Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 1 of 8  Not logged in ELOG logo
ID Date Author Projectup Subject Run Number Events StartTime EndTime Text Attachments
  12   Fri Sep 24 12:09:32 2010 Manfred ValentanBELLEgds-file of Micron wafer       WaferMicron30.gdsDSSD_layerproperties.lyp 
  16   Mon Sep 27 18:54:47 2010 Thomas BergauerBELLEXY Position    center position: 55/40/277,5   
  17   Tue Sep 28 01:13:57 2010 Markus FriedlBELLEcalcal0018380028.09.2010 01:11:20 first intcal with complete Belle stack:
2 x Origami, 2 x Micron
HV=100V  I=49uA
  
  18   Tue Sep 28 03:06:31 2010 Markus FriedlBELLErunrun00111951628.09.2010 03:06:0428.09.2010 12:18:33first run with complete Belle stack: 2
x Origami, 2 x Micron
HV=100V  I=49uA
  
  19   Tue Sep 28 12:54:33 2010 Markus FriedlBELLErunrun002 28.09.2010 12:46:54 same as run001 after shifting x by 48mm
103 / 30 / 277.5 ? unsure after crash
of xy stage PC
  
  20   Tue Sep 28 13:04:02 2010 Markus FriedlBELLErunrun0032500028.09.2010 13:00:0528.09.2010 14:41:14now for real (previous run was at wrong
position)
all same as run001, except position
  
  21   Tue Sep 28 14:38:24 2010 Christian IrmlerBELLETemperature sensors Belle stack    PicoLogic TC-08 temperature sensor assignment
Belle stack:
Sensor type: K
  
  22   Tue Sep 28 14:48:00 2010 Markus FriedlBELLErunrun004175528.09.2010 14:48:2828.09.2010 15:06:31same as before, but now pos 1 is located
on the other edge (-48mm from center)
telescope 7 / 30 / 277.5
  
  23   Tue Sep 28 15:09:16 2010 Markus FriedlBELLErunrun0054000028.09.2010 15:07:0828.09.2010 20:20:12previous run stopped due to beam problem
(shifted, broad, etc).
now recovered, restarting with same
  
  25   Tue Sep 28 22:07:16 2010 Markus FriedlBELLEcalcal002 DO NOT USE -> go to cal0038380028.09.2010 22:01:55 Belle stack (Origami, Micron, Micron, Origami)
now cooling only for Origami, Micron
are uncooled
  
  26   Tue Sep 28 22:09:39 2010 Markus FriedlBELLETemperature sensors Belle stack    PicoLogic TC-08 temperature sensor assignment
Belle stack:
Sensor type: K
  
  27   Tue Sep 28 23:23:47 2010 Markus FriedlBELLErunrun006200328.09.2010 23:13:2228.09.2010 23:22:26channels swapped -> stopped   
  28   Tue Sep 28 23:24:35 2010 Markus FriedlBELLErunrun007146028.09.2010 23:23:2928.09.2010 23:27:54Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=38A, beam on
cooling: Origami only, chiller: -25C,
  
  29   Tue Sep 28 23:29:50 2010 Markus FriedlBELLErunrun00814000028.09.2010 23:29:0129.09.2010 09:36:58Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=38A, beam on
cooling: Origami only, chiller: -25C,
 run008_sensordisplay.jpgrun008_sensordisplay2.jpg 
  30   Wed Sep 29 09:39:33 2010 Markus FriedlBELLEcalcal0038380029.09.2010 09:38:00 same as cal002, but now with corrected
readout order
  
  31   Wed Sep 29 10:30:59 2010 Markus FriedlBELLErunrun0093000029.09.2010 10:27:2729.09.2010 11:06:35zero suppressed (HIT4) @ FADC
Belle stack: Origami-Micron-Micron-Origami
- HIT4
  
  32   Wed Sep 29 11:09:10 2010 Markus FriedlBELLErunrun0103000029.09.2010 11:08:0329.09.2010 11:50:07zero suppressed (HIT5) @ FADC
Belle stack: Origami-Micron-Micron-Origami
- HIT5
  
  33   Wed Sep 29 11:53:16 2010 Erik HuemerBELLErunrun0111900329.09.2010 12:19:5729.09.2010 14:00:57Belle stack: Origami-Micron-Micron-Origami

HV=100V, Ibias=83.22µA, beam
  
  34   Wed Sep 29 14:03:55 2010 Markus FriedlBELLEcalcal0048380029.09.2010 14:02:2529.09.2010 14:45:05Belle stack: Origami-Micron-Micron-Origami

HV=100V, Ibias=100µA, beam off
  
  81   Mon Oct 4 20:16:19 2010 Christian IrmlerBELLEcalcal0118380004.10.2010 20:15:00 angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
ELOG V3.1.5-fc6679b