Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 4 of 6  Not logged in ELOG logo
ID Date Author Project Subjectup Run Number Events StartTime EndTime
  98   Tue Aug 25 12:30:04 2009 Marko DragicevicPt_ITE512Pt_ITE512 8deg NO air!run03720k25.08.2009 12:4525.08.2009 13:40:13

Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=49.1muA
X-Y-Table: x=99.6, y=36
  89   Mon Aug 24 16:44:36 2009 Georg AuzingerPt_ITE512Pt_ITE512 9deg airrun02920k24.08.09 17:03:2124.08.09 18:20:55

Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  55   Fri Aug 21 17:14:58 2009 Wolfgang Kiesenhofer S/N Histograms Raw (no data selection)run001 (strips), run002 (pitch adapter), run003 (upper edge)   
  106   Wed Aug 26 14:26:13 2009 Wolfgang KiesenhoferITE128S/N final Single-Metalrun001 & run002   

Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices.

  12   Tue Aug 11 14:03:57 2009 Marko Dragicevic Sensor Designs    

Screenshots

HEPHY Gallery

GDS File Viewer

 KLayout Website

 Layer Properties File Warsaw.lyp in den Attachments.

  5   Mon Jul 6 12:29:20 2009 Stephan HänselSiLCSensors - layout    

Pt Modules:

CMS OB1 Sensors:

 

Optical Modules:

Sensors:

 

ITE Modules:

  10   Fri Jul 17 14:03:21 2009 Stephan Hänsel What to measure    

Origami

 

Testbeam08 Module

- Anglescan

 

Pt Modules (2Stück - je 2 Sensoren):

Anglescan

- einzelne module (auch als "stub" (fixer Abstand zwischen ihnen) ?)

wichtig: brauchen wir 2 Testbeam08 module um 90° verdreht für höheninformation??? (sensoren in den Pt-modulen sind nicht 100%ig parallel - MESSEN!)

 

Optical Modules:(DAUER ca 18 Stunden)

- tests in box mit laserbeam (laser auf anderer Höhe al beam?!? - sonst geht der beam durch den Laser)

 

ITE Modules:

- 8 ter stack: (2 Testbeam08 module quer + 2 x 1stmetal128 + 2 x 2nd metal 128 + 2 x normal128)

- 2ndmetal512 module 3 stück bauen und im beam versetzt einbauen parasitär bei den spanier-modulen)

 

zusätliche ideen:

- CMS-Tracker slice (2Pt + 2 optische + 3 2ndmetal512 hintereinander in unterschiedlichen winkeln um einen tracker-slice zu simulieren - CMS-layout !?!)

 

 

  17   Wed Aug 19 15:41:17 2009 Wolfgang KiesenhoferSiLCangle scan templates    

Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen auf die Beam Richtung).

  35   Thu Aug 20 19:12:23 2009 Manfred Valentanalignment_laserbackground mesurement with laser OFFlaser0021000020.08.2009 19:10:0920.08.2009 19:11:57
  39   Thu Aug 20 19:56:21 2009 Manfred Valentanalignment_laserbackground mesurement with laser OFFlaser00610k20.08.2009 19:54:0420.08.2009 19:55:38
  94   Tue Aug 25 09:00:51 2009 Thomas Bergauer beam conditions    

manually changed TRIM3, TRIM4 and TRIM6

  25   Thu Aug 20 11:23:04 2009 Christian Irmleralignment_beambeam in center of sensor w telescoperun004 (6860 telescope)1060020.08.2009 11:09:50 20.08.2009 11:25:16

2 alignement modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:50 y:141.3 (center- center, point 1)

  65   Sat Aug 22 11:54:49 2009 Thomas Bergauercommonbeam profile    

beam shifted a bit in vertical direction downwards since 21. August 09 evening

Beam configuration:

Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008

  71   Sat Aug 22 15:12:44 2009 Thomas Bergauercommonbeam profile    

playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position

Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008

Rate: 3.35E5 particles/spill (measured with SCINT8 in beamline)

Particle Production Applet
Calculator applet

For +120 Gev/c beam:

Pi+ 55.67 %
p 38.95 %
K+ 5.38 %

  31   Thu Aug 20 15:15:33 2009 Christian Irmleralignment_beambottom center on sensor, point 6run6869615 (beam manipulation by students)20.08.2009 14:56:16 20.08.2009 15:14:11

2 alignment modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:50 y:155 (bottom center on sensor in beam direction)

  30   Thu Aug 20 14:31:29 2009 Christian Irmleralignment_beambottom left on sensor, point 5run68681060020.08.2009 14:36:0020.08.2009 14:51:57

2 alignment modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:57 y:155 (bottom left on sensor in beam direction)

  29   Thu Aug 20 12:50:59 2009 Christian Irmleralignment_beambottom right on sensor, point 4run6866846720.08.2009 12:51:0420.08.2009 13:05:01

2 alignement modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:43 y:155 (bottom right on sensor in beam direction)

  14   Fri Aug 14 19:35:43 2009 Thomas BergauerPt_ITE512intcal    

HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)

h01-Pt: 10uA

h02-Pt: 1.6uA

3 SiLC DUTs mit je ca. 38nA

h07-ITE-512: 3.77uA

h05-ITE-512: breakthrough

h06-ITE-512: breakthrough

  16   Wed Aug 19 15:37:37 2009 Christian IrmlerITE128internal calibrationcal001 15:31:29 

8 modules, HV=70V, 40MHz, 1 sample
no beam

APV 4,5: inverter off, higher baseline = PAD modules

  23   Thu Aug 20 10:48:39 2009 Christian Irmleralignment_beaminternal calibrationcal002 20.08.2009 10:49:0720.08.2009 10:59:43

2 alignement modules

location in beam direction: h04-h03

HV=70V, 40MHz, 1 sample
no beam

module 1 (h03) is used w inverter off and higher base line

ELOG V3.1.5-fc6679b