Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 6 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Projectup Subject Run Number Events StartTime EndTime Text Attachments
  38   Thu Aug 20 19:46:02 2009 Manfred Valentanalignment_laserlaser at high intensity, far sensor in 2nd positionlaser0055000020.08.2009 19:45:1620.08.2009 19:53:01far sensor in 2nd position; laser at high
intensity (saturation on near sensor, good
signal on far sensor)
  
  39   Thu Aug 20 19:56:21 2009 Manfred Valentanalignment_laserbackground mesurement with laser OFFlaser00610k20.08.2009 19:54:0420.08.2009 19:55:38    
  40   Thu Aug 20 20:06:06 2009 Manfred Valentanalignment_laserlow intensity (like laser001), but far sensor in 2nd positionlaser00750k20.08.2009 19:57:5220.08.2009 20:05:34HV=70V, 40MHz, 6 samples, beam off, far
sensor in 2nd position
5ns trigger pulse width, 1 kHz trigger,
  
  58   Fri Aug 21 22:42:32 2009 Thomas BergauercommonEUDAQ config file used when running with telescope    
 testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf 
  65   Sat Aug 22 11:54:49 2009 Thomas Bergauercommonbeam profile    beam shifted a bit in vertical direction
downwards since 21. August 09 evening
 20090822_1150_beam_conditions.jpg 
  71   Sat Aug 22 15:12:44 2009 Thomas Bergauercommonbeam profile    playing with TRIM4 in vertical
plane (setting to 20A current) shifted beamspot
back to center position
 20090822_1511_beam_conditions.jpg 
ELOG V3.1.5-fc6679b