  HEPHY logbook of the Electronics Group, Page 3 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Thu May 8 16:51:03 2014, Benedikt Würkner, Belle II, source, L3 module, No 1 of 6 room temperature measurements using Sr90 Source (single) 10x
Sr90 Radioactive Source
No cooling
Module position: 0:0(top left)
Entry  Wed May 7 18:20:36 2014, Benedikt Würkner, Belle II, source, L3 module, No 6 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -57:-30(bottom right)
Entry  Wed May 7 17:33:21 2014, Benedikt Würkner, Belle II, source, L3 module, No 5 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -32:-30(bottom center)
Entry  Wed May 7 16:43:37 2014, Benedikt Würkner, Belle II, source, L3 module, No 4 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -5:-30(bottom left)
Entry  Wed May 7 15:53:38 2014, Benedikt Würkner, Belle II, source, L3 module, No 3 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -59:-20(top right)
Entry  Wed May 7 15:04:32 2014, Benedikt Würkner, Belle II, source, L3 module, No 2 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -32:-20(top center)
Entry  Wed May 7 14:36:29 2014, Benedikt Würkner, Belle II, source, L3 module, No 1 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -5:-20(top left)
Entry  Sun Jul 4 05:48:36 2010, Christian Irmler, BELLE Upgrade, source, Origami 6 - module 1, run002: first analysis results 7x
Run name: run002

Run type: 0 (Hardware (Normal Run))
Entry  Wed Oct 7 14:24:06 2009, Dieter Uhl, BELLE Upgrade, hybrid, #5, hybrid-pitchadapter pitchadapter5_lower_coat_opens.gifpitchadapter5_lower_coat.gifpitchadapter5_upper_coat_opens.gifpitchadapter5_upper_coat.gif
shorts at upper coat
Entry  Wed Oct 7 14:23:35 2009, Dieter Uhl, BELLE Upgrade, hybrid, #4, hybrid-pitchadapter pitchadapter4_lower_coat.gifpitchadapter4_lower_coat_opens.gifpitchadapter4_upper_coat.gifpitchadapter4_upper_coat_opens.gif
opens at upper coat
Entry  Tue May 20 14:27:50 2008, Markus Friedl, BELLE Upgrade, source, micron, analysis results of source test 9x

*** NOTE: AFTER THIS MEASUREMENT WE REALIZED THAT BIASING WAS NOT DONE PROPERLY
          HENCE THE RESULTS BELOW ARE NOT RELIABLE 
Entry  Fri May 9 10:04:26 2008, Christian Irmler, SPS Testbeam June08, module, module 05/05, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 18.0 nA
Ibias (200 V) = 23.6 nA
Entry  Fri May 9 10:00:34 2008, Christian Irmler, SPS Testbeam June08, module, module 03/10, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 18.9 nA
Ibias (200 V) = 25.5 nA
Entry  Fri May 9 09:56:15 2008, Christian Irmler, SPS Testbeam June08, module, module 06/03, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 26.5 nA
Ibias (200 V) = 37.8 nA
Entry  Wed May 7 19:05:08 2008, Christian Irmler, SPS Testbeam June08, module, module 04/04, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 27.8 nA
Ibias (200 V) = 32.7 nA
Entry  Wed May 7 16:12:58 2008, Christian Irmler, SPS Testbeam June08, module, module 12/08, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 22.2 nA
Ibias (200 V) = 26.5 nA
Entry  Wed May 7 15:40:07 2008, Christian Irmler, SPS Testbeam June08, module, module 07/07, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 20.2 nA
Ibias (200 V) = 21.9 nA
Entry  Wed May 7 15:26:24 2008, Christian Irmler, SPS Testbeam June08, module, module 20/09, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively. 
HV = 100 V
Ibias (100 V) = 25.1 nA
Ibias (200 V) = 31.4 nA
Entry  Wed May 7 15:24:49 2008, Christian Irmler, SPS Testbeam June08, module, module 10/02, properties (noise, intcal), APVs bonded to the sensor 12x
Module tested with 1 and 2 rows bonded to the sensor, respectively.
HV = 100 V
Ibias (100V) = 19.1 nA
Ibias (200V) = 23.7 nA
Entry  Wed Apr 30 16:52:17 2008, Markus Friedl, BELLE Upgrade, module, micron, micron sensor glued to frame 
soeben haben wir den micron-DSSD (double metal layer) in den 2-teiligen rahmen geklebt und auf beiden seiten
temporäre kapton-stückerln aufgeklebt, über die bias appliziert werden kann. nach trocknung und bonden der
bias-verbindungen (montag, 5.5.2008) wird dieser für sensor-tests zur verfügung stehen.