Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008, Page 3 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Projectdown Subject Run Number Events StartTime EndTime
  45   Mon Jun 2 22:13:17 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28231000002.06.2008 22:12:4402.06.2008 22:34:49
SiLC beam test - CERN SPS June 2008
HV scan,  HV=70V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  46   Mon Jun 2 22:37:13 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28241000002.06.2008 22:36:3702.06.2008 22:53:15
SiLC beam test - CERN SPS June 2008
HV scan,  HV=80V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  47   Mon Jun 2 22:55:49 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28251000002.06.2008 22:55:0302.06.2008 23:12:09
SiLC beam test - CERN SPS June 2008
HV scan,  HV=90V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  48   Mon Jun 2 23:14:58 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28261000002.06.2008 23:14:1902.06.2008 23:31:29
SiLC beam test - CERN SPS June 2008
HV scan,  HV=120V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  49   Mon Jun 2 23:34:29 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28271000002.06.2008 23:33:4002.06.2008 23:52:04
SiLC beam test - CERN SPS June 2008
HV scan,  HV=150V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  50   Tue Jun 3 00:20:06 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28281000002.06.2008 23:55:0603.06.2008 00:18:56
SiLC beam test - CERN SPS June 2008
HV scan,  HV=200V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  58   Tue Jun 3 12:32:51 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28311000003.06.2008 12:31:4203.06.2008 13:19:36
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 10 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_10.gif
drehteller_rot_10.gif
  60   Tue Jun 3 13:28:15 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28321000003.06.2008 13:24:0703.06.2008 13:53:18
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 20 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_20.gif
drehteller_rot_20.gif
  61   Tue Jun 3 14:12:02 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28331000003.06.2008 14:10:4003.06.2008 14:29:26
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 30 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_30.gif
drehteller_rot_30.gif
  62   Tue Jun 3 14:59:14 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28341000003.06.2008 14:56:3203.06.2008 15:15:37
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 40 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_40.gif
drehteller_rot_40.gif
  63   Tue Jun 3 15:39:57 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28351000003.06.2008 15:36:4703.06.2008 15:55:34
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 50 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_50.gif
drehteller_rot_50.gif
  64   Tue Jun 3 16:14:26 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28361000003.06.2008 16:13:1803.06.2008 16:33:20
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 60 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask

Please note that there are 8 modules read out in this run, but the last one (#7) is placed outside the beam and
hence does not provide any meaningful data.
Attachment 1: drehteller_rot_60.gif
drehteller_rot_60.gif
  65   Tue Jun 3 16:53:20 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28372000003.06.2008 16:49:4003.06.2008 17:26:49
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 0 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_00.gif
drehteller_rot_00.gif
Attachment 2: drehteller_rot.cdr
  66   Tue Jun 3 18:17:47 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run283847815903.06.2008 18:38:0704.06.2008 10:41:51
SiLC beam test - CERN SPS June 2008
HV=100V, xy "telescope"
8 modules, 40MHz, 6 samples, position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


this is a run where modules 0,2,4,6 are in normal position, while modules 1,3,5,7 are rotated by 90 deg
(counterclockwise as seen by the beam) and flipped (back<->forth) in order to achieve the minimum spacing
(~10.3mm) between "corresponding" x and y planes.
  7   Wed May 14 16:15:30 2008 Markus FriedlBELLEMicron DDD5 Photos    
This is the new Micron DDD5 double-sided module with 3+3 APV25 readout chips on each side.

The p-side flex hybrid sits at the edge of the sensor, while the n-side flex hybrid is located on top of about
1/3 of the sensor, separated by 1mm of Rohacell.

Sensor data (copied from the Micron catalogue):

DESIGN DDD5 - AC COUPLED ION IMPLANTED TOTALLY DEPLETED DOUBLE SIDED DOUBLE METAL MICROSTRIP DETECTOR

SILICON DETECTOR TYPE: AC coupled ion implanted totally depleted silicon microstrip detector.
DESIGN: Double sided, two metal layers on NN+ 6 inch wafer technology.

JUNCTION SIDE
No STRIPS: 384
STRIP PITCH: 50 µm

OHMIC SIDE
First Metal
No STRIPS: 768
STRIP PITCH: 153.5 µm
Second Metal
No STRIPS: 384
STRIP PITCH: 49.5 µm

POLYSILICON RESISTOR: 2.5 ± 0.5 M
COUPLING CAPACITOR: 100 pF
SILICON THICKNESS: 300 ± 10 µm
CHIP DIMENSIONS: 120.125 x 21.2 mm2
FULL DEPLETION VOLTAGE (FD): 50 V maximum
OPERATING VOLTAGE: FD to 2FD

EXPERIMENTS: D2, FNAL
Attachment 1: micron_pside.jpg
micron_pside.jpg
Attachment 2: micron_nside.jpg
micron_nside.jpg
Attachment 3: micron_pside_detail.jpg
micron_pside_detail.jpg
Attachment 4: micron_nside_detail.jpg
micron_nside_detail.jpg
  52   Tue Jun 3 02:38:21 2008 Markus FriedlBELLEAPVDAQ + telescope (0-sup)run282910500003.06.2008 02:29:5103.06.2008 09:08:58
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
  53   Tue Jun 3 09:12:42 2008 Markus FriedlBELLEAPVDAQ onlyrun00054502003.06.2008 09:11:3003.06.2008 09:24:42
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

SAME AS PREVIOUS, BUT 0-SUP WITHOUT TELESCOPE


stuck after 45020 events with the repeated message  
 ***WARNING*** FIFO3 empty, FADC 0. Event discarded, reset sent.
to be investigated.
  54   Tue Jun 3 09:27:27 2008 Markus FriedlBELLEAPVDAQ onlyrun00062392903.06.2008 09:26:1603.06.2008 09:34:22
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

RETRY

STUCK again after some time - now adding veto clear in error handling routine
  55   Tue Jun 3 09:57:17 2008 Markus FriedlBELLEAPVDAQ onlyrun000710500003.06.2008 09:40:1803.06.2008 10:12:48
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

RETRY after software bugfix - apparently works
  56   Tue Jun 3 10:58:54 2008 Markus FriedlBELLEAPVDAQ onlyped0071000003.06.2008 10:53:0403.06.2008 10:58:47
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
beam on (lower intensity)
ELOG V3.1.5-fc6679b