Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group, Page 3 of 4  Not logged in ELOG logo
Entry  Thu Jun 5 10:34:45 2014, Benedikt Würkner, Belle II, source, Silc Module, Silc Angle Measurement 10° 
Measured the Silc 03/10 Module using the Sr90 Source to have a comparison for the Eta-Distribution at different angles. 
Data can be found on heros in: /home/medialib/LAB_Silc_Angle. 
Plots made with TuxOA for all different regions can be found in /home/users/bwuerkner/plots/. 
Entry  Tue Apr 22 19:34:09 2008, Markus Friedl, SPS Testbeam June08, module, hybrid 01, Properties of hybrid 01, sensor fully bonded, HV=100V 6x
HV bias glued to backplane, HV=100V
Entry  Wed Apr 30 16:52:17 2008, Markus Friedl, BELLE Upgrade, module, micron, micron sensor glued to frame 
soeben haben wir den micron-DSSD (double metal layer) in den 2-teiligen rahmen geklebt und auf beiden seiten
temporäre kapton-stückerln aufgeklebt, über die bias appliziert werden kann. nach trocknung und bonden der
bias-verbindungen (montag, 5.5.2008) wird dieser für sensor-tests zur verfügung stehen.
Entry  Wed May 7 15:24:49 2008, Christian Irmler, SPS Testbeam June08, module, module 10/02, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively.
HV = 100 V
Ibias (100V) = 19.1 nA
Ibias (200V) = 23.7 nA
Entry  Wed May 7 15:26:24 2008, Christian Irmler, SPS Testbeam June08, module, module 20/09, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 25.1 nA
Ibias (200 V) = 31.4 nA
Entry  Wed May 7 15:40:07 2008, Christian Irmler, SPS Testbeam June08, module, module 07/07, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 20.2 nA
Ibias (200 V) = 21.9 nA
Entry  Wed May 7 16:12:58 2008, Christian Irmler, SPS Testbeam June08, module, module 12/08, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 22.2 nA
Ibias (200 V) = 26.5 nA
Entry  Wed May 7 19:05:08 2008, Christian Irmler, SPS Testbeam June08, module, module 04/04, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 27.8 nA
Ibias (200 V) = 32.7 nA
Entry  Fri May 9 09:56:15 2008, Christian Irmler, SPS Testbeam June08, module, module 06/03, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 26.5 nA
Ibias (200 V) = 37.8 nA
Entry  Fri May 9 10:00:34 2008, Christian Irmler, SPS Testbeam June08, module, module 03/10, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 18.9 nA
Ibias (200 V) = 25.5 nA
Entry  Fri May 9 10:04:26 2008, Christian Irmler, SPS Testbeam June08, module, module 05/05, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 18.0 nA
Ibias (200 V) = 23.6 nA
Entry  Tue May 19 14:48:06 2015, Hao Yin, Belle II, module, L6 Noise inJection Runs, L6 Noise inJection Runs 
Folder "L6_RLC_Test"

Configuration file: /mnt/data/ITA_NOISE_TESTS/L6_RLC_Test/SinglePeak_3Fadc.cfg

3 Tests: Injkection to 2.5V 1.25V. ground and their combination
Entry  Mon Nov 30 15:18:12 2015, Hao Yin, Belle II, module, ADC_DELAY_HOT, ADC delay hot 
ADC delay scan at room temp and 20 min after APV I2C config.

measured values at display in the FIR_HOT cfg file.

17:06 first run 20 min after i2c config.
Entry  Mon Nov 30 17:11:17 2015, Hao Yin, Belle II, module, FIRRun001, FIRRun001 aft ADC_HOT 
FirRun 20 min after I2C
Entry  Fri Apr 18 17:23:26 2008, Markus Friedl, SPS Testbeam June08, hybrid, hybrid 01, Noise of hybrid 01, sensor fully bonded, no HV hybrid01_sen_nohv_pednoise_apv0.pnghybrid01_sen_nohv_pednoise_apv1.png
HV bias not yet glued to backplane
Entry  Wed Oct 7 14:23:35 2009, Dieter Uhl, BELLE Upgrade, hybrid, #4, hybrid-pitchadapter pitchadapter4_lower_coat.gifpitchadapter4_lower_coat_opens.gifpitchadapter4_upper_coat.gifpitchadapter4_upper_coat_opens.gif
opens at upper coat
Entry  Wed Oct 7 14:24:06 2009, Dieter Uhl, BELLE Upgrade, hybrid, #5, hybrid-pitchadapter pitchadapter5_lower_coat_opens.gifpitchadapter5_lower_coat.gifpitchadapter5_upper_coat_opens.gifpitchadapter5_upper_coat.gif
shorts at upper coat
Entry  Tue May 19 09:31:50 2015, Hao Yin, , , , Noise Test ITA 
Everything works except L3 p-side.

The config file is shown in the following:

### Original Configuration File Name: /home/katsuro/tuxdaq_devel/config/delay_scan.latency_scan.cfg ###
Entry  Tue May 19 10:08:53 2015, Hao Yin, , , , FADC system setup success 
3 FADC. All Channel/APV25 running (except L3 n first and last -> not connected (bonding))

n-side: all connectors

p-side: 0x01: 1, 2, 4 and 0x02, 1 with L3 p and L4 p (Telescope)
Entry  Tue May 19 13:42:04 2015, Hao Yin, , , , L6 Noise inJection Setup P1000702.JPGP1000700.JPGP1000699.JPGP1000703.JPGP1000707.JPG
Test Nr. 1:

RLC between DockBox and Hybrid (both side).

Preliminary Test on L6, but all other sensors are connected.
ELOG V3.1.5-fc6679b