Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 8 of 8  Not logged in ELOG logo
ID Date Author Project Subjectup Run Number Events StartTime EndTime Text Attachments
  102   Fri Oct 8 23:43:07 2010 Christian IrmlerBELLErunrun0551231608.10.2010 23:42:5109.10.2010 00:14:56 Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA 
cooling: Origami only, chiller set
  
  103   Sat Oct 9 00:17:02 2010 Markus FriedlBELLErunrun056225k09.10.2010 00:15:5309.10.2010 09:54:28Belle stack w/o Origami2 after irradiation
HV=80V / I_start=255 µA, I_stop=243
µA  
  
  105   Sat Oct 9 12:25:36 2010 Thomas BergauerBELLErunrun05727647509.10.2010 12:22:2109.10.2010 15:08:46 
Origami1 (n-side only) + Micron1
(non-irrad)
  
  106   Sat Oct 9 15:29:09 2010 Markus FriedlBELLErunrun0583000009.10.2010 15:26:5009.10.2010 16:21:37Origami1
(n-side only) + Micron1 (non-irrad)
angle scan: 73 - now with multi6 (previous
  
  116   Fri Apr 8 13:25:58 2011 Manfred ValentanMicron Babysensors and modules    TRK1: B2Micron_2826_1_baby2
TRK2: B2Micron_2826_1_baby3
DUT3: B2Micron_2826_7_baby2 (common
  
  135   Tue May 17 19:08:29 2011 Manfred ValentanMicron Babysensors for source test with intermediate strips    Every second bond of these sensors will
be removed to mimic the effect of an intermediate
strip. For comparison, this is done both
  
  24   Tue Sep 28 16:50:31 2010 Thomas Bergauercommonserial connection chiller     Der chiller braucht ein gekreuztes
serielles Kabel!!
  
ELOG V3.1.5-fc6679b