Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008, Page 4 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Projectup Subject Run Number Events StartTime EndTime
  1   Tue May 6 13:51:43 2008 Thomas BergauerotherEquipment list    
Slow Control:
K2410 SMU
K2700 Scanning Voltmeter
Shut-Widerstand-Platine
Flachbandkabel
TRHX + 2 Sensoren + Kabel
Koax-Kabel + Adapter auf Banane
LV-Power-Supplies
Die Katze (Belle-HV-Supply)

DAQ:
Chrisu-PC (inkl. Keyboard, Maus, 2 Monitore)
9U-VME-Crate samt Modulen und PS
DOCK-Box
VME-Kabel (bockig)
30m-Kabel (8xCat7, 2xCat5, 2xgrau)
Lemo-Kabel
100pin-Flachkabel
Bananenkabel
Hybridkabel
Special TLU-Adapter (flipping pin order of RJ45)
Schrauben für Crate-Montage

DUT:
9 SiLC-Module
Micron-Modul
3 Belle-Module + Rahmen
Schrauben für Montage am Drehteller

EDV:
Netzwerkkabel
Netzwerk-Switch
WLAN-Router WRT54GL
1TB externe Festplatte
Webcam
USB-Stick

Tools:
Scope + 4 Probes
Diverse Adaptoren Lemo-BNC, Lemo-Lemo
Taschenlampe
Massband
Multimeter
Werkzeug (Schraubenzieher & Co)
Pinzetten
Laserpointer
Schwarze Fetzen
Scotch tape
Kabelbinder
Adapter f. Steckdosen falls erforderlich
Verteiler-Leisten
Tixo klein & gross

Misc:
5 pcs. SiLC Alignment Sensors for Marcos Fernandez Garcia
Fondueset Wink
Digitalkamera
Akkus+Ladegerät
Dickes Logbook
Kugelschreiber/Bleistifte
Pflaster
VME-6U-PS zur Reparatur
2 x Pixel-FED für W.J. & D.K.
  8   Mon May 19 15:14:40 2008 Markus FriedlotherTentative Beam Test Schedule    
Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on

1) Telescope + 8xSilC (~7hrs, overnight; first part)
2) 8xSilc, no telescope (fast runs during day)
3) Telescope + 8xSilC (~7hrs, overnight; second part after DUT shift)
4) 1xSilc, rotation
5) Belle, telescope

* starting telescope alignement
* adc delay scan, intcal, pedrun, pedcorr
* DUT alignement
* std. settings, telescope zero supr.(zp) 1st half, lunch break
* std. settings, telescope zero supr. 2nd half
* std. settings, telescope raw data, 1st half
* std. settings, telescope raw data, 2nd half
* optionally HV scan, tel. zp., (10 HV settings --> 2x 10 runs)
* unmount 7 DUTs
* std run 0 deg., (2 runs)
* angle scan (about 10 runs)      
* install Belle DUT
* std. settings, telescope raw, transparent mode
* std. settings, telescope sp, transparent mode, high statistics
* std. settings, telescope sp, processed mode, high statistics
  9   Mon May 19 15:21:49 2008 Markus FriedlotherCERN SPS page 1    

SPS Status

SPS Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html

Manual - http://jwenning.web.cern.ch/jwenning/documents/SPS/Operation/Page-1%20description.htm

Linac, PSB, CPS Status

Linac, PSB, CPS Status
  12   Fri May 30 10:36:18 2008 Marko DragicevicotherImportant Information/Contact    
IPs
Linksys Router
  • external: routerhephy.cern.ch (137.138.171.102)
  • internal: 192.168.1.1
    US&ER /PA_SS'WD: admin/sensor
  • WLAN-SSID: HEPHY
  • WLAN-WPA-TKIP: testbeam08

EUDETMAC
  • external: eudetmac001.cern.ch
  • U1SE*R/P*AS§S/WD (ssh): eudet/gsigsi
  • from EUDETMAC to TLU:
    ssh tlupc

LAB2PC (APVDAQ, DUT HV)
  • internal: 192.168.1.10
  • external VNC: routerhephy.cern.ch (137.138.171.102:5900)
    pa2s2s2w2d: hephy

XY Table
  • internal VNC: 192.168.1.11
    pa2s2s2w2d: hephy

Beam Control PC
  • external VNC: CWO-HNA453-H6B1.CERN.CH (137.138.61.206)

Phone
Vienna CERN Mobile Phone (usually Thomas Bergauer)
  • 162471

Daniel Haas
  • 165423

Marko Dragicevic
  • Hostel (39-120): 79 120
  • Private: +43 650 4243343

Markus Friedl
  • Hostel (41-107): 60 107
  • Private: +43 699 17251085

Thomas Bergauer
  • Hostel (39-220): 79 220
  • Private: +43 664 3769400 (switched off during testbeam)

Christian Irmler
  • Hostel (41-222): 60 222
  • Private: +43 699 19437327

Misc
SPS Page 1

Path to start cesar
  19   Sat May 31 18:33:50 2008 Thomas Bergauerotherbeam profile    
Beam configuration
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008

Rate: 5.7E5 particles/spill (measured with SCINT8 in beamline)

Particle Production Applet
Calculator applet

For +120 Gev/c beam:

Pi+55.67 %
p38.95 %
K+ 5.38 %
Attachment 1: Picture_1.png
Picture_1.png
Attachment 2: beamline_settings.png
beamline_settings.png
ELOG V3.1.5-fc6679b