Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 6 of 6  Not logged in ELOG logo
Entry  Thu Aug 20 12:35:13 2009, Christian Irmler, alignment_beam, top right on sensor, point 3, run6865, 10600, 20.08.2009 12:31:35, 20.08.2009 12:48:04 
Entry  Thu Aug 20 12:50:59 2009, Christian Irmler, alignment_beam, bottom right on sensor, point 4, run6866, 8467, 20.08.2009 12:51:04, 20.08.2009 13:05:01 
Entry  Thu Aug 20 14:31:29 2009, Christian Irmler, alignment_beam, bottom left on sensor, point 5, run6868, 10600, 20.08.2009 14:36:00, 20.08.2009 14:51:57 
Entry  Thu Aug 20 15:15:33 2009, Christian Irmler, alignment_beam, bottom center on sensor, point 6, run6869, 615 (beam manipulation by students), 20.08.2009 14:56:16 , 20.08.2009 15:14:11 
Entry  Fri Aug 21 06:24:10 2009, Christian Irmler, BELLE, APVDAQ + telescope (beam alignement), run6872, 5785, 21.08.2009 00:12:26, 21.08.2009 00:27:11 
Entry  Fri Aug 21 06:31:29 2009, Christian Irmler, BELLE, APVDAQ + telescope, run6873, 80173, 21.08.2009 00:47:38, 21.08.2009 06:07:02 
ELOG V3.1.5-fc6679b