Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010  Not logged in ELOG logo
Message ID: 55     Entry time: Sat Oct 2 09:57:20 2010
Author: Thomas Bergauer 
Project: CNM 
Subject: run 
Run Number: run025 
Events: 150k 
StartTime: 02.10.2010 09:54:28 
EndTime: 02.10.2010 14:21:20 

 CMN-SILC stack

HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

new position along the CNM strips (XY-table to 143/76/187.5)

telescope run 20122

 

Attachment 1: run20122.png  80 kB  Uploaded Sat Oct 2 15:27:56 2010  | Hide | Hide all | Show all
run20122.png
Attachment 2: slowcontrol_cnm.png  36 kB  Uploaded Sat Oct 2 15:29:58 2010  | Show | Hide all | Show all
Attachment 3: cnm_2d_1.png  19 kB  Uploaded Sat Oct 2 15:30:30 2010  | Hide | Hide all | Show all
cnm_2d_1.png
Attachment 4: cnm_2d_2.png  19 kB  Uploaded Sat Oct 2 15:30:38 2010  | Hide | Hide all | Show all
cnm_2d_2.png
ELOG V3.1.5-fc6679b