Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 2 of 8  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTime EndTimeup Text Attachments
  26   Tue Sep 28 22:09:39 2010 Markus FriedlBELLETemperature sensors Belle stack    PicoLogic TC-08 temperature sensor assignment
Belle stack:
Sensor type: K
  
  30   Wed Sep 29 09:39:33 2010 Markus FriedlBELLEcalcal0038380029.09.2010 09:38:00 same as cal002, but now with corrected
readout order
  
  37   Wed Sep 29 17:38:19 2010 Markus FriedlMicron Babycalcal0058380029.09.2010 17:36:38 micron baby stack
HV=100V I=6.5uA
Beam off
  
  38   Wed Sep 29 18:53:05 2010 Thomas BergauerMicron BabyXY Positions    center position: 113/47/7.5
top left (direction jura): 121/53.5/7.5
bottom right (direction saleve):
  
  42   Thu Sep 30 10:56:34 2010 Christian IrmlercommonRoom numbers    Room and telefone numbers.
 
  
  44   Thu Sep 30 15:06:28 2010 Markus FriedlMicron Babycalcal0068380030.09.2010 15:01:56 micron baby: 4 DUTs - angle scan
HV=100V I=6.8uA
Beam off (turned on at ~8k events)
  
  56   Sat Oct 2 15:24:00 2010 Erik HuemerITEXY Position and Slow Control    center position: 119/48/187,5
 
 ITE128_SlowControl_FirstRun.png 
  59   Sat Oct 2 17:27:14 2010 Thomas BergauerITEcalcal0078380002.10.2010 17:11:18  ITE: 2 DUTs
2 x SILC + 2 x ITE
 intcal_ITE10PAD_W7.pngintcal_ITE10PAD_W9.png 
  62   Sun Oct 3 08:14:39 2010 Markus FriedlITEcalcal0088380003.10.2010 08:13:06 6 x SILC + 2 x ITE
HV=100V
telescope position: 119
  
  64   Sun Oct 3 14:35:12 2010 Marko DragicevicCNMcalcal0098380003.10.2010 13:50:54 CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA,
 cal009_cal_apv6.pngcal009_cal_apv7.pngslowcontrol_CNM_cal009.gif 
  65   Sun Oct 3 16:23:20 2010 Erik HuemerPtXY/R Position    centerposition: 119/43/187,5
27 grad: 214,5
  
  66   Sun Oct 3 18:23:27 2010 Christian IrmlerPtcalcal0108380003.10.2010 18:26:49  pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
 slowcontrol_pt_cal010.gif 
  67   Sun Oct 3 18:52:56 2010 Christian IrmlerPtrunrun0302560003.10.2010 19:16:29 Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
  
  68   Sun Oct 3 20:44:40 2010 Erik HuemerPtrunrun0312560003.10.2010 19:42:34 Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=20.5A h02=6.5A
  
  72   Mon Oct 4 09:31:25 2010 Manfred ValentanPtrunrun0352560004.10.2010 09:28:40 Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.7A h02=11.8A
  
  78   Mon Oct 4 15:39:34 2010 Christian IrmlerPtrunrun0412560004.10.2010 15:46:22 Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
  
  80   Mon Oct 4 16:29:36 2010 Christian Irmlercommonbeam settings    beam settings optimized by beamline operator
wire champer display fixed
 beamprofile_run042.gifbeamsettings_run042.jpg 
  81   Mon Oct 4 20:16:19 2010 Christian IrmlerBELLEcalcal0118380004.10.2010 20:15:00 angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  89   Wed Oct 6 10:15:26 2010 Marko DragicevicMicron BabyXY Positions After Irradiation    center position: 119/50/(7.5)
top left (direction jura, bottom
right on sensor): 127/56.5/7.5
  
  90   Wed Oct 6 11:03:59 2010 Marko DragicevicMicron Babycalcal0138380006.10.2010 11:03:12 8 x Micron Baby (3 irradiated), no cooling
HV=100V I=115uA (start of run)
beam off
  
ELOG V3.1.5-fc6679b