  25   Thu Nov 5 19:34:58 2009 Stephan HänselMeasurementsRun 20065 - pedestal18400 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
  
  26   Thu Nov 5 19:36:48 2009 Stephan HänselMeasurementsRun 20069 - pedestal13600 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
  
  27   Thu Nov 5 19:44:28 2009 Stephan HänselMeasurementsRun 20070 - positionrun2257 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
  
  28   Thu Nov 5 19:46:15 2009 Stephan HänselMeasurementsRun 20073 - Micromegas 81510070 events
with 2 Micromegas modules (TPCDAQ
stopped at 9864 events)
 OneTrackEvents_020073.txtTwoTrackEvents_020073.txt 
  29   Fri Nov 27 12:21:00 2009 Stephan HänselMeasurementsRun 20074 - Micromegas 81610010 events
with 2 Micromegas modules (TPCDAQ
stopped at 10003 events)
 OneTrackEvents_020074.txtTwoTrackEvents_020074.txt 
  30   Fri Nov 27 12:22:19 2009 Stephan HänselMeasurementsRun 20075 - Micromegas 81746196 events (usable: 42433 events)
with 2 Micromegas modules (TPCDAQ
stopped at 46195 events)
 20075_HitProfile.jpgOneTrackEvents_020075.txtTwoTrackEvents_020075.txt 
  31   Fri Nov 27 12:23:25 2009 Stephan HänselMeasurementsRun 20077 - Pedestal16196 events
with 2 Micromegas modules
Beam: 5,6 GeV
  
  2   Wed Feb 25 09:57:15 2009 Stephan HänselMeasurementsSensor IV-Kurven + CV-Messungen (vor Modulbau) 
 IV-Kurven_Sensors.png 
  4   Fri Feb 27 14:03:53 2009 Stephan HänselSetupSetup 3D   090227_TPCEnvelope-3D_copy.png 
  13   Mon Nov 2 13:59:09 2009 Stephan HänselSetupToDo before data-takingin hut:

    plug twisted pair cable
from CCUM into PC (Attention - connector
  
  6   Thu Oct 22 08:04:51 2009 Stephan HänselSetupgeometry - silicon envelopedistance si-sledge-front to silicon-Z-center
= 23 cm
-> silicon sledge front 35 cm
 SiLC_in_front_of_TPC.jpg 