Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group, Page 1 of 4  Not logged in ELOG logo
Entry  Tue May 19 09:31:50 2015, Hao Yin, , , , Noise Test ITA 
Everything works except L3 p-side.

The config file is shown in the following:

### Original Configuration File Name: /home/katsuro/tuxdaq_devel/config/delay_scan.latency_scan.cfg ###
Entry  Tue May 19 10:08:53 2015, Hao Yin, , , , FADC system setup success 
3 FADC. All Channel/APV25 running (except L3 n first and last -> not connected (bonding))

n-side: all connectors

p-side: 0x01: 1, 2, 4 and 0x02, 1 with L3 p and L4 p (Telescope)
Entry  Tue May 19 13:42:04 2015, Hao Yin, , , , L6 Noise inJection Setup P1000702.JPGP1000700.JPGP1000699.JPGP1000703.JPGP1000707.JPG
Test Nr. 1:

RLC between DockBox and Hybrid (both side).

Preliminary Test on L6, but all other sensors are connected.
Entry  Wed May 20 10:12:12 2015, Hao Yin, , , , Ladder RLC test (CMC Injection) 
L5 Ladder Test

folder: /mnt/data/ITA_NOISE_TESTS/Ladder_test

Setup: ladder only, noise injection on one hybrid (injection point = cable between hybrid and junction board, see attachment
Entry  Thu May 21 18:23:22 2015, Hao Yin, , , , Noise Injection LV cable P1000717.JPG
(TestNr. 15)

injecting sin wave into LV at different frequencies to analyse the output frequency and noise ground level after the junction borad.
Entry  Fri May 22 12:01:32 2015, Hao Yin, , , , CMC injection LV 10V 
Comparison w/o filter (LC) connected to -z_n side.

Mateo has the results.
Entry  Mon Nov 30 15:12:19 2015, Hao Yin, , , , FIR_ADC config 
FIR filter and ADC delay test:
ADC delay and FIR filter with and without cooling to reproduce error detected during CERN beam test 2015.
 
Entry  Wed Apr 30 16:52:17 2008, Markus Friedl, BELLE Upgrade, module, micron, micron sensor glued to frame 
soeben haben wir den micron-DSSD (double metal layer) in den 2-teiligen rahmen geklebt und auf beiden seiten
temporäre kapton-stückerln aufgeklebt, über die bias appliziert werden kann. nach trocknung und bonden der
bias-verbindungen (montag, 5.5.2008) wird dieser für sensor-tests zur verfügung stehen.
Entry  Tue May 20 14:27:50 2008, Markus Friedl, BELLE Upgrade, source, micron, analysis results of source test 9x

*** NOTE: AFTER THIS MEASUREMENT WE REALIZED THAT BIASING WAS NOT DONE PROPERLY
          HENCE THE RESULTS BELOW ARE NOT RELIABLE 
Entry  Wed Oct 7 14:23:35 2009, Dieter Uhl, BELLE Upgrade, hybrid, #4, hybrid-pitchadapter pitchadapter4_lower_coat.gifpitchadapter4_lower_coat_opens.gifpitchadapter4_upper_coat.gifpitchadapter4_upper_coat_opens.gif
opens at upper coat
Entry  Wed Oct 7 14:24:06 2009, Dieter Uhl, BELLE Upgrade, hybrid, #5, hybrid-pitchadapter pitchadapter5_lower_coat_opens.gifpitchadapter5_lower_coat.gifpitchadapter5_upper_coat_opens.gifpitchadapter5_upper_coat.gif
shorts at upper coat
Entry  Sun Jul 4 05:48:36 2010, Christian Irmler, BELLE Upgrade, source, Origami 6 - module 1, run002: first analysis results 7x
Run name: run002

Run type: 0 (Hardware (Normal Run))
Entry  Wed May 7 14:36:29 2014, Benedikt Würkner, Belle II, source, L3 module, No 1 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -5:-20(top left)
Entry  Wed May 7 15:04:32 2014, Benedikt Würkner, Belle II, source, L3 module, No 2 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -32:-20(top center)
Entry  Wed May 7 15:53:38 2014, Benedikt Würkner, Belle II, source, L3 module, No 3 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -59:-20(top right)
Entry  Wed May 7 16:43:37 2014, Benedikt Würkner, Belle II, source, L3 module, No 4 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -5:-30(bottom left)
Entry  Wed May 7 17:33:21 2014, Benedikt Würkner, Belle II, source, L3 module, No 5 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -32:-30(bottom center)
Entry  Wed May 7 18:20:36 2014, Benedikt Würkner, Belle II, source, L3 module, No 6 of 6 room temperature measurements using Sr90 Source (multi6) 10x
Sr90 Radioactive Source
No cooling
Module position: -57:-30(bottom right)
Entry  Thu May 8 16:51:03 2014, Benedikt Würkner, Belle II, source, L3 module, No 1 of 6 room temperature measurements using Sr90 Source (single) 10x
Sr90 Radioactive Source
No cooling
Module position: 0:0(top left)
Entry  Thu May 8 16:51:57 2014, Benedikt Würkner, Belle II, source, L3 module, No 2 of 6 room temperature measurements using Sr90 Source (single) 
Failed with Error: "***ERROR*** Init NECO failed,  Return code: -32761"
Restarted and it works again
Sr90 Radioactive Source
ELOG V3.1.5-fc6679b