Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 2 of 8  Not logged in ELOG logo
ID Date Author Project Subject Run Number Eventsup StartTime EndTime Text Attachments
  42   Thu Sep 30 10:56:34 2010 Christian IrmlercommonRoom numbers    Room and telefone numbers.
 
  
  56   Sat Oct 2 15:24:00 2010 Erik HuemerITEXY Position and Slow Control    center position: 119/48/187,5
 
 ITE128_SlowControl_FirstRun.png 
  65   Sun Oct 3 16:23:20 2010 Erik HuemerPtXY/R Position    centerposition: 119/43/187,5
27 grad: 214,5
  
  80   Mon Oct 4 16:29:36 2010 Christian Irmlercommonbeam settings    beam settings optimized by beamline operator
wire champer display fixed
 beamprofile_run042.gifbeamsettings_run042.jpg 
  84   Mon Oct 4 23:59:05 2010 Manfred ValentanBELLErunrun45 04.10.2010 ??:??:??05.10.2010 00:56:48angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  89   Wed Oct 6 10:15:26 2010 Marko DragicevicMicron BabyXY Positions After Irradiation    center position: 119/50/(7.5)
top left (direction jura, bottom
right on sensor): 127/56.5/7.5
  
  94   Wed Oct 6 23:02:09 2010 Marko DragiceviccommonBeam Configuration    Beam Settings and Profile on 5.10.2010
- 17:00h
Saved as: H6B.801
 BeamProfile.gifBeamMagnets.gifBeamColli.gif 
  101   Fri Oct 8 23:22:32 2010 Manfred ValentanBELLESchnittwinkel barrel vs. slanted    17deg acceptance => Schnittwinkel barrel
option = 90-17 = 73deg     
----->  rotary table 80.5
  
  107   Sat Oct 9 18:56:35 2010 Thomas Bergauercommonpath to telescope data    eudetmac001.cern.ch
path is /Volumes/Data/eudet/Data/cern_2010_sept_silc_apvdaq
(Vienna system)
  
  108   Sat Oct 9 19:44:36 2010 Markus Friedlcommonend of success  09.10.2010 19:44:23NaN    
  109   Sun Oct 10 15:45:04 2010 Thomas Bergauercommonend of success  09.10.2010 19:44:23NaN ;-) 
genau das gleiche wollte ich auch
gerade schreiben!
  
  110   Mon Oct 11 11:18:17 2010 Christian Irmlercommonend of success  09.10.2010 19:44:23NaNder Beiweis  :-)  IMG_9033.JPG 
  111   Tue Oct 19 14:58:56 2010 Manfred ValentanMicron Babygeometry       IMG_8888.JPGmicron_baby_stack_telescope_geometry.JPGmicron_baby_stack_telectope_geometry.dwg 
  112   Thu Mar 31 10:28:19 2011 Manfred ValentanMicron BabyDUT5, source run, post irrad, pre zupfcal100 31.03.2011 10:24:5931.03.2011 10:33:15DUT5
cal-file: micronbaby_single_irrad_cal100.cfg
  
  114   Thu Mar 31 12:11:04 2011 Manfred ValentanMicron BabyDUT4, source run, post irrad, pre zupfcal101 31.03.2011 12:09:3631.03.2011 12:17:52DUT4
config file: micronbaby_single_irrrad_cal101.cfg
  
  116   Fri Apr 8 13:25:58 2011 Manfred ValentanMicron Babysensors and modules    TRK1: B2Micron_2826_1_baby2
TRK2: B2Micron_2826_1_baby3
DUT3: B2Micron_2826_7_baby2 (common
  
  120   Wed May 4 15:14:31 2011 Thomas BergauerPtinfo about module    pt-Modul hat jeweils zwei OB1 Sensoren
von STM (mit 122um Pitch)
im Abstand von 2mm uebereinander
  
  135   Tue May 17 19:08:29 2011 Manfred ValentanMicron Babysensors for source test with intermediate strips    Every second bond of these sensors will
be removed to mimic the effect of an intermediate
strip. For comparison, this is done both
  
  41   Thu Sep 30 00:56:32 2010 Markus FriedlMicron Babyrunrun014100k30.09.2010 00:55:3030.09.2010 11:20:02micron baby stack
 
HV=100V I=11.0uA
  
  113   Thu Mar 31 11:05:39 2011 Manfred ValentanMicron BabyDUT5, source run, post irrad, pre zupfrun100100k31.03.2011 11:02:1731.03.2011 11:15:41DUT5
cal-file: micronbaby_multi6_irrad_run100.cfg
  
ELOG V3.1.5-fc6679b