Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 2 of 5  Not logged in ELOG logo
ID Date Author Projectup Subject Run Number Events StartTime EndTime Data
  54   Thu Jan 9 21:41:20 2014 Markus FriedlAIDArunrun046100k09.01.2014 21:40:2909.01.2014 23:07:16Good

HV=70V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  55   Thu Jan 9 23:27:27 2014 Markus FriedlAIDArunrun047100k09.01.2014 23:26:3510.01.2014 00:52:56Good

HV=80V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  56   Fri Jan 10 00:58:46 2014 Markus FriedlAIDArunrun048500k10.01.2014 00:57:4810.01.2014 08:17:57Good

HV=90V  I=3.9uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  57   Fri Jan 10 08:21:46 2014 Markus FriedlAIDArunrun049100k10.01.2014 08:20:49 10.01.2014 09:49:46Good

HV=100V  I=4.2uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  58   Fri Jan 10 09:54:11 2014 Markus FriedlAIDArunrun050100k10.01.2014 09:53:1310.01.2014 11:21:12Good

HV=110V  I=4.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  60   Fri Jan 10 11:26:54 2014 Markus FriedlAIDArunrun051100k10.01.2014 11:26:0810.01.2014 12:53:12Good

HV=120V  I=4.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  61   Fri Jan 10 13:04:49 2014 Markus FriedlAIDArunrun052100k10.01.2014 13:04:0510.01.2014 14:30:18Good

HV=130V  I=4.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  62   Sat Jan 11 20:56:29 2014 Markus FriedlAIDArunrun053100k11.01.2014 20:55:2911.01.2014 22:25:43Good

HV=140V  I=7.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  63   Sat Jan 11 22:32:19 2014 Markus FriedlAIDArunrun054800k11.01.2014 22:30:4412.01.2014 10:13:10Good

HV=150V  I=5.3uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  64   Sun Jan 12 10:36:37 2014 Markus FriedlAIDArunrun05531091312.01.2014 10:34:4412.01.2014 15:42:47Good

HV=100V  I=3.6uA
position = 23 / -35 mm relative to before
5GeV beam, 6 samples
narrow timing (trigger width)

  65   Sun Jan 12 18:04:18 2014 Markus FriedlAIDArunrun056510k12.01.2014 17:59:5713.01.2014 01:47:50Good

HV=100V  I=3.7uA
position = -25 / 0 mm relative to initial
5GeV beam, 6 samples
narrow timing (trigger width)

Something strange with x/y stage: stuck at approximately y=+3.5 (hitting box lid?), now back to 0, but about 180 strips off compared to run054 (y=0 as well)...

  66   Mon Jan 13 01:58:14 2014 Markus FriedlAIDArunrun057900k13.01.2014 01:56:2613.01.2014 10:48:22Good

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered)
5GeV beam, single sample
narrow timing (trigger width)

  71   Fri Jan 24 11:03:14 2014 Wolfgang TreberspurgAIDAAIDAHW_AIDA002024.01.2014 10:02 Crap

TuxDaq crashed

  20   Tue Jan 7 09:12:24 2014 Thomas BergauerBelle SVDrunrun01520k07.01.2014 09:10:5207.01.2014 09:15:39Good

 HV=290V  I=9.55uA

position centered horizontally (+5mm)
DESY table z=-346 x=-255
 
energy switched back to 3Gev/c
  28   Tue Jan 7 14:51:45 2014 Thomas BergauerBelle SVDTLU control    Unknown

1. ssh bastion

2. ssh belle-control

3. ssh telescope-admin@tb-aconite
(password telescope++)

dann:

How to generate trigger from TLU through FTSW to detector systems
2014.1.6 Mikihiko Nakao

* step 1 - open monitor window to show the FTSW status

 [you@bastion03 ~]$ ssh telescope-admin@belle-rpc1
  (still only limited people has access to b2daq account:
   ask DAQ people or Katsuro Nakamura of SVD group)

 [b2daq@belle-rpc1 ~]$ ssh telescope-admin@ttd10
 [b2daq@ttd10 ~]$ statft -55 -i -c
   (55 is the FTSW board-id, -i -c are to show the status repeatedly)

* step 2 - initialize FTSW to accept TLU trigger

 [b2daq@ttd10 ~]$ trigft -55 tlu

* step 3 - start trigger at TLU

 [you@bastion03 ~]$ ssh belle-rpc2
 [you@belle-rpc2 ~]$ ssh telescope-admin@tb-aconite
  (ask Alan Campbell or somebody for the password)

 telescope-admin@tb-aconite:~$ cd eudaq-nakao/bin
 ...$ ./TLUControl.exe -a 4 -d 1 -i RJ45 -w 10 -n

 here, -a option gives the possible trigger coincidence
  (-a 1  --- dummy trigger generator from FTSW)
   -a 2  --- trigger counter 1 only
   -a 4  --- trigger counter 2 only
   -a 8  --- trigger counter 3 only
   -a 6  --- trigger counter 1 and 2
   -a 10 --- trigger counter 1 and 3
   -a 12 --- trigger counter 2 and 2
   -a 14 --- trigger counter 1 and 2 and 3
 other options are kept to be the same
   -d 1 -i RJ45 --- connection to FTSW
   -w 10        --- update frequency (10msec)
   -n           --- suppress messages

 This gives you output like:

   Status:    00,--,--,--,--,-- (0,0)
   Scalers:   0, 7, 0, 0    <== from FTSW-dummy and trigger counters 1, 2, 3
   Particles: 1
   Triggers:  0             <== actual trigger to be distributed to FTSW
   Entries:   0
   TS errors: 0, 0 (redundancy, re-read)
   Timestamp: 0x4f25a008 (1327865864) = 3.45791
   Time: 3.463 s, Freq: 0 Hz, Average: 0 Hz

- 

  59   Fri Jan 10 11:02:31 2014 Markus FriedlBelle SVDPower supply  10.01.2014 11:00:00 Unknown
Attachment 1: KenWood100114.png
KenWood100114.png
  1   Sat Jan 4 16:30:46 2014 Markus FriedlInfineoncalcal0018380004.01.2014 16:16:5104.01.2014 16:25:46Good

HV=300V  I=9.3uA  (total)

  3   Mon Jan 6 16:33:13 2014 Markus FriedlInfineonrunrun001200k06.01.2014 16:28:5806.01.2014 17:10:56Good

HV=300V  I=11.1uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  4   Mon Jan 6 17:17:47 2014 Markus FriedlInfineonrunrun002200k06.01.2014 17:14:3906.01.2014 18:00:34Good

HV=100V  I=8.5uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  5   Mon Jan 6 18:06:16 2014 Markus FriedlInfineonrunrun003200k06.01.2014 18:04:1406.01.2014 18:44:15Good

HV=200V  I=9.3uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

ELOG V3.1.5-fc6679b