Entry  Tue Aug 11 14:03:57 2009, Marko Dragicevic, , Sensor Designs, , , ,  6x
Screenshots
HEPHY Gallery
GDS File Viewer
 KLayout Website
 Layer Properties File Warsaw.lyp in den Attachments.
Entry  Fri Aug 14 16:45:25 2009, Stephan Hänsel, , Module - Setups, , , ,  
 

    5mm Inbus-Schlüssel
    3mm Inbus Schlüssel
    6- 2(1) x 30 Pt-Pins
    beim 5mm-Sockel müssen
die 2 Löcher über die das optische Modul h03 verschraubt wird noch ausgeweitet werden (Thomas)
    bei Pt-Deckel oben einzeichnen welche
Entry  Fri Aug 14 19:35:43 2009, Thomas Bergauer, Pt_ITE512, intcal, , , ,  
HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)
h01-Pt: 10uA
h02-Pt: 1.6uA
Entry  Fri Aug 14 21:36:17 2009, Markus Friedl, , Config files, , , ,  
Status of config files as of Friday 14 August 2009 late evening

    
        
            Config
file name
            Timing adjusted
            Sensor definition
            Tested
Entry  Wed Aug 19 15:37:37 2009, Christian Irmler, ITE128, internal calibration, cal001, , 15:31:29,  
8 modules, HV=70V, 40MHz, 1 sample
no beam 
APV 4,5: inverter off, higher baseline = PAD modules
Entry  Wed Aug 19 15:41:17 2009, Wolfgang Kiesenhofer, SiLC, angle scan templates, , , ,  13x
Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen
auf die Beam Richtung).
Entry  Wed Aug 19 22:57:13 2009, Marko Dragicevic, , How-To, , , ,  
TLU (run from DAQPCHEPHY):
ssh eudet@eudetmac001.cern.ch
ssh tlupc
~\eudaq\bin\TLUControl.exe -d1 -a12
Entry  Thu Aug 20 00:31:45 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run003, 100600, 20.08.2009 00:27:36,  
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
Entry  Thu Aug 20 15:54:45 2009, Manfred Valentan, BELLE, temp/humidty logger data, , , ,  easylog_under_telescope.gif
position: underneath telescope. dewpoint ~ 15 degree
test with chiller: running 4 hours at 15 degress: NO condensation on alu pipe
Entry  Thu Aug 20 18:56:25 2009, Christian Irmler, alignment_laser, laser, laser001, 100000, 20.08.2009 18:48:53,  
2 alignment modules
location in beam direction: h04-h03
laser is shooting on h03 (opposite to the beam)
Entry  Fri Aug 21 13:38:20 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz hit mode, run011, 75000, 21.08.2009 13:35:25 ,  
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
Entry  Fri Aug 21 16:37:22 2009, Christian Irmler, BELLE, internal calibration 40 MHz hit mode, cal006, , 21.08.2009 16:30:33,  
Belle DUT, intcal
HV=80V, 40 MHz, no beam
hit mode
Entry  Fri Aug 21 17:14:58 2009, Wolfgang Kiesenhofer, , S/N Histograms Raw (no data selection), run001 (strips), run002 (pitch adapter), run003 (upper edge), , ,  sn_langaufit_raw_strips.pdfsn_langaufit_raw_pa.pdfsn_langaufit_raw_edgerun.pdf
 
Entry  Fri Aug 21 22:42:32 2009, Thomas Bergauer, common, EUDAQ config file used when running with telescope, , , ,  testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf


 
Used until Friday, 21.08.09:
Entry  Sat Aug 22 11:54:49 2009, Thomas Bergauer, common, beam profile, , , ,  20090822_1150_beam_conditions.jpg
beam shifted a bit in vertical direction downwards since 21. August 09 evening
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
Entry  Sat Aug 22 13:28:53 2009, Wolfgang Kiesenhofer, Pt_ITE512, runlist for pt-module angle-scan, , , ,  
Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6

    
        
            run
            angle[deg]
            
Entry  Sat Aug 22 15:12:44 2009, Thomas Bergauer, common, beam profile, , , ,  20090822_1511_beam_conditions.jpg
playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
Entry  Sat Aug 22 22:14:50 2009, Christian Irmler, BELLE, internal calibration 40 MHz transparent mode + cooling, cal010, , 22.08.2009 22:24:22,  
Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
Entry  Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , ,  IandRH_first_Pt_run.pngPicture_1.png
Current of Pt modules during first run
Data of the run was dicarded.
Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.
Timescales for RH and I graph are different!!!
Entry  Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06,  
Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36