Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Silicon Envelope for the Large Protoype TPC, Page 2 of 2  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Typeup Subject Text Attachments
  30   Fri Nov 27 12:22:19 2009 Stephan HänselMeasurementsRun 20075 - Micromegas 81746196 events (usable: 42433 events)
with 2 Micromegas modules (TPCDAQ
stopped at 46195 events)
 20075_HitProfile.jpgOneTrackEvents_020075.txtTwoTrackEvents_020075.txt 
  31   Fri Nov 27 12:23:25 2009 Stephan HänselMeasurementsRun 20077 - Pedestal16196 events
with 2 Micromegas modules
Beam: 5,6 GeV
  
  1   Wed Oct 1 11:42:44 2008 stephan hänselSetupModulkomponentenMODULE 0
1 Sensor Module (SiLC01):
   Hybrid: TEC_6D.2.1 /
  
  4   Fri Feb 27 14:03:53 2009 Stephan HänselSetupSetup 3D   090227_TPCEnvelope-3D_copy.png 
  5   Thu Oct 22 08:02:26 2009 Stephan HänselSetupElectronicsHV-Kapton-PIN-assignment

  
  
  6   Thu Oct 22 08:04:51 2009 Stephan HänselSetupgeometry - silicon envelopedistance si-sledge-front to silicon-Z-center
= 23 cm
-> silicon sledge front 35 cm
 SiLC_in_front_of_TPC.jpg 
  7   Thu Oct 22 11:18:34 2009 Stephan HänselSetupPicturesPhoto
Gallery
zusätliche Photos:
  
  12   Mon Nov 2 13:22:50 2009 Stephan HänselSetupDAQstart data-taking:
ssh xxx@bastion.desy.de -X
ssh xdaq@flctpcikhero1.desy.de -X
  
  13   Mon Nov 2 13:59:09 2009 Stephan HänselSetupToDo before data-takingin hut:

    plug twisted pair cable
from CCUM into PC (Attention - connector
  
  14   Tue Nov 3 10:45:01 2009 Stephan HänselSetupBeam Onclear test beam areas:
go to T24 (front area):

    use (red) key from interlock
  
  15   Tue Nov 3 11:18:46 2009 Stephan HänselSetupBeam Offclose shutter:

    close shutter T24/1 with
the button "Beam  Shutter zu"
  
ELOG V3.1.5-fc6679b