Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 6 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Eventsup StartTime EndTime Text Attachments
  74   Sat Aug 22 19:19:20 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode + coolingrun02075k22.08.2009 19:17:2922.08.2009 22:09:53Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900
  
  43   Fri Aug 21 06:31:29 2009 Christian IrmlerBELLEAPVDAQ + telescoperun68738017321.08.2009 00:47:3821.08.2009 06:07:024 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
  29   Thu Aug 20 12:50:59 2009 Christian Irmleralignment_beambottom right on sensor, point 4run6866846720.08.2009 12:51:0420.08.2009 13:05:012 alignement modules
location in beam direction: h04-h03
beam in center of sensor
  
  103   Tue Aug 25 20:21:31 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent moderun0428518925.08.2009 20:18:1826.08.2009 01:27:12Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
no cooling
  
  45   Fri Aug 21 12:05:31 2009 Christian IrmlerBELLEAPVDAQ standalone 40 MHz hit moderun006interrupted21.08.2009 10:41:5121.08.2009 10:54:374 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
  46   Fri Aug 21 12:06:06 2009 Christian IrmlerBELLEAPVDAQ standalone 40 MHzrun007interrupted21.08.2009 11:06:4521.08.2009 11:10:404 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
ELOG V3.1.5-fc6679b