Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 3 of 6  Not logged in ELOG logo
Entry  Sun Aug 23 17:18:25 2009, Christian Irmler, Pt_ITE512, pedestal correction, pedcorr008, , 23.08.2009 17:17:36 ,  

Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

Entry  Sun Aug 23 17:19:50 2009, Christian Irmler, Pt_ITE512, internal calibration, cal011, , 23.08.2009 16:30:43, 23.08.2009 17:02:14 

Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

Entry  Sun Aug 23 23:38:27 2009, Georg Auzinger, , Phone numbers, , , ,  

 Georg #70

Wolfgang - Building: 41, Room: 204, Tel: ?

Manfred: Building 38, Room 522, Tel: 70522

Chrisu: B39, room 309, Tel: 79309

Bergi: Tel Zimmer: 79112, Handy: 16-2471

Maks: Tel Zimmer: 79117

Entry  Tue Aug 25 09:00:51 2009, Thomas Bergauer, , beam conditions, , , ,  magnet_settings_withH6B.802.jpg20090825_0859_beam_conditions.jpg

manually changed TRIM3, TRIM4 and TRIM6

Entry  Wed Aug 26 14:26:13 2009, Wolfgang Kiesenhofer, ITE128, S/N final Single-Metal, run001 & run002, , ,  sn-pos_h13-h14_strips_pa_5bins.pdf

Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices.

Entry  Wed Sep 2 14:15:17 2009, Wolfgang Kiesenhofer, ITE128, ITE 128 Cross-Talk, run002, , ,  stripcorr_modall_thrs3_ktau.pdf

Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise.

Entry  Fri Dec 4 12:21:56 2009, Wolfgang Kiesenhofer, , ITE128 strip correlation kendall tau (preliminary result), , , ,  stripcorr_mod1_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod2_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod6_thrs5_ktau_ev100000_run002_strip.pdf

Kendall tau (rank correlation) for module 1 (single layer 1 / h13), module 2 (single layer 2 / h14),  module 6 (standard sensor 2 / h12)

 

 

Entry  Thu Aug 20 19:12:23 2009, Manfred Valentan, alignment_laser, background mesurement with laser OFF, laser002, 10000, 20.08.2009 19:10:09, 20.08.2009 19:11:57 
 
Entry  Thu Aug 20 19:15:29 2009, Manfred Valentan, alignment_laser, laser on, laser003, 10000, 20.08.2009 19:13:04, 20.08.2009 19:14:49 

HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA,
Photodiode: pulse_width=15ns, amplitude=7mV

same settings as run laser001

Entry  Thu Aug 20 18:56:25 2009, Christian Irmler, alignment_laser, laser, laser001, 100000, 20.08.2009 18:48:53,  

2 alignment modules
location in beam direction: h04-h03
laser is shooting on h03 (opposite to the beam)
 

HV=70V, 40MHz, 6 samples
beam off
module 1 (h03) is used w inverter off
since the signal off the second sensor is only 10 percent, the base line of h03 was increased again (now @ 260 ADC).

5ns trigger pulse width, 1 kHz trigger, 
current_laser=10mA,
Photodiode: pulse_width=15ns, amplitude=7mV

bad strips: APV5: 115, APV6: 1

Entry  Thu Aug 20 19:35:06 2009, Manfred Valentan, alignment_laser, laser at high intensity (saturation on near sensor, good signal on far sensor), laser004, 100000, 20.08.2009 19:18:47, 20.08.2009 19:35:05 laser_interference.png

HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA,
Photodiode: pulse_width=50ns, amplitude=45mV

laser at high intensity (saturation on near sensor, good signal on far sensor)

attached picture shows profile of laser on far sensor creating interferences

Entry  Wed Aug 19 20:43:14 2009, Christian Irmler, ITE128, ITE128 shooting into strips w/o pitch adapter, low position, run001, 100600, 19.08.2009 20:42:08, 19.08.2009 22:54:21 

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot

height (y) = 154.0979

ITE128 shooting into strips w/o pitch adapter, low position

Entry  Wed Aug 19 22:56:07 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run002, 100600, 19.08.2009 22:54:23, 20.08.2009 00:11:31 

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot

height (y) = 144.3099

ITE128 shooting into strips w pitch adapter, upper position

Entry  Thu Aug 20 00:31:45 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run003, 100600, 20.08.2009 00:27:36,  

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot

height (y) = 139.3100

ITE128 shooting into strips w pitch adapter, upper edge of sensor

Entry  Wed Aug 26 01:32:25 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode + cooling, run043, 100600, 26.08.2009 01:46:38 , 26.08.2009 07:10:14 

Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

Entry  Sun Aug 23 01:46:03 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: central position, run021, 100k, 23.08.09 00:10 (ca.), 23.08.2009 02:15:10 Picture_1.png

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=115.31

new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture

Entry  Sun Aug 23 08:13:31 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (4mm below center), run023, 100k, 23.08.2009 08:06:58, 23.08.2009 09:30:53 

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=111.31

Entry  Thu Aug 20 11:23:04 2009, Christian Irmler, alignment_beam, beam in center of sensor w telescope, run004 (6860 telescope), 10600, 20.08.2009 11:09:50 , 20.08.2009 11:25:16 

2 alignement modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:50 y:141.3 (center- center, point 1)

Entry  Thu Aug 20 11:38:11 2009, Christian Irmler, alignment_beam, top center, point 7, run6861 (+6862), 10600, 20.08.2009 11:36:35, 20.08.2009 11:53:51 

2 alignement modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:50 y:121.3 (top center, point 7)

Entry  Thu Aug 20 12:18:40 2009, Christian Irmler, alignment_beam, top left on sensor, point 2, run6863 (telescope 6864), 10600, 20.08.2009 12:07:28, 20.08.2009 12:25:57 

2 alignement modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:57 y:121.3 (top left on sensor in beam direction)

ELOG V3.1.5-fc6679b