Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008, Page 1 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subjectup Run Number Events StartTime EndTime
  16   Sat May 31 17:29:40 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run27162000031.05.2008 14:59:2631.05.2008 15:56:23
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware

in fact, trigger was set to coincidence of ALL FOUR scintillators, hence only (less than) 4 x 4 mm2 window !!!
horizontal position ("target") = 0.0mm
  18   Sat May 31 17:36:14 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run271810000031.05.2008 16:21:5731.05.2008 21:08:32
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

- long break in the middle due to power outage after thunderstorm

horizontal position ("target") = +2.0mm - after we decided to scan the whole area in 3 steps
this is RIGHT position

all 3 positions are:
RIGHT: +2.00 mm    <--- this run
MID:   -2.75 mm
LEFT:  -7.50 mm
  20   Sat May 31 22:54:29 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run271910000031.05.2008 22:34:3801.06.2008 01:49:30
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

horizontal position ("target") = -2.75mm
this is MID position
  21   Sun Jun 1 01:56:47 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run272010000001.06.2008 01:51:4501.06.2008 07:48:09
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware

horizontal position ("target") = -7.5mm
this is LEFT position
  52   Tue Jun 3 02:38:21 2008 Markus FriedlBELLEAPVDAQ + telescope (0-sup)run282910500003.06.2008 02:29:5103.06.2008 09:08:58
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
  66   Tue Jun 3 18:17:47 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run283847815903.06.2008 18:38:0704.06.2008 10:41:51
SiLC beam test - CERN SPS June 2008
HV=100V, xy "telescope"
8 modules, 40MHz, 6 samples, position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


this is a run where modules 0,2,4,6 are in normal position, while modules 1,3,5,7 are rotated by 90 deg
(counterclockwise as seen by the beam) and flipped (back<->forth) in order to achieve the minimum spacing
(~10.3mm) between "corresponding" x and y planes.
  17   Sat May 31 17:32:35 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) run2717649031.05.2008 15:57:5831.05.2008 16:09:21
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

trigger is now correct (9 x 9 mm2 window)
horizontal position ("target") = 0.0mm
  36   Mon Jun 2 13:19:10 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run27873000002.06.2008 13:15:0402.06.2008 14:27:57
SiLC beam test - CERN SPS June 2008
HV scan,  HV=100V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12


Reference run with nominal HV after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  37   Mon Jun 2 14:32:40 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run27881000002.06.2008 14:31:1502.06.2008 14:51:55
SiLC beam test - CERN SPS June 2008
HV scan,  HV=10V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  38   Mon Jun 2 14:55:38 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run27891000002.06.2008 14:54:3302.06.2008 15:19:12
SiLC beam test - CERN SPS June 2008
HV scan,  HV=20V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  40   Mon Jun 2 15:21:53 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run27901000002.06.2008 15:20:4402.06.2008 15:38:04
SiLC beam test - CERN SPS June 2008
HV scan,  HV=30V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  41   Mon Jun 2 15:41:20 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run27911000002.06.2008 15:40:2002.06.2008 15:58:16
SiLC beam test - CERN SPS June 2008
HV scan,  HV=40V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  42   Mon Jun 2 16:01:10 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run2792453602.06.2008 16:00:0902.06.2008 16:19:42
SiLC beam test - CERN SPS June 2008
HV scan,  HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

stopped after beam problem


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  43   Mon Jun 2 21:37:10 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28211000002.06.2008 21:32:5702.06.2008 21:51:55
SiLC beam test - CERN SPS June 2008
HV scan,  HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

re-try after several hours of beam down


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  44   Mon Jun 2 21:54:34 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28221000002.06.2008 21:53:3702.06.2008 22:10:53
SiLC beam test - CERN SPS June 2008
HV scan,  HV=60V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  45   Mon Jun 2 22:13:17 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28231000002.06.2008 22:12:4402.06.2008 22:34:49
SiLC beam test - CERN SPS June 2008
HV scan,  HV=70V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  46   Mon Jun 2 22:37:13 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28241000002.06.2008 22:36:3702.06.2008 22:53:15
SiLC beam test - CERN SPS June 2008
HV scan,  HV=80V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  47   Mon Jun 2 22:55:49 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28251000002.06.2008 22:55:0302.06.2008 23:12:09
SiLC beam test - CERN SPS June 2008
HV scan,  HV=90V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  48   Mon Jun 2 23:14:58 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28261000002.06.2008 23:14:1902.06.2008 23:31:29
SiLC beam test - CERN SPS June 2008
HV scan,  HV=120V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  49   Mon Jun 2 23:34:29 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28271000002.06.2008 23:33:4002.06.2008 23:52:04
SiLC beam test - CERN SPS June 2008
HV scan,  HV=150V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
ELOG V3.1.5-fc6679b