Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 2 of 6  Not logged in ELOG logo
Entry  Tue Aug 25 11:26:23 2009, Thomas Bergauer, Pt_ITE512, Pt_ITE512 6deg NO air!, run036, 20k, 25.08.2009 11:25, 25.08.2009 12:19:55 
Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD
Entry  Mon Jul 6 12:22:47 2009, Stephan Hänsel, SiLC, Measurements - hybrids with APV, , , ,  
Pt Modules: 
Hybrids with 4 APVs:
     h01-4APV 

    h02-4APV 

Entry  Mon Jul 6 12:24:53 2009, Stephan Hänsel, SiLC, Module Drawings, , , ,  
 Pt Modules: 

     3D-View

    technical drawings:
    
Entry  Mon Jul 6 12:29:20 2009, Stephan Hänsel, SiLC, Sensors - layout, , , ,  Wafer-Screenshot.png
 Pt Modules: 
CMS OB1 Sensors:

     CMS OB1 Dimensions 

 
Entry  Mon Jul 6 16:22:36 2009, Stephan Hänsel, SiLC, Measurements - Sensors, , , ,  
 Pt Modules: 
OB1-Sensors:
     30210331516116 
     30210331415917 

    30210314845402 
     30210332911309 

 
Entry  Mon Jul 6 16:23:51 2009, Stephan Hänsel, SiLC, Module Components, , , ,  
 Pt Modules: 

Pt-1:
Entry  Thu Jul 9 10:29:58 2009, Stephan Hänsel, SiLC, Measurements - Modules, , , ,  
 Pt Modules: 
- Sensoren sind Luftfeuhtigkeitsempfindlich
- die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren 
Entry  Fri Jul 17 14:03:21 2009, Stephan Hänsel, , What to measure, , , ,  
 Origami
 
Testbeam08 Module
Entry  Fri Aug 14 16:45:25 2009, Stephan Hänsel, , Module - Setups, , , ,  
 

    5mm Inbus-Schlüssel
    3mm Inbus Schlüssel
    6- 2(1) x 30 Pt-Pins
    beim 5mm-Sockel müssen
die 2 Löcher über die das optische Modul h03 verschraubt wird noch ausgeweitet werden (Thomas)
    bei Pt-Deckel oben einzeichnen welche
Entry  Fri Aug 14 21:36:17 2009, Markus Friedl, , Config files, , , ,  
Status of config files as of Friday 14 August 2009 late evening

    
        
            Config
file name
            Timing adjusted
            Sensor definition
            Tested
Entry  Mon Jul 6 14:30:45 2009, Marko Dragicevic, , Equipment List, , , ,  carnet_aug09.xls
[B]Slow Control:[/B]
Source Measurement Unit Keithley K2410, Inv.Nr.: 540-702, 2000EUR
-- Koax-Kabel + Adapter auf Banane
Entry  Tue Aug 11 14:03:57 2009, Marko Dragicevic, , Sensor Designs, , , ,  6x
Screenshots
HEPHY Gallery
GDS File Viewer
 KLayout Website
 Layer Properties File Warsaw.lyp in den Attachments.
Entry  Wed Aug 19 22:57:13 2009, Marko Dragicevic, , How-To, , , ,  
TLU (run from DAQPCHEPHY):
ssh eudet@eudetmac001.cern.ch
ssh tlupc
~\eudaq\bin\TLUControl.exe -d1 -a12
Entry  Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , ,  IandRH_first_Pt_run.pngPicture_1.png
Current of Pt modules during first run
Data of the run was dicarded.
Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.
Timescales for RH and I graph are different!!!
Entry  Tue Aug 25 09:01:12 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 2deg air , run034, 20k, 25.08.09 08:56:18 , 25.08.09 09:45:  
Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Tue Aug 25 09:53:16 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 4deg NO air!, run035, 20k, 25.08.2009 09:50, 25.08.2009 11:00 
Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Tue Aug 25 12:30:04 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 8deg NO air!, run037, 20k, 25.08.2009 12:45, 25.08.2009 13:40:13 
Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=49.1muA
X-Y-Table: x=99.6, y=36
Entry  Tue Aug 25 13:48:30 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 10deg NO air!, run038, 20k, 25.08.2009 13:54:54, 25.08.2009 15:22:38 
Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36
Entry  Tue Aug 25 15:33:07 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 12deg NO air! , run039, 20k, 25.08.2009 15:35, 25.08.2009 17:10 
Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36
Entry  Tue Aug 25 17:14:52 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 17deg NO air!, run040, 20k, 25.08.2009 17:17:11, 25.08.2009 18:08:57 Pt-17deg.png
Pt: 17 Grad, HV=200V, 36.5% (start run) to xx.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36
ELOG V3.1.5-fc6679b