Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group  Not logged in ELOG logo
Message ID: 26     Entry time: Thu May 8 16:51:03 2014
Type: Measurement 
Author: Benedikt Würkner 
Project: Belle II 
Subject: No 1 of 6 room temperature measurements using Sr90 Source (single) 
Object ID: L3 module 
Measurement Type: source 
Run Number: run07 

Sr90 Radioactive Source
No cooling
Module position: 0:0(top left)
HV Turned to +40,-40V with currents. +1.0 and -1.0 µA

N+1.25V current: 0.22A
N+2.50V current: 0.57A
P+1.25V current: 0.26A
P+2.50V current: 0.72A

Events: 200000

Attachment 1: run07_all_hits_apv0.png  196 kB  Uploaded Thu May 8 17:54:16 2014  | Hide | Hide all | Show all
run07_all_hits_apv0.png
Attachment 2: run07_all_hits_apv1.png  192 kB  Uploaded Thu May 8 17:54:24 2014  | Hide | Hide all | Show all
run07_all_hits_apv1.png
Attachment 3: run07_all_hits_apv2.png  194 kB  Uploaded Thu May 8 17:54:28 2014  | Hide | Hide all | Show all
run07_all_hits_apv2.png
Attachment 4: run07_all_hits_apv3.png  194 kB  Uploaded Thu May 8 17:54:33 2014  | Hide | Hide all | Show all
run07_all_hits_apv3.png
Attachment 5: run07_all_hits_apv4.png  193 kB  Uploaded Thu May 8 17:54:37 2014  | Hide | Hide all | Show all
run07_all_hits_apv4.png
Attachment 6: run07_all_hits_apv5.png  194 kB  Uploaded Thu May 8 17:54:43 2014  | Hide | Hide all | Show all
run07_all_hits_apv5.png
Attachment 7: run07_all_hits_apv6.png  192 kB  Uploaded Thu May 8 17:54:46 2014  | Hide | Hide all | Show all
run07_all_hits_apv6.png
Attachment 8: run07_all_hits_apv7.png  193 kB  Uploaded Thu May 8 17:54:51 2014  | Hide | Hide all | Show all
run07_all_hits_apv7.png
Attachment 9: run07_all_hits_apv8.png  188 kB  Uploaded Thu May 8 17:54:56 2014  | Show | Hide all | Show all
Attachment 10: run07_all_hits_apv9.png  188 kB  Uploaded Thu May 8 17:55:01 2014  | Hide | Hide all | Show all
run07_all_hits_apv9.png
ELOG V3.1.5-fc6679b