Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group, Page 1 of 4  Not logged in ELOG logo
  ID Dateup Author Project Measurement Type Object ID Subject
  1   Fri Apr 18 17:23:26 2008 Markus FriedlSPS Testbeam June08hybridhybrid 01Noise of hybrid 01, sensor fully bonded, no HV
HV bias not yet glued to backplane
  2   Tue Apr 22 19:34:09 2008 Markus FriedlSPS Testbeam June08modulehybrid 01Properties of hybrid 01, sensor fully bonded, HV=100V
HV bias glued to backplane, HV=100V
  3   Wed Apr 23 13:05:05 2008 Christian IrmlerSPS Testbeam June08sourcehybrid 01time correlation between TDC and sensor measurement -> 3.1 ns RMS
  4   Wed Apr 23 13:37:18 2008 Markus FriedlSPS Testbeam June08sourcehybrid 01analysis results of source test
Ignore the "KEK November 2007" title - that's a legacy and is already changed :-)

As of now, there is no distinction in 16 separate zones. However, the gaps between the the zones are clearly visible in the Hit Profile, as the edge strips on both sides have a larger sensitive area and thus collect more hits than other strips; hence the spikes in the (otherwise pretty gaussian) beam profile. There is a single strip with no entries in the center - that's the one that suffered from the bias bond repair action.
SNR=21 (peak mode) is pretty healthy and fits to similar detectors operated with APV25.
All data was taken in multi-peak mode with subsequent hit fitting to obtain amplitude and timing (see separate posting for timing precision).

The verbose output of the analysis is pasted below.


Analysis of vie_run001

Peak Mode, 3 x 200 initevents (first 10 skipped) + 99400 events
Number hybrids:  1	number zones:  2	 number sensors:  1
Using calibration file vie_cal001
No pedestal correction file
Seed/Neighbor/Cluster/Noisy Strips Cuts [RMS noise]: 5.0/3.0/5.0
Min. hitlength:   3


Comments:
SILC module 01
HV=100V, 40MHz, Tp=50ns, 30ns
Sr90 1mCi ,  black cloth cover



Analysis date: 23.04.2008 13:25:09


Analysis settings:
 runname: vie_run001_cluster
 clock: 40.00 MHz
 datafilepath: data/
 outputpath: output/
 subevents:  6
 fitmode: 2 (cal. fit)
 options: h




Results:

ModuleName           ZoneType    Ch    OKCh     OK%   Entries    MClW    MPSignal   Noise   MPSNR   HpSE  Occup
p_side            JP single sensor    256    256   100.0     90385    2.53    21546.1    729.4   20.68   0.53   1.81
  5   Wed Apr 30 16:52:17 2008 Markus FriedlBELLE Upgrademodulemicronmicron sensor glued to frame
soeben haben wir den micron-DSSD (double metal layer) in den 2-teiligen rahmen geklebt und auf beiden seiten
temporäre kapton-stückerln aufgeklebt, über die bias appliziert werden kann. nach trocknung und bonden der
bias-verbindungen (montag, 5.5.2008) wird dieser für sensor-tests zur verfügung stehen.
  6   Wed May 7 15:24:49 2008 Christian IrmlerSPS Testbeam June08modulemodule 10/02properties (noise, intcal), APVs bonded to the sensor
Module tested with 1 and 2 rows bonded to the sensor, respectively. HV = 100 V Ibias (100V) = 19.1 nA Ibias (200V) = 23.7 nA
  9   Wed May 7 15:26:24 2008 Christian IrmlerSPS Testbeam June08modulemodule 20/09properties (noise, intcal), APVs bonded to the sensor
Module tested with 1 and 2 rows bonded to the sensor, respectively. HV = 100 V Ibias (100 V) = 25.1 nA Ibias (200 V) = 31.4 nA
  8   Wed May 7 15:40:07 2008 Christian IrmlerSPS Testbeam June08modulemodule 07/07properties (noise, intcal), APVs bonded to the sensor
Module tested with 1 and 2 rows bonded to the sensor, respectively. HV = 100 V Ibias (100 V) = 20.2 nA Ibias (200 V) = 21.9 nA
  7   Wed May 7 16:12:58 2008 Christian IrmlerSPS Testbeam June08modulemodule 12/08properties (noise, intcal), APVs bonded to the sensor
Module tested with 1 and 2 rows bonded to the sensor, respectively. HV = 100 V Ibias (100 V) = 22.2 nA Ibias (200 V) = 26.5 nA
  10   Wed May 7 19:05:08 2008 Christian IrmlerSPS Testbeam June08modulemodule 04/04properties (noise, intcal), APVs bonded to the sensor
Module tested with 1 and 2 rows bonded to the sensor, respectively. HV = 100 V Ibias (100 V) = 27.8 nA Ibias (200 V) = 32.7 nA
  11   Fri May 9 09:56:15 2008 Christian IrmlerSPS Testbeam June08modulemodule 06/03properties (noise, intcal), APVs bonded to the sensor
Module tested with 1 and 2 rows bonded to the sensor, respectively. HV = 100 V Ibias (100 V) = 26.5 nA Ibias (200 V) = 37.8 nA
  12   Fri May 9 10:00:34 2008 Christian IrmlerSPS Testbeam June08modulemodule 03/10properties (noise, intcal), APVs bonded to the sensor
Module tested with 1 and 2 rows bonded to the sensor, respectively. HV = 100 V Ibias (100 V) = 18.9 nA Ibias (200 V) = 25.5 nA
  13   Fri May 9 10:04:26 2008 Christian IrmlerSPS Testbeam June08modulemodule 05/05properties (noise, intcal), APVs bonded to the sensor
Module tested with 1 and 2 rows bonded to the sensor, respectively. HV = 100 V Ibias (100 V) = 18.0 nA Ibias (200 V) = 23.6 nA
  14   Tue May 20 14:27:50 2008 Markus FriedlBELLE Upgradesourcemicronanalysis results of source test
*** NOTE: AFTER THIS MEASUREMENT WE REALIZED THAT BIASING WAS NOT DONE PROPERLY
          HENCE THE RESULTS BELOW ARE NOT RELIABLE 
          (in fact it is surprising that they are not worse) ***


