Entry  Sat Aug 22 23:06:22 2009, Christian Irmler, BELLE, pedestal correction 40 MHz transparent mode + cooling, pedcorr007, , 22.08.2009 23:04:29, 22.08.2009 23:13:51 

Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction

chiller set to 13 deg, 2900 rpm

Entry  Sun Aug 23 01:46:03 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: central position, run021, 100k, 23.08.09 00:10 (ca.), 23.08.2009 02:15:10 Picture_1.png

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=115.31

new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture

Entry  Sun Aug 23 02:18:20 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (3mm below center); during night, run022, 407895, 23.08.2009 02:16:21, 23.08.2009 08:04:09 Picture_1.png

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=112.31

Entry  Sun Aug 23 08:13:31 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (4mm below center), run023, 100k, 23.08.2009 08:06:58, 23.08.2009 09:30:53 

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=111.31

Entry  Sun Aug 23 17:19:50 2009, Christian Irmler, Pt_ITE512, internal calibration, cal011, , 23.08.2009 16:30:43, 23.08.2009 17:02:14 

Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

Entry  Mon Aug 24 18:30:07 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 11deg air, run030, 20k, 24.08.09 18:45:09, 24.08.09 20:37:04 

Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 11:58:23 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 1deg air, run025, 20k, 24.08.09 11:24:33, 24.08.09 12:40:25 

Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 15:28:49 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 7deg air, run028, 20k, 24.08.09 15:39:50, 24.08.09 16:40:54 

Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 16:44:36 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 9deg air, run029, 20k, 24.08.09 17:03:21, 24.08.09 18:20:55 

Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 22:04:56 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 13deg air, run031, 20k, 24.08.09 20:53:50, 24.08.09 22:00:49 

Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 22:12:22 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 15deg air, run032, 19456, 24.08.09 22:18:08, 24.08.09 23:25:52 

Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
 
no beam
--> run stopped after 19456 events
Entry  Mon Aug 24 13:01:14 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 3deg air, run026, 20k, 24.08.09 11:24:33, 24.08.2009 14:11:45 

Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 14:23:01 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 5deg air, run027, 20k, 24.08.2009 14:27:07, 24.08.2009 15:26:20 

Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Tue Aug 25 09:01:12 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 2deg air , run034, 20k, 25.08.09 08:56:18 , 25.08.09 09:45:  

Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Tue Aug 25 18:22:25 2009, Manfred Valentan, Pt_ITE512, Pt_ITE512 40deg NO air! (for calibration), run041, 10k, 25.08.2009 18:20:30, 25.08.2009 

Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36
Entry  Tue Aug 25 01:33:18 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 0deg air, run033, 151724, 25.08.09 01:35:18, 25.08.2009 08:44:27 

Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Tue Aug 25 09:53:16 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 4deg NO air!, run035, 20k, 25.08.2009 09:50, 25.08.2009 11:00 

Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Tue Aug 25 11:26:23 2009, Thomas Bergauer, Pt_ITE512, Pt_ITE512 6deg NO air!, run036, 20k, 25.08.2009 11:25, 25.08.2009 12:19:55 

Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD

Entry  Tue Aug 25 12:30:04 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 8deg NO air!, run037, 20k, 25.08.2009 12:45, 25.08.2009 13:40:13 

Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=49.1muA
X-Y-Table: x=99.6, y=36
Entry  Tue Aug 25 13:48:30 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 10deg NO air!, run038, 20k, 25.08.2009 13:54:54, 25.08.2009 15:22:38 

Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36