Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 4 of 5  Not logged in ELOG logo
ID Date Author Projectup Subject Run Number Events StartTime EndTime Data
  35   Tue Jan 7 18:41:55 2014 Markus FriedlInfineonrunrun028200k07.01.2014 18:40:4007.01.2014 19:07:32Good

HV=250V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  36   Tue Jan 7 19:12:07 2014 Markus FriedlInfineonrunrun029200k07.01.2014 19:11:0507.01.2014 19:38:00Good

HV=260V  I=8.7uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  37   Tue Jan 7 19:44:45 2014 Markus FriedlInfineonrunrun030200k07.01.2014 19:43:3507.01.2014 20:11:03Good

HV=270V  I=8.6uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  38   Tue Jan 7 20:26:50 2014 Markus FriedlInfineonrunrun031200k07.01.2014 20:25:3207.01.2014 20:58:47Good

HV=280V  I=8.4uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  39   Tue Jan 7 21:02:58 2014 Markus FriedlInfineonrunrun032200k07.01.2014 21:01:4207.01.2014 21:29:03Good

HV=290V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  40   Tue Jan 7 21:34:41 2014 Markus FriedlInfineonrunrun0334.117.024 (4M)07.01.2014 21:33:1208.01.2014 08:52:37Good

HV=300V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

 

beam gone at 8:00 morning because of scheduled beam development. last few 100 events only noise.

  73   Fri Jan 24 18:02:46 2014 Wolfgang TreberspurgInfineonNew Infineon Stack    Good

Exchanged AIDA stack with modified Infineon Stack

Configuration:

Beam   Infineon_TB_2014_Baby1(P0)   ---   Inifineon_TB_2014_Baby2(P1) |||  Infineon_TB_2012_Baby2(P2)  --- Infineon_TB_2012_Baby1(P3) ||| Infineon_TB_2012_Strixel_Top-left(N0)  --- Infineon_TB_2012_Strixel_Bottom-right(N1) ---

  74   Sat Jan 25 18:24:03 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_0011.05 M25.01.2014 10:3025.01.2014 15:40Unknown

HV at 300V; I at app. 11µA 4GeV, Single mode

Modules centered to beam but no hits at additional Strixel modul. Perhaps HV problems (High noise of Strixel almost did not change after biasing)

-> HV connection will be checked at next opportunity to enter area.

  75   Sat Jan 25 18:28:38 2014 Wolfgang TreberspurgInfineonCalibration run Infineon Stack 2Calibration_Run_Infineon_Stack2_0018290025.01.2014 10:1525.01.2014 10:25Unknown

HV 300V, I ca. 11µA single mode

  76   Sat Jan 25 18:46:32 2014 Wolfgang TreberspurgInfineonMulit 6 mode Run Stack 2HW_Run_Infineon_Stack2_Multi_001340k25.01.2014 16:3025.01.2014 18:40Unknown

HV 300V, I 10µA

Beam Energy changed during the run between 2GeV - 5GeV - 4GeV

Latency perhaps not optimal set (has been 95) but exchanged trigger cable seems to require 93

  77   Sat Jan 25 21:14:46 2014 Wolfgang TreberspurgInfineonMulit 6 mode Run Stack 2HW_Run_Infineon_Stack2_Multi_002230k25.01.2014 19:0025.01.2014 21:15Good

HV 300V, I 10µA

Beam Energy  4GeV

Latency changed to 93

  78   Sun Jan 26 19:12:42 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_0024 M25.01.2014 22:3026.01.2014 15:15Good

HV at 300V; I at app. 11µA 4GeV, Single mode

 

  79   Sun Jan 26 19:14:07 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_003140 k26.01.2014 18:1026.01.2014 19:15Good

HV at 300V; I at app. 10µA 5GeV, Single mode

 

  80   Mon Jan 27 12:20:53 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_004800k27.01.2014 09:1027.01.2014 12:15Good

HV at 300V; I at app. 10µA 3GeV, Single mode

 

  81   Wed Jan 29 12:02:52 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_001100k28.01.2014 16:3028.01.2014 16:50Good

HV at 0V; I at app. 5nA 3GeV, Single mode

 

  82   Wed Jan 29 12:04:53 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_002140k28.01.2014 16:5028.01.2014 17:20Good

HV at 100V; I at app. 8.5µA 3GeV, Single mode

 

  83   Wed Jan 29 12:07:48 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_003200k28.01.2014 17:4028.01.2014 18:20Good

HV at 150V; I at app. 9µA 3GeV, Single mode

 

  84   Wed Jan 29 12:08:52 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_004200k28.01.2014 19:3028.01.2014 20:00Good

HV at 200V; I at app. 9.5µA 3GeV, Single mode

 

  85   Wed Jan 29 12:10:06 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_005200k28.01.2014 20:0028.01.2014 23:00Good

HV at 210V; I at app. 8.5µA 3GeV, Single mode

 

  86   Wed Jan 29 12:11:00 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_006200k28.01.2014 20:3028.01.2014 21:00Good

HV at 220V; I at app. 8.5µA 3GeV, Single mode

 

ELOG V3.1.5-fc6679b