Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 1 of 8  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Number Eventsdown StartTime EndTime Text Attachments
  98   Fri Oct 8 18:12:15 2010 Christian IrmlerBELLErunrun0539800008.10.2010 00:33:1408.10.2010 13:36:57Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
  
  92   Wed Oct 6 11:59:29 2010 Markus FriedlMicron Babyrunrun0509000006.10.2010 11:57:5506.10.2010 15:30:378 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
  
  93   Wed Oct 6 16:33:55 2010 Markus FriedlMicron Babyrunrun0519000006.10.2010 16:32:0306.10.2010 20:59:588 x Micron Baby (3 irradiated), no cooling
HV=100V I=209uA (start of run, still
rising); 203uA (end of run)
  
  99   Fri Oct 8 18:12:43 2010 Markus FriedlBELLErunrun0549000008.10.2010 18:08:4808.10.2010 21:49:36 Belle stack w/o Origami2 after irradiation
HV=80V I=224uA (beginning of run)
2 suspicious APVs on Micron n side
  
  40   Wed Sep 29 19:08:56 2010 Markus FriedlMicron Babyrunrun0138985329.09.2010 19:09:5730.09.2010 00:52:39micron baby stack
HV=100V I=11.0uA
Beam on
 run013_hit.png 
  17   Tue Sep 28 01:13:57 2010 Markus FriedlBELLEcalcal0018380028.09.2010 01:11:20 first intcal with complete Belle stack:
2 x Origami, 2 x Micron
HV=100V  I=49uA
  
  25   Tue Sep 28 22:07:16 2010 Markus FriedlBELLEcalcal002 DO NOT USE -> go to cal0038380028.09.2010 22:01:55 Belle stack (Origami, Micron, Micron, Origami)
now cooling only for Origami, Micron
are uncooled
  
  30   Wed Sep 29 09:39:33 2010 Markus FriedlBELLEcalcal0038380029.09.2010 09:38:00 same as cal002, but now with corrected
readout order
  
  34   Wed Sep 29 14:03:55 2010 Markus FriedlBELLEcalcal0048380029.09.2010 14:02:2529.09.2010 14:45:05Belle stack: Origami-Micron-Micron-Origami

HV=100V, Ibias=100µA, beam off
  
  37   Wed Sep 29 17:38:19 2010 Markus FriedlMicron Babycalcal0058380029.09.2010 17:36:38 micron baby stack
HV=100V I=6.5uA
Beam off
  
  44   Thu Sep 30 15:06:28 2010 Markus FriedlMicron Babycalcal0068380030.09.2010 15:01:56 micron baby: 4 DUTs - angle scan
HV=100V I=6.8uA
Beam off (turned on at ~8k events)
  
  59   Sat Oct 2 17:27:14 2010 Thomas BergauerITEcalcal0078380002.10.2010 17:11:18  ITE: 2 DUTs
2 x SILC + 2 x ITE
 intcal_ITE10PAD_W7.pngintcal_ITE10PAD_W9.png 
  62   Sun Oct 3 08:14:39 2010 Markus FriedlITEcalcal0088380003.10.2010 08:13:06 6 x SILC + 2 x ITE
HV=100V
telescope position: 119
  
  64   Sun Oct 3 14:35:12 2010 Marko DragicevicCNMcalcal0098380003.10.2010 13:50:54 CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA,
 cal009_cal_apv6.pngcal009_cal_apv7.pngslowcontrol_CNM_cal009.gif 
  66   Sun Oct 3 18:23:27 2010 Christian IrmlerPtcalcal0108380003.10.2010 18:26:49  pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
 slowcontrol_pt_cal010.gif 
  81   Mon Oct 4 20:16:19 2010 Christian IrmlerBELLEcalcal0118380004.10.2010 20:15:00 angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  87   Tue Oct 5 17:50:23 2010 Christian IrmlerITEcalcal0128380005.10.2010 17:50:2605.10.2010 18:09:48 6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
  
  90   Wed Oct 6 11:03:59 2010 Marko DragicevicMicron Babycalcal0138380006.10.2010 11:03:12 8 x Micron Baby (3 irradiated), no cooling
HV=100V I=115uA (start of run)
beam off
  
  95   Wed Oct 6 23:03:15 2010 Marko DragicevicBELLEcalcal0148380006.10.2010 23:01:5606.10.2010 23:34:07Belle stack without Origami2
HV=80V I=227uA
beam on
  
  97   Fri Oct 8 17:26:36 2010 Markus FriedlBELLEcalcal0158380008.10.2010 17:22:44 Belle stack without Origami2
HV=11V I=32uA
beam on
  
ELOG V3.1.5-fc6679b