Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 4 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
IDup Date Author Project Subject Run Number Events StartTime EndTime Text Attachments
  63   Sat Aug 22 10:28:50 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01775k22.08.2009 10:26:2822.08.2009 11:16:12 HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller
set to 13 deg.
 

  
  64   Sat Aug 22 11:26:00 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01875k22.08.2009 11:16:5722.08.2009 11:58:56 HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller
set to 13 deg.
 

  
  65   Sat Aug 22 11:54:49 2009 Thomas Bergauercommonbeam profile    beam shifted a bit in vertical direction
downwards since 21. August 09 evening
 20090822_1150_beam_conditions.jpg 
  66   Sat Aug 22 12:12:34 2009 Christian IrmlerBELLEinternal calibration 40 MHz transparent mode (cooling?)cal007 22.08.2009 12:10:32 22.08.2009 12:49:09Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
  
  67   Sat Aug 22 13:28:53 2009 Wolfgang KiesenhoferPt_ITE512runlist for pt-module angle-scan    Preliminary run
list for pt-modules + ite512 + silc1, silc2,
silc5, silc6
  
  68   Sat Aug 22 13:30:28 2009 Christian IrmlerBELLEinternal calibration 31.8 MHz transparent mode (cooling?)cal008 22.08.2009 12:50:4822.08.2009 13:29:25Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
  
  69   Sat Aug 22 13:34:14 2009 Christian IrmlerBELLEpedestal correction 31.8 MHz transparent mode (cooling?)pedcorr005 22.08.2009 13:31:2722.08.2009 13:41:42Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
  
  70   Sat Aug 22 14:46:12 2009 Christian IrmlerBELLEinternal calibration 31.8 MHz transparent mode + coolingcal009 22.08.2009 14:43:5522.08.2009 15:22:37Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
  
  71   Sat Aug 22 15:12:44 2009 Thomas Bergauercommonbeam profile    playing with TRIM4 in vertical
plane (setting to 20A current) shifted beamspot
back to center position
 20090822_1511_beam_conditions.jpg 
  72   Sat Aug 22 15:28:00 2009 Christian IrmlerBELLEpedestal correction 31.8 MHz transparent mode + coolingpedcorr006 22.08.2009 15:25:3522.08.2009 15:36:00Belle DUT, HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
pedestal correction
  
  73   Sat Aug 22 15:52:33 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent mode + coolingrun01975k22.08.2009 15:50:4022.08.2009 19:14:21Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900
  
  74   Sat Aug 22 19:19:20 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode + coolingrun02075k22.08.2009 19:17:2922.08.2009 22:09:53Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900
  
  75   Sat Aug 22 22:14:50 2009 Christian IrmlerBELLEinternal calibration 40 MHz transparent mode + coolingcal010 22.08.2009 22:24:22 Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
  
  76   Sat Aug 22 23:06:22 2009 Christian IrmlerBELLEpedestal correction 40 MHz transparent mode + coolingpedcorr007 22.08.2009 23:04:2922.08.2009 23:13:51Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction
  
  77   Sun Aug 23 01:46:03 2009 Thomas BergauerITE1282nd run with ITE128: central positionrun021100k23.08.09 00:10 (ca.)23.08.2009 02:15:10ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
 Picture_1.png 
  78   Sun Aug 23 02:18:20 2009 Thomas BergauerITE1282nd run with ITE128: top position (3mm below center); during nightrun02240789523.08.2009 02:16:2123.08.2009 08:04:09ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
 Picture_1.png 
  79   Sun Aug 23 08:13:31 2009 Thomas BergauerITE1282nd run with ITE128: top position (4mm below center)run023100k23.08.2009 08:06:5823.08.2009 09:30:53ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
  
  80   Sun Aug 23 13:15:42 2009 Marko DragicevicPt_ITE512Current and Humindity during first Run    Current of Pt modules during first run
Data
of the run was dicarded.
Compressed air flow was at ~2 bars
 IandRH_first_Pt_run.pngPicture_1.png 
  81   Sun Aug 23 14:03:14 2009 Manfred ValentanPt_ITE512Pt & ITE512 center position, 1 degrun0242000023.08.2009 13:59:06 Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
  
  82   Sun Aug 23 17:18:25 2009 Christian IrmlerPt_ITE512pedestal correctionpedcorr008 23.08.2009 17:17:36  Pt: 1 Grad, HV=200V, 0% RH, intcal, beam
off
ITE512: HV=70V,
  
ELOG V3.1.5-fc6679b