Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 6 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Projectdown Subject Run Number Events StartTime EndTime Text Attachments
  15   Fri Aug 14 21:36:17 2009 Markus Friedl Config files    Status of config files as of Friday 14
August 2009 late evening
  
  20   Wed Aug 19 22:57:13 2009 Marko Dragicevic How-To    TLU (run from DAQPCHEPHY):
ssh
eudet@eudetmac001.cern.ch
ssh tlupc
  
  55   Fri Aug 21 17:14:58 2009 Wolfgang Kiesenhofer S/N Histograms Raw (no data selection)run001 (strips), run002 (pitch adapter), run003 (upper edge)      sn_langaufit_raw_strips.pdfsn_langaufit_raw_pa.pdfsn_langaufit_raw_edgerun.pdf 
  84   Sun Aug 23 23:38:27 2009 Georg Auzinger Phone numbers     Georg #70
Wolfgang - Building: 41, Room: 204,
Tel: ?
  
  94   Tue Aug 25 09:00:51 2009 Thomas Bergauer beam conditions    manually changed TRIM3, TRIM4 and TRIM6  magnet_settings_withH6B.802.jpg20090825_0859_beam_conditions.jpg 
  114   Fri Dec 4 12:21:56 2009 Wolfgang Kiesenhofer ITE128 strip correlation kendall tau (preliminary result)    Kendall tau (rank correlation) for module
1 (single layer 1 / h13), module 2 (single
layer 2 / h14),  module 6 (standard
 stripcorr_mod1_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod2_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod6_thrs5_ktau_ev100000_run002_strip.pdf 
ELOG V3.1.5-fc6679b