  HEPHY logbook for testbeam at SPS September/October 2010, Page 1 of 8  Not logged in ELOG logo
ID Date Authorup Project Subject Run Number Events StartTime EndTime Text Attachments
  21   Tue Sep 28 14:38:24 2010 Christian IrmlerBELLETemperature sensors Belle stack    PicoLogic TC-08 temperature sensor assignment
Belle stack:
Sensor type: K
  
  42   Thu Sep 30 10:56:34 2010 Christian IrmlercommonRoom numbers    Room and telefone numbers.
 
  
  66   Sun Oct 3 18:23:27 2010 Christian IrmlerPtcalcal0108380003.10.2010 18:26:49  pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
 slowcontrol_pt_cal010.gif 
  67   Sun Oct 3 18:52:56 2010 Christian IrmlerPtrunrun0302560003.10.2010 19:16:29 Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
  
  74   Mon Oct 4 11:43:05 2010 Christian IrmlerPtrunrun0372560004.10.2010 11:40:1504.10.2010 12:15:03Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
  
  78   Mon Oct 4 15:39:34 2010 Christian IrmlerPtrunrun0412560004.10.2010 15:46:22 Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
  
  79   Mon Oct 4 16:15:48 2010 Christian IrmlerPtrunrun0422560004.10.2010 16:12:5204.10.2010 16:35:18Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
  
  80   Mon Oct 4 16:29:36 2010 Christian Irmlercommonbeam settings    beam settings optimized by beamline operator
wire champer display fixed
 beamprofile_run042.gifbeamsettings_run042.jpg 
  81   Mon Oct 4 20:16:19 2010 Christian IrmlerBELLEcalcal0118380004.10.2010 20:15:00 angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  82   Mon Oct 4 21:01:25 2010 Christian IrmlerBELLErunrun433000004.10.2010 20:59:4804.10.2010 23:04:24angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  87   Tue Oct 5 17:50:23 2010 Christian IrmlerITEcalcal0128380005.10.2010 17:50:2605.10.2010 18:09:48 6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
  
  88   Tue Oct 5 18:13:05 2010 Christian IrmlerITErunrun04853312505.10.2010 18:14:5706.10.2010 09:27:446 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
 LongtermITERun2.png 
  98   Fri Oct 8 18:12:15 2010 Christian IrmlerBELLErunrun0539800008.10.2010 00:33:1408.10.2010 13:36:57Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
  
  102   Fri Oct 8 23:43:07 2010 Christian IrmlerBELLErunrun0551231608.10.2010 23:42:5109.10.2010 00:14:56 Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA 
cooling: Origami only, chiller set
  
  104   Sat Oct 9 12:00:55 2010 Christian IrmlerBELLEcalcal0178380009.10.2010 11:59:37 Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73°
HV=100V / 40 µA 
  
  110   Mon Oct 11 11:18:17 2010 Christian Irmlercommonend of success  09.10.2010 19:44:23NaNder Beiweis  :-)  IMG_9033.JPG 
  33   Wed Sep 29 11:53:16 2010 Erik HuemerBELLErunrun0111900329.09.2010 12:19:5729.09.2010 14:00:57Belle stack: Origami-Micron-Micron-Origami

HV=100V, Ibias=83.22µA, beam
  
  50   Fri Oct 1 09:42:02 2010 Erik HuemerMicron Babyrunrun020184301.10.2010 09:59:09 01.10.2010 10.05micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
  
  56   Sat Oct 2 15:24:00 2010 Erik HuemerITEXY Position and Slow Control    center position: 119/48/187,5
 
 ITE128_SlowControl_FirstRun.png 
  65   Sun Oct 3 16:23:20 2010 Erik HuemerPtXY/R Position    centerposition: 119/43/187,5
27 grad: 214,5
  