Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 4 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTime EndTimedown Text Attachments
  29   Thu Aug 20 12:50:59 2009 Christian Irmleralignment_beambottom right on sensor, point 4run6866846720.08.2009 12:51:0420.08.2009 13:05:012 alignement modules
location in beam direction: h04-h03
beam in center of sensor
  
  28   Thu Aug 20 12:35:13 2009 Christian Irmleralignment_beamtop right on sensor, point 3run68651060020.08.2009 12:31:3520.08.2009 12:48:042 alignement modules
location in beam direction: h04-h03
beam in center of sensor
  
  27   Thu Aug 20 12:18:40 2009 Christian Irmleralignment_beamtop left on sensor, point 2run6863 (telescope 6864)1060020.08.2009 12:07:2820.08.2009 12:25:572 alignement modules
location in beam direction: h04-h03
beam in center of sensor
  
  26   Thu Aug 20 11:38:11 2009 Christian Irmleralignment_beamtop center, point 7run6861 (+6862)1060020.08.2009 11:36:3520.08.2009 11:53:512 alignement modules
location in beam direction: h04-h03
beam in center of sensor
  
  25   Thu Aug 20 11:23:04 2009 Christian Irmleralignment_beambeam in center of sensor w telescoperun004 (6860 telescope)1060020.08.2009 11:09:50 20.08.2009 11:25:162 alignement modules
location in beam direction: h04-h03
beam in center of sensor
  
  24   Thu Aug 20 11:05:26 2009 Christian Irmleralignment_beampedeatal correctionpedcorr002 20.08.2009 11:05:4120.08.2009 11:09:352 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample
  
  23   Thu Aug 20 10:48:39 2009 Christian Irmleralignment_beaminternal calibrationcal002 20.08.2009 10:49:0720.08.2009 10:59:432 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample
  
  21   Thu Aug 20 00:16:45 2009 Christian IrmlerITE128pedestal correctionpedcorr001 20.08.2009 00:14:2120.08.2009 00:24:28DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz
pedestal correction
  
  19   Wed Aug 19 22:56:07 2009 Christian IrmlerITE128ITE128 shooting into strips w pitch adapter, upper positionrun00210060019.08.2009 22:54:2320.08.2009 00:11:31DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
  
  18   Wed Aug 19 20:43:14 2009 Christian IrmlerITE128ITE128 shooting into strips w/o pitch adapter, low positionrun00110060019.08.2009 20:42:0819.08.2009 22:54:21DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
  
  50   Fri Aug 21 12:22:43 2009 Christian IrmlerBELLEAPVDAQ standalone 31.8 MHz hit moderun0107500021.08.2009 12:53:02 21.08.2009 13:35:014 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source
  
  1   Mon Jul 6 12:22:47 2009 Stephan HänselSiLCMeasurements - hybrids with APV    Pt Modules: 
Hybrids with 4 APVs:
  
 
  
  2   Mon Jul 6 12:24:53 2009 Stephan HänselSiLCModule Drawings     Pt Modules: 

    
3D-View 
    technical drawings:
  
  5   Mon Jul 6 12:29:20 2009 Stephan HänselSiLCSensors - layout     Pt Modules: 
CMS OB1 Sensors:

    
 Wafer-Screenshot.png 
  6   Mon Jul 6 14:30:45 2009 Marko Dragicevic Equipment List    [B]Slow Control:[/B]
Source Measurement Unit Keithley K2410, Inv.Nr.:
540-702, 2000EUR
 carnet_aug09.xls 
  7   Mon Jul 6 16:22:36 2009 Stephan HänselSiLCMeasurements - Sensors     Pt Modules: 
OB1-Sensors:
     30210331516116
  
  8   Mon Jul 6 16:23:51 2009 Stephan HänselSiLCModule Components     Pt Modules: 

Pt-1:
  
  9   Thu Jul 9 10:29:58 2009 Stephan HänselSiLCMeasurements - Modules     Pt Modules:

- Sensoren sind Luftfeuhtigkeitsempfindlich
  
  10   Fri Jul 17 14:03:21 2009 Stephan Hänsel What to measure     Origami
 
Testbeam08 Module
  
  11   Fri Jul 31 19:23:26 2009 Thomas Bergauer Laser Spot size    10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
20cm
nach Kollimator: Durchmesser 1,54mm (FWHM)
 laser_spot_overview.jpglaser_spot_10cm.jpglaser_spot_20cm.jpglaser_spot_30cm.jpg 
ELOG V3.1.5-fc6679b