Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 5 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Eventsup StartTime EndTime Text Attachments
  100   Tue Aug 25 15:33:07 2009 Marko DragicevicPt_ITE512Pt_ITE512 12deg NO air! run03920k25.08.2009 15:3525.08.2009 17:10Pt: 12 Grad, HV=200V, 34.4% (start run)
to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table:
  
  101   Tue Aug 25 17:14:52 2009 Marko DragicevicPt_ITE512Pt_ITE512 17deg NO air!run04020k25.08.2009 17:17:1125.08.2009 18:08:57Pt: 17 Grad, HV=200V, 36.5% (start run)
to xx.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table:
 Pt-17deg.png 
  78   Sun Aug 23 02:18:20 2009 Thomas BergauerITE1282nd run with ITE128: top position (3mm below center); during nightrun02240789523.08.2009 02:16:2123.08.2009 08:04:09ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
 Picture_1.png 
  38   Thu Aug 20 19:46:02 2009 Manfred Valentanalignment_laserlaser at high intensity, far sensor in 2nd positionlaser0055000020.08.2009 19:45:1620.08.2009 19:53:01far sensor in 2nd position; laser at high
intensity (saturation on near sensor, good
signal on far sensor)
  
  40   Thu Aug 20 20:06:06 2009 Manfred Valentanalignment_laserlow intensity (like laser001), but far sensor in 2nd positionlaser00750k20.08.2009 19:57:5220.08.2009 20:05:34HV=70V, 40MHz, 6 samples, beam off, far
sensor in 2nd position
5ns trigger pulse width, 1 kHz trigger,
  
  42   Fri Aug 21 06:24:10 2009 Christian IrmlerBELLEAPVDAQ + telescope (beam alignement)run6872578521.08.2009 00:12:2621.08.2009 00:27:114 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
  57   Fri Aug 21 18:35:13 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent moderun0126000021.08.2009 18:31:0121.08.2009 23:25:034 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
  
  31   Thu Aug 20 15:15:33 2009 Christian Irmleralignment_beambottom center on sensor, point 6run6869615 (beam manipulation by students)20.08.2009 14:56:16 20.08.2009 15:14:112 alignment modules
location in beam direction: h04-h03
beam in center of sensor
  
  44   Fri Aug 21 06:34:39 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHzrun0057500021.08.2009 06:10:4121.08.2009 10:37:33was originally  run004, renamed after
run was stopped to avoid duplicate names
4 Belle DUTs
  
  47   Fri Aug 21 12:06:29 2009 Christian IrmlerBELLEAPVDAQ standalone hit mode 40 MHzrun0087500021.08.2009 11:15:0921.08.2009 11:29:534 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
  48   Fri Aug 21 12:06:39 2009 Christian IrmlerBELLEAPVDAQ standalone hit mode 40 MHzrun0097500021.08.2009 11:48:2221.08.2009 12:01:534 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
  50   Fri Aug 21 12:22:43 2009 Christian IrmlerBELLEAPVDAQ standalone 31.8 MHz hit moderun0107500021.08.2009 12:53:02 21.08.2009 13:35:014 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source
  
  51   Fri Aug 21 13:38:20 2009 Christian IrmlerBELLEAPVDAQ standalone 31.8 MHz hit moderun0117500021.08.2009 13:35:25  4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
  
  59   Sat Aug 22 01:06:34 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode (cooling?)run0137500021.08.2009 23:49:38 22.08.2009 03:21:48Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples
  
  60   Sat Aug 22 03:27:13 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz transparent mode (cooling?)run01475k22.08.2009 03:25:2322.08.2009 07:08:09 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples
chiller set
to 13 deg.
 

  
  61   Sat Aug 22 08:32:02 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz hit mode (cooling?)run01575k22.08.2009 08:15:0522.08.2009 09:25:21 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller
set to 13 deg.
 

  
  62   Sat Aug 22 09:44:50 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz hit mode (cooling?)run01675k22.08.2009 09:42:3822.08.2009 10:24:05 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller
set to 13 deg.
 

  
  63   Sat Aug 22 10:28:50 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01775k22.08.2009 10:26:2822.08.2009 11:16:12 HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller
set to 13 deg.
 

  
  64   Sat Aug 22 11:26:00 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01875k22.08.2009 11:16:5722.08.2009 11:58:56 HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller
set to 13 deg.
 

  
  73   Sat Aug 22 15:52:33 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent mode + coolingrun01975k22.08.2009 15:50:4022.08.2009 19:14:21Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900
  
ELOG V3.1.5-fc6679b