Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 6 of 6  Not logged in ELOG logo
Entry  Tue Aug 25 20:21:31 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode, run042, 85189, 25.08.2009 20:18:18, 26.08.2009 01:27:12 
Entry  Tue Aug 25 11:26:23 2009, Thomas Bergauer, Pt_ITE512, Pt_ITE512 6deg NO air!, run036, 20k, 25.08.2009 11:25, 25.08.2009 12:19:55 
Entry  Tue Aug 25 15:33:07 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 12deg NO air! , run039, 20k, 25.08.2009 15:35, 25.08.2009 17:10 
Entry  Tue Aug 25 18:22:25 2009, Manfred Valentan, Pt_ITE512, Pt_ITE512 40deg NO air! (for calibration), run041, 10k, 25.08.2009 18:20:30, 25.08.2009 
Entry  Wed Aug 26 01:32:25 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode + cooling, run043, 100600, 26.08.2009 01:46:38 , 26.08.2009 07:10:14 
Entry  Wed Aug 26 07:19:42 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode + cooling, run044, 13504, 26.08.2009 07:18:19, 26.08.2009 08:46:11 (beam shut down @ 8:00) 
ELOG V3.1.5-fc6679b