Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009  Not logged in ELOG logo
Message ID: 71     Entry time: Sat Aug 22 15:12:44 2009
Author: Thomas Bergauer 
Project: common 
Subject: beam profile 
Run Number:  
Events:  
StartTime:  
EndTime:  

playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position

Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008

Rate: 3.35E5 particles/spill (measured with SCINT8 in beamline)

Particle Production Applet
Calculator applet

For +120 Gev/c beam:

Pi+ 55.67 %
p 38.95 %
K+ 5.38 %

Attachment 1: 20090822_1511_beam_conditions.jpg  195 kB  | Show | Show all
ELOG V3.1.5-fc6679b