Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 4 of 5  Not logged in ELOG logo
ID Date Author Project Subjectup Run Number Events StartTime EndTime Data Text Attachments
  38   Wed Oct 5 20:28:00 2011 Markus FriedlBELLEOrigami stack cooledrun0081058205.10.2011 20:25:1005.10.2011 20:45:10GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  39   Wed Oct 5 20:49:11 2011 Markus FriedlBELLEOrigami stack cooledrun009330k05.10.2011 20:46:3006.10.2011 09:12:24 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  40   Thu Oct 6 09:22:34 2011 Christian IrmlerBELLEOrigami stack cooledrun010330k05.10.2011 20:46:3006.10.2011 09:12:24 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  41   Thu Oct 6 15:57:51 2011 Christian IrmlerBELLEOrigami stack cooledcal0088380006.10.2011 15:53:2006.10.2011 16:25:29 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  42   Thu Oct 6 17:36:47 2011 Christian IrmlerBELLEOrigami stack cooledrun01118000006.10.2011 17:06:3807.10.2011 00:04:06GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  43   Fri Oct 7 00:20:15 2011 Christian IrmlerBELLEOrigami stack cooledrun012250k07.10.2011 00:15:54 07.10.2011 09:13:55GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  44   Fri Oct 7 10:13:12 2011 Christian IrmlerBELLEOrigami stack cooledrun013185k07.10.2011 10:02:2007.10.2011 17:17:32GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  46   Fri Oct 7 18:40:07 2011 Christian IrmlerBELLEOrigami stack cooledcal0098380007.10.2011 18:35:04 07.10.2011 19:31:51GoodOrigami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9
  
  47   Fri Oct 7 19:35:14 2011 Christian IrmlerBELLEOrigami stack cooledrun01490k07.10.2011 19:49:2607.10.2011 23:26:52GoodOrigami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9
  
  33   Wed Oct 5 13:00:41 2011 Christian IrmlerBELLEOrigami stack cooled run0062469205.10.2011 12:55:5305.10.2011 14:05:49CrapRun stopped after 24692 events,
because all n-side APV failed due to a shortcut
of a capacitor (C223) on n-side rebo
  
  37   Wed Oct 5 19:57:15 2011 Christian IrmlerBELLEOrigami stack cooled run0071784505.10.2011 18:27:5105.10.2011 19:31:43CrapRun stopped after 17845 events,
because of bad trigger timing
  
  32   Wed Oct 5 12:09:00 2011 Christian IrmlerBELLEOrigami stack cooled wrong I2C settingscal0058380005.10.2011 12:04:5005.10.2011 12:37:11CrapThis calibration file can not be
used, due to wrong I2C settings!
Origami6
  
  71   Thu Oct 20 11:49:14 2011 Markus FriedlcommonScintillator dimensions    Good   bhihagag.jpgbdgaegba.jpg 
  36   Wed Oct 5 19:33:40 2011 Markus FriedlcommonTrigger condition  4.10.2011 15:00  Changed trigger such that off-spill scintillator
triggers are vetoed.
Inserted Flip-Flop which is set by
 trigger_path_with_veto.png 
  21   Mon Oct 3 20:30:14 2011 Thomas BergauercommonXY Tisch     Grosser (DESY) Tisch:  x = -342.0   
y = 343.0  (Einheiten unbekannt, möglicherweise
mm)
 xy-tisch-control.JPGdesy_xy_table.jpg 
  56   Sun Oct 9 10:13:11 2011 Karl-Heinz HoffmannHPKbaby_addcal0118380009.10.2011 10:05:01 Goodno cooling
beam on; xy table position x= 
y=
  
  57   Sun Oct 9 11:00:33 2011 Karl-Heinz HoffmannHPKbaby_addrun02115000009.10.2011 10:56:4709.10.2011 12:47:23Goodno cooling
beam on; xy table position x=330 
y=74
  
  60   Sun Oct 9 13:12:32 2011 Karl-Heinz HoffmannHPKbaby_addrun022670k09.10.2011 13:09:3210.10.2011 00:48:16Goodno cooling
beam on; xy table position x=330 
y=64
  
  61   Mon Oct 10 00:50:23 2011 Christian IrmlerHPKbaby_addrun023680k10.10.2011 00:51:2610.10.2011 09:15:35Goodno cooling
beam on; xy table position x=330 
y=74
  
  50   Sat Oct 8 14:33:25 2011 Thomas BergauerHPKbaby_stdrun016250k08.10.2011 14:31:40 Crapfalsches config file (single statt
multi6)
 
  
ELOG V3.1.5-fc6679b