Entry  Mon Jul 6 16:22:36 2009, Stephan Hänsel, SiLC, Measurements - Sensors, , , ,  
 Pt Modules: 
OB1-Sensors:
     30210331516116 
     30210331415917 

    30210314845402 
     30210332911309 

 
Entry  Mon Jul 6 16:23:51 2009, Stephan Hänsel, SiLC, Module Components, , , ,  
 Pt Modules: 

Pt-1:
Entry  Thu Jul 9 10:29:58 2009, Stephan Hänsel, SiLC, Measurements - Modules, , , ,  
 Pt Modules: 
- Sensoren sind Luftfeuhtigkeitsempfindlich
- die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren 
Entry  Fri Jul 17 14:03:21 2009, Stephan Hänsel, , What to measure, , , ,  
 Origami
 
Testbeam08 Module
Entry  Fri Aug 14 16:45:25 2009, Stephan Hänsel, , Module - Setups, , , ,  
 

    5mm Inbus-Schlüssel
    3mm Inbus Schlüssel
    6- 2(1) x 30 Pt-Pins
    beim 5mm-Sockel müssen
die 2 Löcher über die das optische Modul h03 verschraubt wird noch ausgeweitet werden (Thomas)
    bei Pt-Deckel oben einzeichnen welche
Entry  Fri Jul 31 19:23:26 2009, Thomas Bergauer, , Laser Spot size, , , ,  laser_spot_overview.jpglaser_spot_10cm.jpglaser_spot_20cm.jpglaser_spot_30cm.jpg
10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
20cm nach Kollimator: Durchmesser 1,54mm (FWHM)
Entry  Fri Aug 14 19:35:43 2009, Thomas Bergauer, Pt_ITE512, intcal, , , ,  
HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)
h01-Pt: 10uA
h02-Pt: 1.6uA
Entry  Fri Aug 21 22:42:32 2009, Thomas Bergauer, common, EUDAQ config file used when running with telescope, , , ,  testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf


 
Used until Friday, 21.08.09:
Entry  Sat Aug 22 03:27:13 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz transparent mode (cooling?), run014, 75k, 22.08.2009 03:25:23, 22.08.2009 07:08:09 
 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.
 

f=31.8 MHz
Entry  Sat Aug 22 08:32:02 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz hit mode (cooling?), run015, 75k, 22.08.2009 08:15:05, 22.08.2009 09:25:21 
 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller set to 13 deg.
 

f=31.8
Entry  Sat Aug 22 09:44:50 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz hit mode (cooling?), run016, 75k, 22.08.2009 09:42:38, 22.08.2009 10:24:05 
 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller set to 13 deg.
 

f=31.8
Entry  Sat Aug 22 10:28:50 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 40 MHz hit mode (cooling?), run017, 75k, 22.08.2009 10:26:28, 22.08.2009 11:16:12 
 HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller set to 13 deg.
 

f=40
Entry  Sat Aug 22 11:26:00 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 40 MHz hit mode (cooling?), run018, 75k, 22.08.2009 11:16:57, 22.08.2009 11:58:56 
 HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller set to 13 deg.
 

f=40
Entry  Sat Aug 22 11:54:49 2009, Thomas Bergauer, common, beam profile, , , ,  20090822_1150_beam_conditions.jpg
beam shifted a bit in vertical direction downwards since 21. August 09 evening
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
Entry  Sat Aug 22 15:12:44 2009, Thomas Bergauer, common, beam profile, , , ,  20090822_1511_beam_conditions.jpg
playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
Entry  Sun Aug 23 01:46:03 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: central position, run021, 100k, 23.08.09 00:10 (ca.), 23.08.2009 02:15:10 Picture_1.png
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
Entry  Sun Aug 23 02:18:20 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (3mm below center); during night, run022, 407895, 23.08.2009 02:16:21, 23.08.2009 08:04:09 Picture_1.png
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
Entry  Sun Aug 23 08:13:31 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (4mm below center), run023, 100k, 23.08.2009 08:06:58, 23.08.2009 09:30:53 
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
Entry  Tue Aug 25 09:00:51 2009, Thomas Bergauer, , beam conditions, , , ,  magnet_settings_withH6B.802.jpg20090825_0859_beam_conditions.jpg
manually changed TRIM3, TRIM4 and TRIM6
Entry  Tue Aug 25 11:26:23 2009, Thomas Bergauer, Pt_ITE512, Pt_ITE512 6deg NO air!, run036, 20k, 25.08.2009 11:25, 25.08.2009 12:19:55 
Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD
ELOG V3.1.5-fc6679b