Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 4 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authorup Project Subject Run Number Events StartTime EndTime Text Attachments
  37   Thu Aug 20 19:35:06 2009 Manfred Valentanalignment_laserlaser at high intensity (saturation on near sensor, good signal on far sensor)laser00410000020.08.2009 19:18:4720.08.2009 19:35:05HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
 laser_interference.png 
  38   Thu Aug 20 19:46:02 2009 Manfred Valentanalignment_laserlaser at high intensity, far sensor in 2nd positionlaser0055000020.08.2009 19:45:1620.08.2009 19:53:01far sensor in 2nd position; laser at high
intensity (saturation on near sensor, good
signal on far sensor)
  
  39   Thu Aug 20 19:56:21 2009 Manfred Valentanalignment_laserbackground mesurement with laser OFFlaser00610k20.08.2009 19:54:0420.08.2009 19:55:38    
  40   Thu Aug 20 20:06:06 2009 Manfred Valentanalignment_laserlow intensity (like laser001), but far sensor in 2nd positionlaser00750k20.08.2009 19:57:5220.08.2009 20:05:34HV=70V, 40MHz, 6 samples, beam off, far
sensor in 2nd position
5ns trigger pulse width, 1 kHz trigger,
  
  81   Sun Aug 23 14:03:14 2009 Manfred ValentanPt_ITE512Pt & ITE512 center position, 1 degrun0242000023.08.2009 13:59:06 Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
  
  102   Tue Aug 25 18:22:25 2009 Manfred ValentanPt_ITE512Pt_ITE512 40deg NO air! (for calibration)run04110k25.08.2009 18:20:3025.08.2009Pt: 40 Grad, HV=200V, 36.9% (start run)
to xx% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table:
  
  6   Mon Jul 6 14:30:45 2009 Marko Dragicevic Equipment List    [B]Slow Control:[/B]
Source Measurement Unit Keithley K2410, Inv.Nr.:
540-702, 2000EUR
 carnet_aug09.xls 
  12   Tue Aug 11 14:03:57 2009 Marko Dragicevic Sensor Designs    Screenshots
HEPHY
Gallery
GDS File Viewer
 
 6x 
  20   Wed Aug 19 22:57:13 2009 Marko Dragicevic How-To    TLU (run from DAQPCHEPHY):
ssh
eudet@eudetmac001.cern.ch
ssh tlupc
  
  80   Sun Aug 23 13:15:42 2009 Marko DragicevicPt_ITE512Current and Humindity during first Run    Current of Pt modules during first run
Data
of the run was dicarded.
Compressed air flow was at ~2 bars
 IandRH_first_Pt_run.pngPicture_1.png 
  95   Tue Aug 25 09:01:12 2009 Marko DragicevicPt_ITE512Pt_ITE512 2deg air run03420k25.08.09 08:56:18 25.08.09 09:45: Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  96   Tue Aug 25 09:53:16 2009 Marko DragicevicPt_ITE512Pt_ITE512 4deg NO air!run03520k25.08.2009 09:5025.08.2009 11:00Pt: 4 Grad, HV=200V, 0% (start run) to
14% (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
  
  98   Tue Aug 25 12:30:04 2009 Marko DragicevicPt_ITE512Pt_ITE512 8deg NO air!run03720k25.08.2009 12:4525.08.2009 13:40:13Pt: 8 Grad, HV=200V, 28% (start run) to
31% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=49.1muA
X-Y-Table:
  
  99   Tue Aug 25 13:48:30 2009 Marko DragicevicPt_ITE512Pt_ITE512 10deg NO air!run03820k25.08.2009 13:54:5425.08.2009 15:22:38Pt: 10 Grad, HV=200V, 31.7% (start run)
to 33.8% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table:
  
  100   Tue Aug 25 15:33:07 2009 Marko DragicevicPt_ITE512Pt_ITE512 12deg NO air! run03920k25.08.2009 15:3525.08.2009 17:10Pt: 12 Grad, HV=200V, 34.4% (start run)
to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table:
  
  101   Tue Aug 25 17:14:52 2009 Marko DragicevicPt_ITE512Pt_ITE512 17deg NO air!run04020k25.08.2009 17:17:1125.08.2009 18:08:57Pt: 17 Grad, HV=200V, 36.5% (start run)
to xx.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table:
 Pt-17deg.png 
  15   Fri Aug 14 21:36:17 2009 Markus Friedl Config files    Status of config files as of Friday 14
August 2009 late evening
  
  1   Mon Jul 6 12:22:47 2009 Stephan HänselSiLCMeasurements - hybrids with APV    Pt Modules: 
Hybrids with 4 APVs:
  
 
  
  2   Mon Jul 6 12:24:53 2009 Stephan HänselSiLCModule Drawings     Pt Modules: 

    
3D-View 
    technical drawings:
  
  5   Mon Jul 6 12:29:20 2009 Stephan HänselSiLCSensors - layout     Pt Modules: 
CMS OB1 Sensors:

    
 Wafer-Screenshot.png 
ELOG V3.1.5-fc6679b