Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group, Page 1 of 4  Not logged in ELOG logo
  IDup Date Author Project Measurement Type Object ID Subject Text Attachments
  1   Fri Apr 18 17:23:26 2008 Markus FriedlSPS Testbeam June08hybridhybrid 01Noise of hybrid 01, sensor fully bonded, no HVHV bias not yet glued to backplane  hybrid01_sen_nohv_pednoise_apv0.pnghybrid01_sen_nohv_pednoise_apv1.png 
  2   Tue Apr 22 19:34:09 2008 Markus FriedlSPS Testbeam June08modulehybrid 01Properties of hybrid 01, sensor fully bonded, HV=100VHV bias glued to backplane, HV=100V  6x 
  3   Wed Apr 23 13:05:05 2008 Christian IrmlerSPS Testbeam June08sourcehybrid 01time correlation between TDC and sensor measurement -> 3.1 ns RMS   vie_run001_tpeak_vs_TDC.gif 
  4   Wed Apr 23 13:37:18 2008 Markus FriedlSPS Testbeam June08sourcehybrid 01analysis results of source testIgnore the "KEK November 2007" title - that's
a legacy and is already changed :-)
 vie_run001_cluster_sig_0.gifvie_run001_cluster_noi_0.gifvie_run001_cluster_hit_0.gifvie_run001_cluster_clw_0.gif 
  5   Wed Apr 30 16:52:17 2008 Markus FriedlBELLE Upgrademodulemicronmicron sensor glued to framesoeben haben wir den micron-DSSD (double metal
layer) in den 2-teiligen rahmen geklebt und
auf beiden seiten
  
  6   Wed May 7 15:24:49 2008 Christian IrmlerSPS Testbeam June08modulemodule 10/02properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively.
HV = 100 V
Ibias
(100V) = 19.1 nA
Ibias (200V) = 23.7 nA
 12x 
  7   Wed May 7 16:12:58 2008 Christian IrmlerSPS Testbeam June08modulemodule 12/08properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 22.2 nA
Ibias (200 V) = 26.5 nA
 12x 
  8   Wed May 7 15:40:07 2008 Christian IrmlerSPS Testbeam June08modulemodule 07/07properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 20.2 nA
Ibias (200 V) = 21.9 nA
 12x 
  9   Wed May 7 15:26:24 2008 Christian IrmlerSPS Testbeam June08modulemodule 20/09properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 25.1 nA
Ibias (200 V) = 31.4 nA
 12x 
  10   Wed May 7 19:05:08 2008 Christian IrmlerSPS Testbeam June08modulemodule 04/04properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 27.8 nA
Ibias (200 V) = 32.7 nA
 12x 
  11   Fri May 9 09:56:15 2008 Christian IrmlerSPS Testbeam June08modulemodule 06/03properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 26.5 nA
Ibias (200 V) = 37.8 nA
 12x 
  12   Fri May 9 10:00:34 2008 Christian IrmlerSPS Testbeam June08modulemodule 03/10properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 18.9 nA
Ibias (200 V) = 25.5 nA
 12x 
  13   Fri May 9 10:04:26 2008 Christian IrmlerSPS Testbeam June08modulemodule 05/05properties (noise, intcal), APVs bonded to the sensorModule tested with 1 and 2 rows bonded to
the sensor, respectively. 
HV = 100 V
Ibias
(100 V) = 18.0 nA
Ibias (200 V) = 23.6 nA
 12x 
  14   Tue May 20 14:27:50 2008 Markus FriedlBELLE Upgradesourcemicronanalysis results of source test
*** NOTE: AFTER THIS MEASUREMENT WE REALIZED
THAT BIASING WAS NOT DONE PROPERLY
 9x 
  15   Wed Oct 7 14:23:35 2009 Dieter UhlBELLE Upgradehybrid#4hybrid-pitchadapteropens at upper coat
 pitchadapter4_lower_coat.gifpitchadapter4_lower_coat_opens.gifpitchadapter4_upper_coat.gifpitchadapter4_upper_coat_opens.gif 
  16   Wed Oct 7 14:24:06 2009 Dieter UhlBELLE Upgradehybrid#5hybrid-pitchadaptershorts at upper coat
 pitchadapter5_lower_coat_opens.gifpitchadapter5_lower_coat.gifpitchadapter5_upper_coat_opens.gifpitchadapter5_upper_coat.gif 
  17   Sun Jul 4 05:48:36 2010 Christian IrmlerBELLE UpgradesourceOrigami 6 - module 1run002: first analysis resultsRun name: run002

Run type: 0 (Hardware (Normal Run))
 7x 
  18   Wed May 7 14:36:29 2014 Benedikt WürknerBelle IIsourceL3 moduleNo 1 of 6 room temperature measurements using Sr90 Source (multi6)Sr90 Radioactive Source
No cooling
Module position: -5:-20(top left)
 10x 
  19   Wed May 7 15:04:32 2014 Benedikt WürknerBelle IIsourceL3 moduleNo 2 of 6 room temperature measurements using Sr90 Source (multi6)Sr90 Radioactive Source
No cooling
Module position: -32:-20(top center)
 10x 
  20   Wed May 7 15:53:38 2014 Benedikt WürknerBelle IIsourceL3 moduleNo 3 of 6 room temperature measurements using Sr90 Source (multi6)Sr90 Radioactive Source
No cooling
Module position: -59:-20(top right)
 10x 
ELOG V3.1.5-fc6679b