  HEPHY logbook for testbeam at SPS June 2009, Page 4 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Eventsup StartTime EndTime
  28   Thu Aug 20 12:35:13 2009 Christian Irmleralignment_beamtop right on sensor, point 3run68651060020.08.2009 12:31:3520.08.2009 12:48:04

2 alignement modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:43 y:121.3 (top right on sensor in beam direction)

  30   Thu Aug 20 14:31:29 2009 Christian Irmleralignment_beambottom left on sensor, point 5run68681060020.08.2009 14:36:0020.08.2009 14:51:57

2 alignment modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:57 y:155 (bottom left on sensor in beam direction)

  39   Thu Aug 20 19:56:21 2009 Manfred Valentanalignment_laserbackground mesurement with laser OFFlaser00610k20.08.2009 19:54:0420.08.2009 19:55:38
  102   Tue Aug 25 18:22:25 2009 Manfred ValentanPt_ITE512Pt_ITE512 40deg NO air! (for calibration)run04110k25.08.2009 18:20:3025.08.2009

Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36
  105   Wed Aug 26 07:19:42 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent mode + coolingrun0441350426.08.2009 07:18:1926.08.2009 08:46:11 (beam shut down @ 8:00)

Belle DUT, HV=80V,  31.8 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

  93   Tue Aug 25 01:33:18 2009 Georg AuzingerPt_ITE512Pt_ITE512 0deg airrun03315172425.08.09 01:35:1825.08.2009 08:44:27

Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  92   Mon Aug 24 22:12:22 2009 Georg AuzingerPt_ITE512Pt_ITE512 15deg airrun0321945624.08.09 22:18:0824.08.09 23:25:52

Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
 
no beam
--> run stopped after 19456 events
  81   Sun Aug 23 14:03:14 2009 Manfred ValentanPt_ITE512Pt & ITE512 center position, 1 degrun0242000023.08.2009 13:59:06 

Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
Telescope: run7316

  85   Mon Aug 24 11:58:23 2009 Georg AuzingerPt_ITE512Pt_ITE512 1deg airrun02520k24.08.09 11:24:3324.08.09 12:40:25

Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  86   Mon Aug 24 13:01:14 2009 Georg AuzingerPt_ITE512Pt_ITE512 3deg airrun02620k24.08.09 11:24:3324.08.2009 14:11:45

Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  87   Mon Aug 24 14:23:01 2009 Georg AuzingerPt_ITE512Pt_ITE512 5deg airrun02720k24.08.2009 14:27:0724.08.2009 15:26:20

Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  88   Mon Aug 24 15:28:49 2009 Georg AuzingerPt_ITE512Pt_ITE512 7deg airrun02820k24.08.09 15:39:5024.08.09 16:40:54

Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  89   Mon Aug 24 16:44:36 2009 Georg AuzingerPt_ITE512Pt_ITE512 9deg airrun02920k24.08.09 17:03:2124.08.09 18:20:55

Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  90   Mon Aug 24 18:30:07 2009 Georg AuzingerPt_ITE512Pt_ITE512 11deg airrun03020k24.08.09 18:45:0924.08.09 20:37:04

Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  91   Mon Aug 24 22:04:56 2009 Georg AuzingerPt_ITE512Pt_ITE512 13deg airrun03120k24.08.09 20:53:5024.08.09 22:00:49

Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  95   Tue Aug 25 09:01:12 2009 Marko DragicevicPt_ITE512Pt_ITE512 2deg air run03420k25.08.09 08:56:18 25.08.09 09:45:

Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  96   Tue Aug 25 09:53:16 2009 Marko DragicevicPt_ITE512Pt_ITE512 4deg NO air!run03520k25.08.2009 09:5025.08.2009 11:00

Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  97   Tue Aug 25 11:26:23 2009 Thomas BergauerPt_ITE512Pt_ITE512 6deg NO air!run03620k25.08.2009 11:2525.08.2009 12:19:55

Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD

  98   Tue Aug 25 12:30:04 2009 Marko DragicevicPt_ITE512Pt_ITE512 8deg NO air!run03720k25.08.2009 12:4525.08.2009 13:40:13

Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=49.1muA
X-Y-Table: x=99.6, y=36
  99   Tue Aug 25 13:48:30 2009 Marko DragicevicPt_ITE512Pt_ITE512 10deg NO air!run03820k25.08.2009 13:54:5425.08.2009 15:22:38

Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36