Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group  Not logged in ELOG logo
Message ID: 17     Entry time: Sun Jul 4 05:48:36 2010
Type: Measurement 
Author: Christian Irmler 
Project: BELLE Upgrade 
Subject: run002: first analysis results 
Object ID: Origami 6 - module 1 
Measurement Type: source 
Run Number:  

Run name: run002

Run type: 0 (Hardware (Normal Run))
Comments:
After ~40min warmup
HV=80
90Sr 1mCi source - moved compared to run001
multi6

Max. Events=100000      Trg delay=25

Origami 6 module #1
w/o cooling
sensor: B2HPK_10938-9239_8

n-side: all 4 APVs read out
p-side: APV #0 to #3  read out, analog output of #4 and #5 were not connected to FADC board

 

 

Attachment 1: run002_cluster_sum.txt  1 kB  | Show | Show all
Attachment 2: run002_cluster_noi_0.ps  39 kB
Attachment 3: run002_cluster_sig_0.ps  40 kB
Attachment 4: run002_cluster_hit_0.ps  1.297 MB
Attachment 5: run002_cluster_hpt_0.ps  26 kB
Attachment 6: run002_cluster_clw_0.ps  900 kB
Attachment 7: run002_cluster_cor_0.ps  326 kB
ELOG V3.1.5-fc6679b