Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 2 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Thu Aug 20 15:54:45 2009, Manfred Valentan, BELLE, temp/humidty logger data, , , ,  easylog_under_telescope.gif

position: underneath telescope. dewpoint ~ 15 degree

test with chiller: running 4 hours at 15 degress: NO condensation on alu pipe

Entry  Fri Aug 21 06:16:15 2009, Christian Irmler, BELLE, internal calibration 40 MHz transparent mode, cal003, , 20.08.2009 23:27:12, 21.08.2009 00:05:16 

Belle DUT, intcal
HV=80V, 40 MHz, no beam

transparent mode

Entry  Fri Aug 21 12:08:44 2009, Christian Irmler, BELLE, APVDAQ standalone 40 MHz, pedcorr003, , 21.08.2009 12:08:33, 21.08.2009 12:18:45  

4 Belle DUTs
HV=80V, 40 MHz
pedestal correction
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 

Entry  Fri Aug 21 14:18:11 2009, Christian Irmler, BELLE, internal calibration 31.8 MHz transparent mode, cal004, , 21.08.2009 14:21:40, 21.08.2009 15:01:24 

Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
transparent mode

Origami p-side APV 2&3 with reverse readout order

Entry  Fri Aug 21 15:27:08 2009, Christian Irmler, BELLE, internal calibration 31.8 MHz hit mode, cal005, , 21.08.2009 15:34:43, 21.08.2009 16:29:47  

Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
hit mode

Origami p-side APV 2&3 with reverse readout order

Entry  Fri Aug 21 16:37:22 2009, Christian Irmler, BELLE, internal calibration 40 MHz hit mode, cal006, , 21.08.2009 16:30:33,  

Belle DUT, intcal
HV=80V, 40 MHz, no beam
hit mode

switched back to internal 40 MHz clock

Entry  Fri Aug 21 17:14:58 2009, Wolfgang Kiesenhofer, , S/N Histograms Raw (no data selection), run001 (strips), run002 (pitch adapter), run003 (upper edge), , ,  sn_langaufit_raw_strips.pdfsn_langaufit_raw_pa.pdfsn_langaufit_raw_edgerun.pdf
 
Entry  Fri Aug 21 18:07:57 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz, pedcorr004, , 21.08.2009 17:49:10, 21.08.2009 18:24:31 

4 Belle DUTs
HV=80V, 31.8 MHz
pedestal correction
transparent mode
beam on
 

Entry  Fri Aug 21 22:42:32 2009, Thomas Bergauer, common, EUDAQ config file used when running with telescope, , , ,  testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf

 

Used until Friday, 21.08.09:

 

AndMask = 0xf # 4x4 mm scintillator for trigger 

Used since Friday, 21.08.09: 
AndMask = 0xc # 9x9 mm scintillator for trigger 





Local trigger using TLU only: ALWAYS WITH 9x9mm scintillator

Entry  Sat Aug 22 11:54:49 2009, Thomas Bergauer, common, beam profile, , , ,  20090822_1150_beam_conditions.jpg

beam shifted a bit in vertical direction downwards since 21. August 09 evening

Beam configuration:

Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008

Entry  Sat Aug 22 12:12:34 2009, Christian Irmler, BELLE, internal calibration 40 MHz transparent mode (cooling?), cal007, , 22.08.2009 12:10:32 , 22.08.2009 12:49:09 

Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
chiller set to 13 deg.

external 40 MHz clock

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

Entry  Sat Aug 22 13:28:53 2009, Wolfgang Kiesenhofer, Pt_ITE512, runlist for pt-module angle-scan, , , ,  

Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6

run angle[deg] pos height (xy-table) importance events
1 1 center module   + 10k
2 2 center module   + 10k
3 3 center module   + 10k
4 4 center module   + 10k 
5 5 center module   + 10k 
6 6 center module   + 10k 
7 7 center module   + 10k 
8 8 center module   +  10k
9 9 center module   +  10k
10 10 center module   +  10k
11 12 center module   + 10k 
12 14 center module   - 10k 
13 16 center module   - 10k
14 0 center module   + ? depends on ite512
15 0 upper pos   + 10k
16 0 lower pos   + 10k

 

Entry  Sat Aug 22 13:30:28 2009, Christian Irmler, BELLE, internal calibration 31.8 MHz transparent mode (cooling?), cal008, , 22.08.2009 12:50:48, 22.08.2009 13:29:25 

Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
chiller set to 13 deg.

external 31.8 MHz clock

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

Entry  Sat Aug 22 13:34:14 2009, Christian Irmler, BELLE, pedestal correction 31.8 MHz transparent mode (cooling?), pedcorr005, , 22.08.2009 13:31:27, 22.08.2009 13:41:42 

Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
chiller set to 13 deg.


external 31.8 MHz clock

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated!

Entry  Sat Aug 22 14:46:12 2009, Christian Irmler, BELLE, internal calibration 31.8 MHz transparent mode + cooling, cal009, , 22.08.2009 14:43:55, 22.08.2009 15:22:37 

Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
cooling
chiller set to 13 deg.

Since there was no (or to less) water flow through the small pipe of the origami module, all previous runs with cooling must be repeated.

Bypass removed to achieve better watter flow at the module!
Chiller pump is set to 2800 rpm

Entry  Sat Aug 22 15:12:44 2009, Thomas Bergauer, common, beam profile, , , ,  20090822_1511_beam_conditions.jpg

playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position

Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008

Rate: 3.35E5 particles/spill (measured with SCINT8 in beamline)

Particle Production Applet
Calculator applet

For +120 Gev/c beam:

Pi+ 55.67 %
p 38.95 %
K+ 5.38 %

Entry  Sat Aug 22 15:28:00 2009, Christian Irmler, BELLE, pedestal correction 31.8 MHz transparent mode + cooling, pedcorr006, , 22.08.2009 15:25:35, 22.08.2009 15:36:00 

Belle DUT, HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
pedestal correction

chiller set to 13 deg, 2900 rpm

Entry  Sat Aug 22 22:14:50 2009, Christian Irmler, BELLE, internal calibration 40 MHz transparent mode + cooling, cal010, , 22.08.2009 22:24:22,  

Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
external clock
cooling
chiller set to 13 deg.

Bypass removed to achieve better watter flow at the module!
Chiller pump is set to 2800 rpm

Entry  Sat Aug 22 23:06:22 2009, Christian Irmler, BELLE, pedestal correction 40 MHz transparent mode + cooling, pedcorr007, , 22.08.2009 23:04:29, 22.08.2009 23:13:51 

Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction

chiller set to 13 deg, 2900 rpm

Entry  Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , ,  IandRH_first_Pt_run.pngPicture_1.png

Current of Pt modules during first run

Data of the run was dicarded.

Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.

Timescales for RH and I graph are different!!!

after 3 hours first bottle of compressed air (dewpoint -170 degree C) is gone and sensor Pt-h01 starts to fluctuate again

 

Current of ITE512 plus 2 SiLC08 modules

HV=70V, Current: 25uA first, 29uA then, 35uA latest. now stable

 

ELOG V3.1.5-fc6679b