Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group, Page 1 of 4  Not logged in ELOG logo
ID Date Author Project Measurement Typeup Object ID Subject Text Attachments
  37   Tue May 19 09:31:50 2015 Hao Yin   Noise Test ITAEverything works except L3 p-side.

The config file is shown in the
following:
  
  38   Tue May 19 10:08:53 2015 Hao Yin   FADC system setup success3 FADC. All Channel/APV25 running (except
L3 n first and last -> not connected (bonding))

n-side: all connectors
  
  42   Tue May 19 13:42:04 2015 Hao Yin   L6 Noise inJection SetupTest Nr. 1:

RLC between DockBox and Hybrid
(both side).
 P1000702.JPGP1000700.JPGP1000699.JPGP1000703.JPGP1000707.JPG 
  44   Wed May 20 10:12:12 2015 Hao Yin   Ladder RLC test (CMC Injection)L5 Ladder Test

folder: /mnt/data/ITA_NOISE_TESTS/Ladder_test

Setup: ladder
  
  45   Thu May 21 18:23:22 2015 Hao Yin   Noise Injection LV cable(TestNr. 15)

injecting sin wave into LV at different
 P1000717.JPG 
  46   Fri May 22 12:01:32 2015 Hao Yin   CMC injection LV 10VComparison w/o filter (LC) connected to
-z_n side.

Mateo has the results.
  
  51   Mon Nov 30 15:12:19 2015 Hao Yin   FIR_ADC configFIR filter and ADC delay test:
ADC delay and FIR filter with and
without cooling to reproduce error detected
  
  1   Fri Apr 18 17:23:26 2008 Markus FriedlSPS Testbeam June08hybridhybrid 01Noise of hybrid 01, sensor fully bonded, no HVHV bias not yet glued to backplane  hybrid01_sen_nohv_pednoise_apv0.pnghybrid01_sen_nohv_pednoise_apv1.png 
  15   Wed Oct 7 14:23:35 2009 Dieter UhlBELLE Upgradehybrid#4hybrid-pitchadapteropens at upper coat
 pitchadapter4_lower_coat.gifpitchadapter4_lower_coat_opens.gifpitchadapter4_upper_coat.gifpitchadapter4_upper_coat_opens.gif 
  16   Wed Oct 7 14:24:06 2009 Dieter UhlBELLE Upgradehybrid#5hybrid-pitchadaptershorts at upper coat
 pitchadapter5_lower_coat_opens.gifpitchadapter5_lower_coat.gifpitchadapter5_upper_coat_opens.gifpitchadapter5_upper_coat.gif 
  2   Tue Apr 22 19:34:09 2008 Markus FriedlSPS Testbeam June08modulehybrid 01Properties of hybrid 01, sensor fully bonded, HV=100VHV bias glued to backplane, HV=100V  6x 
  5   Wed Apr 30 16:52:17 2008 Markus FriedlBELLE Upgrademodulemicronmicron sensor glued to framesoeben haben wir den micron-DSSD (double metal
layer) in den 2-teiligen rahmen geklebt und
auf beiden seiten
  
  6   Wed May 7 15:24:49 2008 Christian IrmlerSPS Testbeam June08modulemodule 10/02properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively.
HV = 100 V
Ibias
(100V) = 19.1 nA
Ibias (200V) = 23.7 nA
 12x 
  9   Wed May 7 15:26:24 2008 Christian IrmlerSPS Testbeam June08modulemodule 20/09properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 25.1 nA
Ibias (200 V) = 31.4 nA
 12x 
  8   Wed May 7 15:40:07 2008 Christian IrmlerSPS Testbeam June08modulemodule 07/07properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 20.2 nA
Ibias (200 V) = 21.9 nA
 12x 
  7   Wed May 7 16:12:58 2008 Christian IrmlerSPS Testbeam June08modulemodule 12/08properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 22.2 nA
Ibias (200 V) = 26.5 nA
 12x 
  10   Wed May 7 19:05:08 2008 Christian IrmlerSPS Testbeam June08modulemodule 04/04properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 27.8 nA
Ibias (200 V) = 32.7 nA
 12x 
  11   Fri May 9 09:56:15 2008 Christian IrmlerSPS Testbeam June08modulemodule 06/03properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 26.5 nA
Ibias (200 V) = 37.8 nA
 12x 
  12   Fri May 9 10:00:34 2008 Christian IrmlerSPS Testbeam June08modulemodule 03/10properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 18.9 nA
Ibias (200 V) = 25.5 nA
 12x 
  13   Fri May 9 10:04:26 2008 Christian IrmlerSPS Testbeam June08modulemodule 05/05properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 18.0 nA
Ibias (200 V) = 23.6 nA
 12x 
ELOG V3.1.5-fc6679b