Please find the results of the lab source test on the new Micron module here.
It is read out with 3 + 3 APV chips on either side.

Results table of the source measurement:
                      p-side     n-side
 Cluster signal [e]    18361      19434
 Strip noise [e]        1142       1193
 Avg cluster width      1.91       1.30
 Single strip SNR       16.1       16.3
 Cluster SNR            11.6       14.3
 Strip pitch [um]       50.0      153.5     

Apparently, the double metal capacitance is not so bad as expected, even though the Micron sensor does not use
the hourglass crossing scheme. Presumably the dielectric between metal 1 and 2 is rather thick (several um).
Strip noise is roughly the same on both p and n side, so the difference in Cluster SNR (*) only stems from the
unequal cluster width (which is a result of the different pitches).

Peak time precision vs SNR (last plot below) is worse compared to the values obtained with various HPK sensors
in the November 2007 beam test at KEK. However, this is a comparison of source and beam and thus might not be
significant. Let's see what we will get in the SPS beam test next week.

(*) Cluster SNR := sum(signal) / (strip_noise * sqrt(cluster_width) )
  15   Wed Oct 7 14:23:35 2009 Dieter UhlBELLE Upgradehybrid#4hybrid-pitchadapter

opens at upper coat

pitchadapter4_upper_coat_opens.gif

 

shorts at upper coat

pitchadapter4_upper_coat.gif

 

opens at lower coat

pitchadapter4_lower_coat_opens.gif

 

shorts at lower coat

pitchadapter4_lower_coat.gif

  16   Wed Oct 7 14:24:06 2009 Dieter UhlBELLE Upgradehybrid#5hybrid-pitchadapter

shorts at upper coat

pitchadapter5_upper_coat.gif

 

opens at upper coat

pitchadapter5_upper_coat_opens.gif

 

shorts at lower coat

pitchadapter5_lower_coat.gif

 

opens at lower coat

pitchadapter5_lower_coat_opens.gif

  17   Sun Jul 4 05:48:36 2010 Christian IrmlerBELLE UpgradesourceOrigami 6 - module 1run002: first analysis results

Run name: run002

Run type: 0 (Hardware (Normal Run))
Comments:
After ~40min warmup
HV=80
90Sr 1mCi source - moved compared to run001
multi6

Max. Events=100000      Trg delay=25

Origami 6 module #1
w/o cooling
sensor: B2HPK_10938-9239_8

n-side: all 4 APVs read out
p-side: APV #0 to #3  read out, analog output of #4 and #5 were not connected to FADC board

 

 

  18   Wed May 7 14:36:29 2014 Benedikt WürknerBelle IIsourceL3 moduleNo 1 of 6 room temperature measurements using Sr90 Source (multi6)

Sr90 Radioactive Source
No cooling
Module position: -5:-20(top left)
HV Turned to +40,-40V with currents. +1.2 and -1.2 µA

N+1.25V current: 0.22A
N+2.5 V current: 0.56A
P+1.25V current: 0.26A
P+2.50V current: 0.70A

Events: 200000

  19   Wed May 7 15:04:32 2014 Benedikt WürknerBelle IIsourceL3 moduleNo 2 of 6 room temperature measurements using Sr90 Source (multi6)

Sr90 Radioactive Source
No cooling
Module position: -32:-20(top center)
HV Turned to +40,-40V with currents. +1.23 and -1.25 µA

N+1.25V current: 0.22A
N+2.50V current: 0.56A
P+1.25V current: 0.26A
P+2.50V current: 0.71A

Events: 200000

  20   Wed May 7 15:53:38 2014 Benedikt WürknerBelle IIsourceL3 moduleNo 3 of 6 room temperature measurements using Sr90 Source (multi6)

Sr90 Radioactive Source
No cooling
Module position: -59:-20(top right)
HV Turned to +40,-40V with currents. +1.25 and -1.26 µA

N+1.25V current: 0.22A
N+2.50V current: 0.56A
P+1.25V current: 0.26A
P+2.50V current: 0.71A

Events: 200000

ELOG V3.1.5-fc6679b