Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi), Page 3 of 7  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subjectup Run Number Events XYPosition Cooling Data
  45   Thu Apr 13 22:52:18 2017 Johannes GrossmannMaPSATeleskope Correlation39500000NoUnknown

Telescope 1274

Threshold 90 

Mapsa CLK Delay 6 ns

  46   Thu Apr 13 22:59:32 2017 Johannes GrossmannMaPSATeleskope Correlation40500000NoUnknown

Telescope 1276

Threshold 90 

Mapsa CLK Delay 8 ns

Reference out of sync

  47   Thu Apr 13 23:09:37 2017 Johannes GrossmannMaPSATeleskope Correlation42500000NoUnknown

Telescope 1278

Threshold 90 

Mapsa CLK Delay 8 ns

  48   Thu Apr 13 23:20:07 2017 Johannes GrossmannMaPSATeleskope Correlation43500000NoUnknown

Telescope 1278

Threshold 90 

Mapsa CLK Delay 10 ns

Reference out of sync

  49   Thu Apr 13 23:27:01 2017 Johannes GrossmannMaPSATeleskope Correlation44500000NoUnknown

Telescope 1280

Threshold 90 

Mapsa CLK Delay 10 ns

  50   Thu Apr 13 23:30:39 2017 Johannes GrossmannMaPSATeleskope Correlation45500000NoUnknown

Telescope 1282

Threshold 90 

Mapsa CLK Delay 12 ns

  51   Thu Apr 13 23:40:26 2017 Johannes GrossmannMaPSATeleskope Correlation46500000NoUnknown

Telescope 1284

Threshold 90 

Mapsa CLK Delay 14 ns

  52   Thu Apr 13 23:50:36 2017 Johannes GrossmannMaPSATeleskope Correlation47500000NoUnknown

Telescope 1286

Threshold 90 

Mapsa CLK Delay 16 ns

  53   Fri Apr 14 00:01:03 2017 Johannes GrossmannMaPSATeleskope Correlation48500000NoUnknown

Telescope 1288

Threshold 90 

Mapsa CLK Delay 18 ns

  54   Fri Apr 14 00:12:05 2017 Johannes GrossmannMaPSATeleskope Correlation48500000NoUnknown

Telescope 1288

Threshold 90 

Mapsa CLK Delay 20 ns

  55   Fri Apr 14 00:12:53 2017 Johannes GrossmannMaPSATeleskope Correlation49500000NoUnknown

Telescope 1292

Threshold 90 

Mapsa CLK Delay 20 ns

  56   Fri Apr 14 00:22:30 2017 Johannes GrossmannMaPSATeleskope Correlation50500000NoUnknown

Telescope 1292

Threshold 90 

Mapsa CLK Delay 22 ns

  57   Fri Apr 14 00:40:23 2017 Johannes GrossmannMaPSATeleskope Correlation51500000NoUnknown

Telescope 1294

Threshold 90 

Mapsa CLK Delay 24 ns

  58   Fri Apr 14 01:33:35 2017 Johannes GrossmannMaPSATeleskope Correlation522500000NoUnknown

Telescope 1296

Threshold 90 

Mapsa CLK Delay 0 

  2   Wed Apr 12 21:55:13 2017 Axel Königcommonpulse shape    NoUnknown

pulse shape looks good for latency 132. This value is now taken by default for all runs unless otherwise stated.

  75   Sat Apr 15 16:52:06 2017 Axel KoenigALiBaVa (IFX)run_001_Baby_100V.dat001250000102.5, 22.5, 240NoUnknown

Remarks: Telescope run 562. Telescope chiller turned off (could be the root cause of runs crashing).

Position: 102.5, 22.5, 240 (should be the center of the sensor).

Parameter Value
Alibava run run_001_Baby_100V.dat
Telescope run 562
Triggers 250000
Alibava trigger eff. ~93%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 102.5 mm
Table z 22.5 mm
Tabe rot

240 deg (parallel to tele. planes)

  105   Mon Apr 17 13:30:01 2017 Axel KoenigALiBaVa (IFX)run_001_HPK_CB_200V.dat001450000107, 0, 240NoUnknown

Remarks: Telescope run 604. Bias scan 200 V. Only one chip.

Telescope chiller turned off (could be the root cause of runs crashing).

Parameter Value
Alibava run run_001_HPK_CB_200V.dat
Telescope run 604
Triggers 450000
Alibava trigger eff. ~64%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -200
Latency 132
Table x 107 mm
Table z 0 mm
Tabe rot

240 deg

  1   Wed Apr 12 21:06:44 2017 Axel KönigALiBaVa (IFX)run_001_IFX_CB_100V.dat001200000109, 4.5, 240NoUnknown

First run for alibava modules with Sensor IFX_CB.

Beam energy = 5.6 GeV

Telescope threshold = 6

Telescope data file = 496

Bias voltage = -100V

Telescope synchornisation: yes

Position table (is center of sensor):

x=109mm

y=4.5mm

phi=240 deg

 

  9   Thu Apr 13 10:03:29 2017 Axel KönigALiBaVa (IFX)run_001_IFX_CB_100V.dat001200000109, 4.5, 240NoUnknown

Remarks: Telescope run 496. Bias voltage 100 V. First run at DESY TB.

Parameter Value
Alibava run run_001_IFX_CB_100V.dat
Telescope run 496
Triggers 200000
Alibava trigger eff. ?
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 109 mm
Table z 4.5 mm
Tabe rot

240 deg (parallel to tele. planes)

  127   Wed Apr 19 17:31:43 2017 Axel KoenigALiBaVa (IFX)run_001_Irrad_100V.dat00140000096, 64, 360NoUnknown

Remarks: Telescope run 628. Bias scan -100V, central position of sensor (DUT parallel to telescope planes at 360 deg due to different fixation compared to other DUTs). Telescope geometry identical to double irrad module.

Backside Biasing!

Telescope chiller turned on (15 deg).

Parameter Value
Alibava run run_001_Irrad_100V.dat
Telescope run 628
Triggers 400000
Alibava trigger eff. ~49%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 96 mm
Table z 64 mm
Tabe rot

360 deg

Temperature at DUT -14.5 +- 1 deg. celsius
Current 23.5 uA
ELOG V3.1.5-fc6679b