ID Date Author Project Subject Run Number Eventsdown StartTime EndTime
  83   Sun Aug 23 17:19:50 2009 Christian IrmlerPt_ITE512internal calibrationcal011 23.08.2009 16:30:4323.08.2009 17:02:14

Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

  84   Sun Aug 23 23:38:27 2009 Georg Auzinger Phone numbers    

 Georg #70

Wolfgang - Building: 41, Room: 204, Tel: ?

Manfred: Building 38, Room 522, Tel: 70522

Chrisu: B39, room 309, Tel: 79309

Bergi: Tel Zimmer: 79112, Handy: 16-2471

Maks: Tel Zimmer: 79117

  94   Tue Aug 25 09:00:51 2009 Thomas Bergauer beam conditions    

manually changed TRIM3, TRIM4 and TRIM6

  106   Wed Aug 26 14:26:13 2009 Wolfgang KiesenhoferITE128S/N final Single-Metalrun001 & run002   

Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices.

  107   Wed Sep 2 14:15:17 2009 Wolfgang KiesenhoferITE128ITE 128 Cross-Talkrun002   

Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise.

  114   Fri Dec 4 12:21:56 2009 Wolfgang Kiesenhofer ITE128 strip correlation kendall tau (preliminary result)    

Kendall tau (rank correlation) for module 1 (single layer 1 / h13), module 2 (single layer 2 / h14),  module 6 (standard sensor 2 / h12)

 

 