Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 6 of 8  Not logged in ELOG logo
ID Date Author Project Subject Run Number Eventsup StartTime EndTime
  54   Fri Oct 1 23:55:12 2010 Thomas BergauerCNMrunrun024320k01.10.2010 23:53:1202.10.2010 09:47:37

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

optimized alignment (XY-table to 133/76/187.5)

telescope run 20120

Attachment 1: cnm_2d_2.png
cnm_2d_2.png
Attachment 2: cnm_2d_1.png
cnm_2d_1.png
  46   Thu Sep 30 18:12:53 2010 Markus FriedlMicron Babyrunrun0173500030.09.2010 18:11:5330.09.2010 20:22:43

micron baby: 4 DUTs
HV=100V I=13.5uA, I_stop=17uA
Beam on
15° rotation

telescope run 20111

Attachment 1: number_of_clusters_telescope.png
number_of_clusters_telescope.png
  85   Tue Oct 5 10:20:30 2010 Manfred ValentanBELLErunrun4635000005.10.2010 01:00:0005.10.2010 10:16:07

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 15°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -7.5 (rotary table)

telescope run: 20152

  23   Tue Sep 28 15:09:16 2010 Markus FriedlBELLErunrun0054000028.09.2010 15:07:0828.09.2010 20:20:12

previous run stopped due to beam problem (shifted, broad, etc).

now recovered, restarting with same settings.

 

telescope run: 20080

  91   Wed Oct 6 11:51:25 2010 Thomas BergauerMicron Babyrunrun049448906.10.2010 11:38:2106.10.2010 11:49:23
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)

beam on 

not yet optimized XY-table positions (111/43.5/7.5)

  88   Tue Oct 5 18:13:05 2010 Christian IrmlerITErunrun04853312505.10.2010 18:14:5706.10.2010 09:27:44

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
telescope run: 20154-20155

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

Attachment 1: LongtermITERun2.png
LongtermITERun2.png
  58   Sat Oct 2 17:24:12 2010 Markus FriedlITErunrun026583402.10.2010 17:23:46 02.10.2010 17:31:51

2 x SILC + 2 x ITE
HV=100V

 

trying to find beam
 

telescope run 20124

  51   Fri Oct 1 10:06:59 2010 Manfred ValentanMicron Babyrunrun0217500001.10.2010 10:07:3701.10.2010 15:24:44

micron baby: 4 DUTs
HV=100V I=10.9uA (beginning)  13.6uA (end of run)
Beam on
60° rotation

 telescope run  20116

Attachment 1: run021_sensordisplay1.jpg
run021_sensordisplay1.jpg
Attachment 2: hit_map_und_cluster.png
hit_map_und_cluster.png
  63   Sun Oct 3 08:19:13 2010 Markus FriedlITErunrun0297500003.10.2010 08:33:2803.10.2010 10:50:27

same as previous run

telescope run 20127

Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample!

  52   Fri Oct 1 23:18:34 2010 Markus FriedlCNMrunrun022813901.10.2010 23:17:02 01.10.2010 23:45:51

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

not optimized alignment 

telescope run 20118

  17   Tue Sep 28 01:13:57 2010 Markus FriedlBELLEcalcal0018380028.09.2010 01:11:20 

first intcal with complete Belle stack: 2 x Origami, 2 x Micron

HV=100V  I=49uA

beam is on

chiller is set to 15°C (module temperature is ~17°C)

both Origamis and both Microns are serially cooled

  25   Tue Sep 28 22:07:16 2010 Markus FriedlBELLEcalcal002 DO NOT USE -> go to cal0038380028.09.2010 22:01:55 

Belle stack (Origami, Micron, Micron, Origami)

now cooling only for Origami, Micron are uncooled

chiller set point: -25°C, measured values on Origami: -10°C

HV=100V, Ibias=38µA, beam off

modified I2C settings for cold modules

temperature monitoring: Origami2 pipes in<->out swapped (to achieve shorter tubes)

 

PROBLEM: Origami n channels are swapped -> USE cal003 INSTEAD!!!

  30   Wed Sep 29 09:39:33 2010 Markus FriedlBELLEcalcal0038380029.09.2010 09:38:00 

same as cal002, but now with corrected readout order

  34   Wed Sep 29 14:03:55 2010 Markus FriedlBELLEcalcal0048380029.09.2010 14:02:2529.09.2010 14:45:05

Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=100µA, beam off
no cooling

Temp. at modules: 
Origami 1: 50°C
Micron 1: 46°C
Micron 2: 48°C
Origami 2: 48°C

standard I2C settings
centered

  37   Wed Sep 29 17:38:19 2010 Markus FriedlMicron Babycalcal0058380029.09.2010 17:36:38 

micron baby stack
HV=100V I=6.5uA
Beam off

  44   Thu Sep 30 15:06:28 2010 Markus FriedlMicron Babycalcal0068380030.09.2010 15:01:56 

micron baby: 4 DUTs - angle scan
HV=100V I=6.8uA
Beam off (turned on at ~8k events)
 

  59   Sat Oct 2 17:27:14 2010 Thomas BergauerITEcalcal0078380002.10.2010 17:11:18  

ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V

Beam on 

one short only per sensor

Attachment 1: intcal_ITE10PAD_W7.png
intcal_ITE10PAD_W7.png
Attachment 2: intcal_ITE10PAD_W9.png
intcal_ITE10PAD_W9.png
  62   Sun Oct 3 08:14:39 2010 Markus FriedlITEcalcal0088380003.10.2010 08:13:06 

6 x SILC + 2 x ITE
HV=100V
telescope position: 119

no beam (technical problem)

  64   Sun Oct 3 14:35:12 2010 Marko DragicevicCNMcalcal0098380003.10.2010 13:50:54 

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
DUT outside of beam

calibration started after 1 hour warmup

Attachment 1: cal009_cal_apv6.png
cal009_cal_apv6.png
Attachment 2: cal009_cal_apv7.png
cal009_cal_apv7.png
Attachment 3: slowcontrol_CNM_cal009.gif
slowcontrol_CNM_cal009.gif
  66   Sun Oct 3 18:23:27 2010 Christian IrmlerPtcalcal0108380003.10.2010 18:26:49  

pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
HV=200V
beam on

modules flushed with dry air

 

Attachment 1: slowcontrol_pt_cal010.gif
slowcontrol_pt_cal010.gif
ELOG V3.1.5-fc6679b