMCNM stack configuration    Unknown

Module order:

CNM-V1 (draws a lot of current, gives only low signal)
BSTD1-N (for height information)
CNM-V2 (works fine)
 

Attatchment 1: Stack config, beam from right. In the box the stack is mounted with the labelled side of the BSTD1-N module on top (90deg rotated w.r.t. photo)

Attachment 2: the top edges of the sensors coincide -> when the beam hits the last strips of the BSTD, it also hits the pitch adapter region of the CNM sensors

Attachment 1: IMG_5102.JPG
IMG_5102.JPG
Attachment 2: IMG_5092.JPG
IMG_5092.JPG
  70   Thu Oct 13 13:08:38 2011 Thomas Bergauercommonend of success    Unknown
  71   Thu Oct 20 11:49:14 2011 Markus FriedlcommonScintillator dimensions    Good
Attachment 1: bhihagag.jpg
bhihagag.jpg
Attachment 2: bdgaegba.jpg
bdgaegba.jpg
  77   Wed Feb 22 13:37:11 2012 Christian IrmlerBELLEOrigami Module #4run103100k22.02.2012 13:35:0822.02.2012 13:54:08 Crap

Sr90, large scintillator,
HVret @ Origami closed
HVret @ SMU connected
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

Wires between HV connectors ground and HVret conntact at the mambo were open --> no HVret conntection between module and SMUs!
Moreover the SMU Inv. Nr. 545-078 has either an unstable output or problems with the current measurement.

  78   Wed Feb 22 16:21:23 2012 Christian IrmlerBELLEOrigami Module #4run104100k22.02.2012 16:22:3422.02.2012 16:41:26Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 1

J7... HV ret @ hybrid

APV 0 1 2 3 4 5 6 7
avg noise 2.564 2.124 2.094 2.200 1.696 1.666 1.870 1.888
CM noise 1.7 0.9 0.9 1.3 4.0 4.1 4.1 4.2

 

 

Attachment 1: run104.jpg
run104.jpg
Attachment 2: run104_current.xls
  81   Wed Feb 22 17:38:29 2012 Christian IrmlerBELLEOrigami Module #4run105100k22.02.2012 17:39:10 22.02.2012 17:58:01Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 0

J7... HV ret @ hybrid

Same as run104, but now J7 open

Again spikes in bias current!

 

Attachment 1: run105.jpg
run105.jpg
  84   Mon Mar 5 17:34:43 2012 Christian IrmlerBELLEOrigami Module #4run108100k 05.03.2012 16:24:12Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

  86   Mon Mar 5 17:36:46 2012 Christian IrmlerBELLEOrigami Module #4run109100k05.03.2012 17:36:19 05.03.2012 17:55:24 Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

  88   Mon Mar 5 18:41:23 2012 Christian IrmlerBELLEOrigami Module #4run110100k05.03.2012 18:45:2105.03.2012 19:04:30Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  91   Wed Mar 7 15:12:42 2012 Christian IrmlerBELLEOrigami Module #4run112100k07.03.2012 15:13:18 07.03.2012 14:31:07Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  93   Wed Mar 7 16:03:30 2012 Christian IrmlerBELLEOrigami Module #4run113100k07.03.2012 16:07:3407.03.2012 16:30:48 Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

same configuration as run112 but now the step motors of the xz table are powered.

Attachment 1: run112-113.jpg
run112-113.jpg
  94   Wed Mar 7 16:58:36 2012 Christian IrmlerBELLEOrigami Module #4cal113100k07.03.2012 16:40:04 07.03.2012 16:57:08Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

same configuration as run112 but now the step motors of the xz table are powered.

  38   Wed Oct 5 20:28:00 2011 Markus FriedlBELLEOrigami stack cooledrun0081058205.10.2011 20:25:1005.10.2011 20:45:10Good

HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on
I=20.5µA; new I2C settings; corrected trigger delay (htr)

New run with cold Origami and new I2C settings (shorter peaking time) and hopefully correct timing.

corresponding cal file: cal007

  63   Mon Oct 10 12:15:52 2011 Manfred ValentanCNMCNM stackrun02411000010.10.2011 12:03:5810.10.2011 14:05:56Good

no cooling
beam on; xy table position x=320.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Istart_CNM= 28 / 1 uA;  Istart_BSTD= 0.12 uA

  66   Mon Oct 10 14:11:53 2011 Christian IrmlerCNMCNM stackrun02511000010.10.2011 14:09:0010.10.2011 16:11:57Good

no cooling
beam on; xy table position x=335.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Istart_CNM= 31 / 1.4 uA;  Istart_BSTD= 0.2 uA

  52   Sat Oct 8 16:45:14 2011 Thomas BergauerHPKbaby_stdrun01815000008.10.2011 16:44:1308.10.2011 19:33:33Good

no cooling
beam on; xy table position x=322  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings, now with correct timing

  53   Sat Oct 8 20:33:58 2011 Karl-Heinz HoffmannHPKbaby_stdrun01915000008.10.2011 20:22:4508.10.2011 23:19:23Good

no cooling
beam on; xy table position x=333  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings

  57   Sun Oct 9 11:00:33 2011 Karl-Heinz HoffmannHPKbaby_addrun02115000009.10.2011 10:56:4709.10.2011 12:47:23Good

no cooling
beam on; xy table position x=330  y=74
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
std. I2C settings