Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 1 of 8  Not logged in ELOG logo
ID Date Authorup Project Subject Run Number Events StartTime EndTime
  21   Tue Sep 28 14:38:24 2010 Christian IrmlerBELLETemperature sensors Belle stack    

PicoLogic TC-08 temperature sensor assignment Belle stack:

Sensor type: K

channel 1:  Origami_mod1_in
channel 2:  Origami_mod1_out
channel 3:  Origami_mod2_in
channel 4:  Origami_mod2_out
channel 5:  Micron_wedge_mod1_p
channel 6:  Micron_wedge_mod1_n
channel 7:  Micron_wedge_mod2_p
channel 8:  Micron_wedge_mod2_n
 

The cooling pipes of the two Origami modules and that of the Micron modules are connected in series, respectively.

  42   Thu Sep 30 10:56:34 2010 Christian IrmlercommonRoom numbers    

Room and telefone numbers.

 

Name Building Room Tel.
Bergi 38 418 70 418 or 162471 (mobile)
Markus 41 021 60 021
Manfred 38 404 70 404
Erik 38 463 70 463
Immanuel 38 313 70 313
Chrisu 39 324

79 324

Marko 39 007 79 007
Paqui 38 107 70 107

 

  66   Sun Oct 3 18:23:27 2010 Christian IrmlerPtcalcal0108380003.10.2010 18:26:49  

pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
HV=200V
beam on

modules flushed with dry air

 

Attachment 1: slowcontrol_pt_cal010.gif
slowcontrol_pt_cal010.gif
  67   Sun Oct 3 18:52:56 2010 Christian IrmlerPtrunrun0302560003.10.2010 19:16:29 

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
HV=200V beam on
angle: 27

telescope run 20134

  74   Mon Oct 4 11:43:05 2010 Christian IrmlerPtrunrun0372560004.10.2010 11:40:1504.10.2010 12:15:03

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
HV=200V beam on
angle: 41 deg

telescope run 20143

  78   Mon Oct 4 15:39:34 2010 Christian IrmlerPtrunrun0412560004.10.2010 15:46:22 

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg
position axis = 232.5

repetition of run039

telescope run20147

  79   Mon Oct 4 16:15:48 2010 Christian IrmlerPtrunrun0422560004.10.2010 16:12:5204.10.2010 16:35:18

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
HV=200V beam on
angle: 47 deg

repetition of run040, but now biased :-)

telescope run 20148

  80   Mon Oct 4 16:29:36 2010 Christian Irmlercommonbeam settings    

beam settings optimized by beamline operator

wire champer display fixed

Attachment 1: beamprofile_run042.gif
beamprofile_run042.gif
Attachment 2: beamsettings_run042.jpg
beamsettings_run042.jpg
  81   Mon Oct 4 20:16:19 2010 Christian IrmlerBELLEcalcal0118380004.10.2010 20:15:00 

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

HV connection of Origami 1 repaired

  82   Mon Oct 4 21:01:25 2010 Christian IrmlerBELLErunrun433000004.10.2010 20:59:4804.10.2010 23:04:24

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 60°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -52.5 (rotary table)

telescope run: 20149

  87   Tue Oct 5 17:50:23 2010 Christian IrmlerITEcalcal0128380005.10.2010 17:50:2605.10.2010 18:09:48

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

  88   Tue Oct 5 18:13:05 2010 Christian IrmlerITErunrun04853312505.10.2010 18:14:5706.10.2010 09:27:44

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
telescope run: 20154-20155

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

Attachment 1: LongtermITERun2.png
LongtermITERun2.png
  98   Fri Oct 8 18:12:15 2010 Christian IrmlerBELLErunrun0539800008.10.2010 00:33:1408.10.2010 13:36:57

Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
NIM trigger

temperature of chiller set to 15°C

Analog signal of APVs #22 and #23 has been bound to ground after 1200 events.

  102   Fri Oct 8 23:43:07 2010 Christian IrmlerBELLErunrun0551231608.10.2010 23:42:5109.10.2010 00:14:56

Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip

same position as in previous run

telescope run 20197  - wrong config file @ telescope -> new run with correct settings

  104   Sat Oct 9 12:00:55 2010 Christian IrmlerBELLEcalcal0178380009.10.2010 11:59:37 

Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73°
HV=100V / 40 µA
cooling: chiller set to 15°C

Origami p-side does not receive triggers -> disabled

origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...

  110   Mon Oct 11 11:18:17 2010 Christian Irmlercommonend of success  09.10.2010 19:44:23NaN

der Beiweis  :-)

Attachment 1: IMG_9033.JPG
IMG_9033.JPG
  33   Wed Sep 29 11:53:16 2010 Erik HuemerBELLErunrun0111900329.09.2010 12:19:5729.09.2010 14:00:57

Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=83.22µA, beam on
no cooling

Temp. at modules: 
Origami 1: 50°C
Micron 1: 46°C
Micron 2: 48°C
Origami 2: 48°C

standard I2C settings
centered

telescope run 20085 (continued)

  50   Fri Oct 1 09:42:02 2010 Erik HuemerMicron Babyrunrun020184301.10.2010 09:59:09 01.10.2010 10.05

micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
60° rotation

Teleskop nicht neu gestartet, machma nochamal

  56   Sat Oct 2 15:24:00 2010 Erik HuemerITEXY Position and Slow Control    

center position: 119/48/187,5

 

Attachment 1: ITE128_SlowControl_FirstRun.png
ITE128_SlowControl_FirstRun.png
  65   Sun Oct 3 16:23:20 2010 Erik HuemerPtXY/R Position    

centerposition: 119/43/187,5

27 grad: 214,5

ELOG V3.1.5-fc6679b